Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration

Regulation 320. Miscellaneous provisions for repairs

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 720–721

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

320. Miscellaneous provisions for repairs.─ (1) (a)The repairs shall be supervised, so far as his other duties permit by the Competent Person.

(b)When the fire boxes and smoke tubes of locomotive tube boilers are withdrawn, the opportunity shall be taken to inspect the internal parts which are otherwise inaccessible to close inspection.

(2)Repairs to boiler shells shall be effected either by patching or by removing a strips of worn or damaged plate and inserting the new strip with covering straps over the longitudinal butt ends, the strength of the riveted joints shall be not less than that of the longitudinal joints of the shell.

(3)(a) Patches for fire exposed plates shall be fitted metal to metal without joint of any description. The affected part shall be cut out, leaving the corners of the hole rounded.

(b)Patches shall be secured, wherever possible, properly spaced rivets with a width of plate at least equal to the diameter or rivet between the edge of the rivet hole and the edge of the plate.

(c)Where riveting is impracticable, the plate shall be secured by welt fitting countersunk headed screw pins.

(4)The thickness of a patch plate shall not be less than the original thickness of the plate which it is used to patch.

(5)Bulged or distorted furnaces of circular section may, if the bulge of distortion is not too great, be pressed back to shape.

(6)Circular furnaces horizontal boilers that have become distorted may be suitably reinforced.

(7)Anti-collapse rings shall be of substantial section either of single or double angles bolted back to back with screw stays not less than 22 mm in diameter and about 178 mm in pitch passes through flat of angle and screwed into the furnace, the ends being rounded over on the fire side and fitted with nuts at the other. The stay bolts shall be fitted with ferrules not less than 25 mm in depth between furnace and angle ring.

(8)Welding shall not be accepted for the repairs of any part of a boiler for which welding is forbidden for a new boiler under these Regulations. Boiler shells shall not be repaired by welding beyond the filling up of a small isolated corroded or pitted or the making up of wasted edges of openings.

(9)Cracks or grooving in dished or flat end plate of cylindrical shells or in the bends of furnace flanges in circumferential direction may be weed out and welded.

(10)Wasted parts of circular furnaces and fire boxes and fire exposed flat plates as in rectangular fire boxes and combustion chambers may be cut out and be replaced by new pieces welded in or they may be built up by welding. Longitudinal cracks in circular furnaces and fire-boxes and cracks in rectangular fire-boxes and combustion chambers may be welded.

(11)No Stay bar shall be welded.

(12)For the purposes of these Regulations renewed part shall be deemed to be parts of a new boiler intended for use at the pressure at which the boiler under renewal is used.

(13)For Butt Welding of Smoke Tubes, Smoke tubes may be butt welded either by fusion welding, flush welding or oxy-acetylene welding, and these should be tested hydraulically at the discretion of the Chief Inspector.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 320 collects miscellaneous repair rules. Most of them repeat the repair rules in regulation 317, with two additions on renewed parts and smoke tube testing.

Key points

  • (1) Repairs are supervised by the Competent Person so far as his other duties permit. Withdrawal of locomotive fireboxes and smoke tubes is an opportunity to inspect otherwise inaccessible parts.
  • (2)–(4) Shell repairs by patching or strip insertion, metal-to-metal patches on fire-exposed plates, and patch thickness at least equal to the original plate.
  • (5)–(7) Pressing back or reinforcing distorted circular furnaces. Anti-collapse rings with screw stays not less than 22 mm in diameter at about 178 mm pitch and ferrules not less than 25 mm deep.
  • (9)–(10) Permitted welding of cracks, grooving and wasted parts of end plates, furnaces, fireboxes and combustion chambers.
  • (12) Renewed parts are treated as parts of a new boiler intended for the pressure at which the boiler is used.
  • (13) Smoke tubes may be butt-welded by fusion, flush or oxy-acetylene welding, and hydraulic testing is at the Chief Inspector's discretion.

Watch out

  • (8) No welding repair on any part where welding is forbidden for a new boiler. Shells may be welded only to fill small isolated corroded or pitted areas or make up wasted edges of openings.
  • (11) No stay bar may be welded.
  • Regulation 317 gives the Inspecting Authority discretion over hydraulic testing of welded smoke tubes, while this regulation names the Chief Inspector.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
720–721
PDF page index
720–721 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash e3d20891f4f87d5b
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 320, Regulation 320, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.720–721. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.