Regulation 326. Inspection fee for valves and flanges

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 726–728TableFormula / symbols

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

326. Inspection fee for valves and flanges.─ Fees for inspection of valves and flanges shall be charged as specified in Table 8/14.

Table 8/14

Inspection fee for valves and flanges (regulation 326)
Category No.ProductCalculation CriteriaInspection Fee in Rs.InputRemarks
(1)(2)(3)(4)(5)(6)
1Valves<= 25 mm15 per pieceNominal BoreMin Rs.
600 per
inspection
> 25 mm
<= 100 mm
45 per piece
> 100 mm
<= 250 mm
270 per piece
> 250 mm720 per piece
2Forged and
Cast
Flanges
<= 25 mmfor a batch
of 50 or
part
thereof
225Nominal Bore
and Batch
size

Table structure read from the Gazette PDF, page 726. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Category Product             Calculation Criteria         Inspection Fee Input                 Remarks
   No.                                                         in Rs.

        (1)        (2)                  (3)                   (4)                    (5)       (6)

        1    Valves          <= 25 mm                     15 per piece    Nominal Bore         Min Rs.
                             > 25 mm                      45 per piece                         600 per
                             <= 100 mm                                                         inspection

                             > 100 mm                     270 per piece

                             <= 250 mm

                             > 250 mm                     720 per piece

        2    Forged and <= 25 mm             for a batch      225         Nominal Bore

             Cast                            of 50 or                     and Batch

             Flanges                         part                         size

                                             thereof


                            <= 25 mm  for a batch      390

                                      of 100 or

                                      part

                                      thereof

                            > 25 mm   for a batch      435

                            <= 50 mm  of 50 or
                                      part

                                      thereof

                            > 50 mm   for a batch      435

                            <= 100mm  of 25 or
                                      part

                                      thereof

                            > 100 mm for a batch       465

                            <= 250 mm of 10 or

                                      part

                                      thereof

                            > 250 mm  for a batch      540

                                      of 5 or part

                                      thereof
<= 25 mmfor a batch
of 100 or
part
thereof
390
> 25 mm
<= 50 mm
for a batch
of 50 or
part
thereof
435
> 50 mm
<= 100mm
for a batch
of 25 or
part
thereof
435
> 100 mm
<= 250 mm
for a batch
of 10 or
part
thereof
465
> 250 mmfor a batch
of 5 or part
thereof
540
3Plate
Flanges
<=25 mmfor a batch
of 50 or
part
thereof
112Nominal Bore
and Batch
size
Half the
rate as
charged for
Forged and
Cast
Flanges
<=25 mmfor a batch
of 100 or
part
thereof
195
> 25 mm
<= 50 mm
for a batch
of 50 or
part
thereof
217
> 50 mm
<= 100mm
for a batch
of 25 or
part
thereof
217
> 100 mm
<= 250 mm
for a batch
of 10 or
part
thereof
232
> 250 mmfor a batch270
of 5 or part
thereof

Table structure read from the Gazette PDF, pages 727, 728. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
3                  Plate    <=25 mm   for a batch      112  Nominal Bore  Half the
                                                            and Batch     rate as
                   Flanges            of 50 or              size          charged for
                                                                          Forged and
                                      part                                Cast
                                                                          Flanges
                                      thereof

                            <=25 mm   for a batch      195

                                      of 100 or

                                      part

                                      thereof

                            > 25 mm   for a batch      217

                            <= 50 mm  of 50 or
                                      part

                                      thereof

                            > 50 mm   for a batch      217

                            <= 100mm  of 25 or
                                      part

                                      thereof

                            > 100 mm for a batch       232

                            <= 250 mm of 10 or

                                      part

                                      thereof


                       > 250 mm   for a batch        270

                                  of 5 or part

                                  thereof

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 326 sets inspection fees for valves and flanges, as given in Table 8/14.

