Regulation 128 — Uptakes

Unofficial DPIIT web edition · not verified0 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 128
FURNACES
Uptakes

a)

The uptakes shall be formed from weldless steel pipes or from plate or strip rolled and electric resistance welded or fusion butt welded pipes by electric arc process. The tolerances on these pipes shall comply with the requirements of Regulation 345.

b) As an alternative to riveting the uptake may be fusion butt welded by the electric arc process to the upward flange of the opening in the firebox crown plate provided the conditions as to fusion welding in Regulation 125 are observed. The edges of the upward flange and the adjacent end of the uptake shall be beveled in accordance with Fig. 3 or Fig. 4. The depth of the crown plate opening from the commencement of the curvature of the flanging radius shall be not less than twice the plate thickness with a minimum of 1 inch. On completion of welding the uptake and crown plate shall be effectively stress relieved by heat treatment.

Where the firebox crown plate is also fusion welded to the body of the firebox, the firebox complete with uptake shall be effectively stress relieved by heat treatment on completion of the welding.
c) Welded uptakes shall be so arranged that the weld is directly facing the longitudinal centre line of the manhole.
Earlier text: the 2008 DIPP web edition

FURNACES

GENERAL

Uptakes

a)The uptakes shall be formed from weldless steel pipes or from plate or strip rolled and electric resistance welded or fusion butt welded pipes by electric arc process. The tolerances on these pipes shall comply with the requirements of Regulation 345.

b)As an alternative to riveting the uptake may be fusion butt welded by the electric arc process to the upward flange of the opening in the firebox crown plate provided the conditions as to fusion welding in Regulation 125 are observed. The edges of the upward flange and the adjacent end of the uptake shall be beveled in accordance with Fig. 3 or Fig. 4. The depth of the crown plate opening from the commencement of the curvature of the flanging radius shall be not less than twice the plate thickness with a minimum of 1 inch. On completion of welding the uptake and crown plate shall be effectively stress relieved by heat treatment.

Where the firebox crown plate is also fusion welded to the body of the firebox, the firebox complete with uptake shall be effectively stress relieved by heat treatment on completion of the welding.

c)Welded uptakes shall be so arranged that the weld is directly facing the longitudinal centre line of the manhole.