Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 300. Procedure for Registration
Not yet checked against the official Gazette; verify before relying on it.
300. Procedure for Registration.─ (1) On receipt of an application for registration under sub-section (1) of Section 12 of the Act, along with certificates and drawings as provided in regulation-8, the Inspector shall, when the boiler has been properly prepared for examination proceed to inspect it with a view to satisfy himself that the boiler has not suffered any damage during its transit from the place of manufacture to the site of erection and if he is satisfied with the correctness of the maker’s certificate and other particulars relating to the material and construction as mentioned under clause (c) of sub-section (1) of section 19 of the Act and regulation 7, take due account of the workmanship and details of the construction of each part;
(2)Subject to any discretionary power exercised by the Chief Inspector, he may accept the permissible working pressure of the boiler as certified by the Inspecting Authority in Form-I(Part-B) or Form-I(Part-C) as the case may be and Form-IV(Part-A) and after inspecting the boiler, the Inspector shall conduct hydraulic test as per requirements of regulations 298 and a provisional order under section 14 in Form-X shall be issued after the hydraulic test.
(3)If the requirements of provisional order under sub-regulation (2) are not fulfilled, fresh provisional orders shall be issued for a maximum of another six months but not exceeding twelve months from the date of issue of first provisional order, without any subsequent inspection and payment of fees.
(4)The Inspector shall enter the above particulars and dimensions of the boiler, together with details of the hydraulic test, in Form-XI (Memorandum of Inspection Book) provided under regulation 306 and with all the makers’ papers for the boiler, shall be submitted to the Chief Inspector with the Inspector’s report after issue of registry number, the Inspector shall conduct steam test as per regulation 299 and enter the details of steam test in Form-XI.
Reg. 7 · Reg. 298 · Reg. 299 · Reg. 306 · Act s.12 · Act s.19 · Form-I (Part B) · Form-I (Part C) · Form-IV (Part A) · Form-X · Form-XI
In short
Regulation 300 sets the Inspector's procedure for registering a boiler, from site inspection through hydraulic test, provisional order and steam test.
Key points
- (1) On an application under sub-section (1) of Section 12 of the Act, with certificates and drawings per regulation 8, the Inspector inspects the prepared boiler. He checks it was not damaged in transit, checks the maker's certificate and particulars (section 19 of the Act and regulation 7), and takes account of workmanship.
- (2) Subject to the Chief Inspector's discretion, he may accept the working pressure certified by the Inspecting Authority in Form-I (Part-B or Part-C) and Form-IV (Part-A). He then conducts the hydraulic test per regulation 298, after which a provisional order under section 14 is issued in Form-X.
- (3) If the provisional order's requirements are not met, fresh provisional orders may be issued for up to another six months, but not beyond twelve months from the first order, without re-inspection or fees.
- (4) Particulars and hydraulic test details go into Form-XI (Memorandum of Inspection Book) under regulation 306, and are sent with the maker's papers and report to the Chief Inspector. After the registry number is issued, the Inspector conducts the steam test per regulation 299 and records it in Form-XI.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 381 | Procedure for registration | 100% | Chapter IX (DPIIT scan), image 2 |
| 525 | Procedure for Registration | 100% | Chapter XI (DPIIT scan), image 7 |
| 385 | Registration fee | 86% | Chapter IX (DPIIT scan), image 4 |
Amendment history of the candidate IBR 1950 regulations: Reg. 381 (2 amendments) · Reg. 525 (1 amendment) · Reg. 385 (5 amendments)
IBR 1950 regulation 381 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 381 page for its amendments.
| Reg. 381
|
IBR 1950 regulation 525 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 525 page for its amendments.
| Reg. 524, Reg. 525 REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | |||||||||||||||||||
| |||||||||||||||||||
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | |||||||||||||||||||
|
| Next >>> |
IBR 1950 regulation 385 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 385 page for its amendments.
| Reg. 384
Reg. 385
| ||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 300, Regulation 300, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.701. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).