Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 126 — Furnace Crown
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 126 FURNACES Furnace Crown
|
Earlier text: the 2008 DIPP web edition
FURNACES
GENERAL
Furnace Crown
a)The furnace crown shall be made from one plate and the seam connecting it to the furnace shall not fall in line with any circumferential seam of the boiler shell.
b)The furnace crown may be riveted to the vertical portion of the firebox, or alternatively, the joint may be fusion butt welded by the electric arc process, provided the conditions as to fusion welding in Regulation 125 are observed. Where the joint is to be welded the edges of the furnace crown and the firebox body shall be beveled in accordance with Fig. 3 or Fig. 4. The depth of the flange of the furnace crown plate from the commencement of the curvature of the flanging radius shall be not less than four times the plate thickness with a minimum of 1½ inches. On completion of welding the firebox shall be effectively stress relieved by heat treatment (see also Reg. 128).
Possible IBR 2026 successors (heading match, unverified): Reg. 98, Reg. 489