Key points

  • Valves: charged per piece, by nominal bore band, with a minimum fee per inspection.
  • Forged and cast flanges: charged per batch, with batch size and fee depending on nominal bore.
  • Plate flanges: half the rate charged for forged and cast flanges, using the same nominal bore and batch bands.
  • See the Official text tab for the bands and amounts.

Watch out

  • These flange rates are also used to price pipe fittings under regulation 324.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
410Flanges100%Chapter X (DPIIT scan), image 4
524Preparation for inspection70%Chapter XI (DPIIT scan), image 7
IBR 1950 regulation 410 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 410 page for its amendments.

Reg. 410, Reg. 411, Reg. 412
RIVETED STEEL BOILERS

Flange-Thickness and Drilling

The thickness and drilling of flanges of standpipes shall be in accordance with the Appendix (E).



Reg. 411
RIVETED STEEL BOILERS

Pads

These shall comply with Regulation 155.



Reg. 412
RIVETED STEEL BOILERS

Unstayed Flat-End Plates

The working pressure of unstayed flat-end plates shall be determined by the following formula:

W.P. = 2S(t-2)² Eqn. (98)
D²

Where,

t = thickness of plate in thirty-seconds of an inch.
W.P. = Working pressure in pounds per square inch.
D = Diameter in inches of the pitch circle of the bolts or rivets when the plate is attached to an outside flange or the internal diameter of the shell when the plate is attached to an inside flange.
S = Minimum tensile stress of the plate in tons per square inch.

In no case shell the thickness of an unstayed flat-end plate be less than 3/8 inch.

Where an unstayed flat-end plate is pierced for electrodes or other fittings by openings having a diameter not greater than 2 ½ inches and the pitch of the openings in inches is not less than four times the diameter of the openings in inches, compensation is not required.

Where the diameter of the openings in an unstayed flat-end plate is greater than 2 ½ inches or the pitch in inches is less than four times the diameter of the openings, adequate compensation shall be provided in the manner described in Regulations 170, 171 and 186.

IBR 1950 regulation 524 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 524 page for its amendments.

Reg. 524, Reg. 525
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Preparation for inspection

a)

At each inspection the economiser shall be emptied and thoroughly cleaned internally and externally and in the flues. All mountings shall be opened up and all caps, doors and blank flanges removed to permit adequate inspection.
b) The owner of an economiser to which this Regulation is applicable shall obtain the approval of the Chief Inspector in writing to the method of disconnection which he proposes to use and shall be responsible for ensuring that the method so approved is followed in practice.


Reg. 525

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure for Registration
a) On receipt of an application for registration the Inspector shall, after the economiser has been prepared for examination, take full particulars of the design and ascertain the working pressure allowed by the Regulations.
b)

The fitness of the economiser parts shall be determined as per the following formulae:-

(i)

Cast Iron Smooth Tube Economisers with Pressed Socket Joints.

WP = AZ + 225N Eqn.(124)
70a n

Where,

WP=Design pressure in pounds per square inch (gauge).
A= Area of contact surface of a single socket, square inches.
a= Cross sectional area measured on the mean diameter of a socket hole, in square inches.
Z=Breakdown load of an unreinforced socket joint in pounds.
N=Number of stays per header.
n=Number of sockets per header.

For existing standard designs the breakdown load of an unreinforced socket joint shall be taken as not greater than 13,500 lbs. For designs not already in use before the date of this standard the corresponding figure shall be taken as not greater than 75 per cent of the load as determined by experiment.
(ii) Headers of approximately rectangular cross section.

WP = C(t-2) Eqn.(125)
b²
Where,

t = Thickness in thirty-second of an inch.
b = Distance between the sides of header supporting the surface, in inches.
WP= Design pressure, in pounds per square inch (gauge)
C = 11 where the water side surface is flat

= 22 where the water side surface is curved, provided that the curvature is continued without interruption and the thickness at each end of the side is not less than that determined with C=11.

In no case, however, shall the thickness of the side of a header be less than 16 thirty-seconds of an inch at any part.
Next >>>

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
726–728
PDF page index
726–728 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 802ee134e0d295e6
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 326, Regulation 326, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.726–728. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.