Regulation 126. Stand pipes and pads etc.

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 580

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

126. Stand pipes and pads etc..─Stand pipes and seating for carrying mountings shall be made of wrought, cast of fabricated steel. These shall take the form of short stand pipes, pressed steel plate saddles, forged pads or pads cut from round rolled bar as may be most convenient and secured to the boiler by welding. Where short stand pipes are used they shall be of solid forged, fabricated or cast steel. They shall be carefully bedded to the shell before attachment. The jointing faces to which mountings are to be bolted shall be machined. Pads shall have sufficient thickness to allow the drilling of stud holes for mountings without the inner surface being pierced and the length of the screwed portion of the stud in the pad shall be not less than the diameter of the stud.

Independent explanation — not the law · draft · engineer review in progress

In short

Stand pipes and seatings carrying mountings must be wrought, cast or fabricated steel, secured to the boiler by welding.

Key points

  • Forms allowed: short stand pipes, pressed steel plate saddles, forged pads, or pads cut from round rolled bar.
  • Short stand pipes must be solid forged, fabricated or cast steel and carefully bedded to the shell before attachment.
  • Jointing faces for bolted mountings must be machined.
  • Pads must be thick enough to drill stud holes without piercing the inner surface. The screwed length of the stud in the pad must be at least the stud diameter.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
411Pads100%Chapter X (DPIIT scan), image 4
635Stand pipes, nozzles, pads and seatings for mounting and their attachments91%Chapter XV (DPIIT scan), image 3
IBR 1950 regulation 411 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 411 page for its amendments.

Reg. 410, Reg. 411, Reg. 412
RIVETED STEEL BOILERS

Flange-Thickness and Drilling

The thickness and drilling of flanges of standpipes shall be in accordance with the Appendix (E).



Reg. 411
RIVETED STEEL BOILERS

Pads

These shall comply with Regulation 155.



Reg. 412
RIVETED STEEL BOILERS

Unstayed Flat-End Plates

The working pressure of unstayed flat-end plates shall be determined by the following formula:

W.P. = 2S(t-2)² Eqn. (98)
D²

Where,

t = thickness of plate in thirty-seconds of an inch.
W.P. = Working pressure in pounds per square inch.
D = Diameter in inches of the pitch circle of the bolts or rivets when the plate is attached to an outside flange or the internal diameter of the shell when the plate is attached to an inside flange.
S = Minimum tensile stress of the plate in tons per square inch.

In no case shell the thickness of an unstayed flat-end plate be less than 3/8 inch.

Where an unstayed flat-end plate is pierced for electrodes or other fittings by openings having a diameter not greater than 2 ½ inches and the pitch of the openings in inches is not less than four times the diameter of the openings in inches, compensation is not required.

Where the diameter of the openings in an unstayed flat-end plate is greater than 2 ½ inches or the pitch in inches is less than four times the diameter of the openings, adequate compensation shall be provided in the manner described in Regulations 170, 171 and 186.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
580
PDF page index
580 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 0c90ba7ac80c35f5
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 126, Regulation 126, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.580. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.