Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 315. Ageing of heat recovery steam generators (HRSGs)
Not yet checked against the official Gazette; verify before relying on it.
315. Ageing of heat recovery steam generators (HRSGs).─Heat Recovery Steam Generators (HRSGs) which are operating at a temperature of 400°C (main steam outlet temperature) and above shall be non-destructively tested by the Remnant Life Assessment Organisation for the components as per Table 8/8 given below under this rule after they are in operation for 100,000 hours for assessment of remnant life of the components.
TABLE 8/6
| Serial No. | Component | Visual | Ultra- Sonic Testing | Mag- netic Par- ticle inspe- ction | Liquid Dye Pene- trant Inspe- ction | Repli- cation | Samp- ling | Deposit Ana- lysis | Outside Dia- metre and thick- ness | Fibre Optic Inspe- ction | Hard- ness | Others |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 1. | Steam Drum | Yes | Yes | Yes | Yes | Yes | No | Yes@ | Yes* | No | Yes | |
| 2. | Water drum | Yes | Yes | Yes | Yes | Yes | No | Yes@ | Yes* | No | Yes | |
| 3. | Bottom Headers | Yes | Yes | No | Yes | No | No | No | Yes | Yes | Yes | |
| 4. | Low Temperature header (Less than 4000C) | Yes | Yes | No | Yes | No | No | No | Yes | Yes | Yes | |
| 5. | Attemperator header | Yes | Yes | No | Yes | Yes | No | No | Yes | Yes | Yes | Swell measurement |
| 6. | Economiser Tubes | Yes | No | No | No | No | Yes | No | Yes | No | Yes# | |
| 7. | Convention Super-heater Coils | Yes | No | No | No | No | Yes | No | Yes | No | Yes# | |
| 8. | Primary Superheater Coils | Yes | No | No | No | No | Yes | No | Yes | No | Yes# | Non-destructive oxide thickness inspection |
| 9. | Prefinal Super-heater Coiles | Yes | No | No | No | No | Yes$ $ | No | Yes | No | Yes# | |
| 10. | Final Super-heat Coils | Yes | No | No | No | No | Yes$ $ | No | Yes | No | Yes# | |
| 11. | Reheater Coils | Yes | No | No | No | No | Yes$ $ | No | Yes | No | Yes# | |
| 12. | High temperature headers (4000C & above) | Yes | Yes | No | Yes | Yes | No | YNo | Yes | Yes | Yes | |
| 13. | Main steam piping | Yes | No | No | No | Yes | No | No | Yes | No | Yes | |
| 14. | Cold Reheat Piping | Yes | No | No | No | Yes | No | No | Yes | No | Yes | |
| 15. | Hot Reheat Piping | Yes | No | No | No | Yes | No | No | Yes | No | Yes | |
| 16. | SH/RH Links | Yes | Yes | No | Yes | Yes | No | No | Yes | No | No | |
| 17. | Boiler Banks tubes | Yes | No | No | No | No | No | No | Yes | No | No | |
| 18. | Furnace Water walls | Yes | No | No | No | No | Yes | Yes@ | Yes | No | No |
Table structure read from the Gazette PDF, page 714. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
Serial No. Component Visu Ultra- Mag- Liquid Repli- Samp- Depos Outside Fibre Hard- Others
Dye cation ling it Dia- Optic ness
1 2 al Sonic netic Pene- Ana- metre Inspe-
1. Steam Drum trant lysis and ction
2. Water drum Testing Par- Inspe- thick-
3. Bottom Headers ction ness
4. Low Temperature header ticle
(Less than 4000C)
5. Attemperator header inspe-
6. ction
7.
8. 3 4 5 6 7 8 9 10 11 12 13
Yes Yes Yes Yes Yes No Yes@ Yes* No Yes
Yes Yes Yes Yes Yes No Yes@ Yes* No Yes
Yes Yes No Yes No No No Yes Yes Yes
Yes Yes No Yes No No No Yes Yes Yes
Yes Yes No Yes Yes No No Yes Yes Yes Swell
Yes# measurement
Economiser Tubes Yes No No No No Yes No Yes No Yes#
Yes# Non-destructive
Convention Super-heater Coils Yes No No No No Yes No Yes No oxide thickness
Yes#
Primary Superheater Coils Yes No No No No Yes No Yes No Yes# inspection
Yes#
9. Prefinal Super-heater Coiles Yes No No No No Yes$ No Yes No Yes
$
10. Final Super-heat Coils Yes No No No No Yes$ No Yes No
$
11. Reheater Coils Yes No No No No Yes$ No Yes No
$
12. High temperature headers Yes Yes No Yes Yes No YNo Yes Yes
(4000C & above)
13. Main steam piping Yes No No No Yes No No Yes No Yes
Yes
14. Cold Reheat Piping Yes No No No Yes No No Yes No Yes
No
15. Hot Reheat Piping Yes No No No Yes No No Yes No No
No
16. SH/RH Links Yes Yes No Yes Yes No No Yes No
17. Boiler Banks tubes Yes No No No No No No Yes No
18. Furnace Water walls Yes No No No No Yes Yes@ Yes NoNote: Other Components shall be checked/examined visually.
*OD or ID measurement to be taken for steam drum and water drum/bottom headers. # Hardness of Tube samples (both inside and outside) to be checked at Laboratory. @ Deposit analysis to be done.
$$ Sample shall be subjected to accelerated creep rupture test.
TABLE 8/7
| Serial No. | Component | Visual | Ultra- Sonic Testing | Mag- netic Par- ticle inspe- ction | Liquid Dye Pene- Trant Inspe- ction | Repli- cation | Samp- ling | Deposit Ana- lysis | Outside Dia- metre and thick- ness | Fibre Optic Inspe- ction | Hard- ness | Others |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 1. | Steam Drum | Yes | Yes | Yes | Yes | Yes | No | Yes@ | Yes* | No | No | |
| 2. | Water drum | Yes | Yes | Yes | Yes | Yes | No | Yes@ | Yes* | No | No | |
| 3. | Economiser Tubes | Yes | No | No | No | No | Yes | No | Yes | No | No | |
| 4. | Convection Superheater Coils | Yes | No | No | No | No | Yes | No | Yes | No | No | |
| 5. | Primary Superheater Coils | Yes | No | No | No | No | Yes | No | Yes | No | No | |
| 6. | Final Superheater Coils | Yes | No | No | No | No | Yes | No | Yes | No | No | |
| 7. | Water Headers | Yes | Yes | No | Yes | No | No | No | Yes | Yes | No | |
| 8. | Steam headers | Yes | Yes | No | Yes | No | No | No | Yes | Yes | No | |
| 9. | Bank Tubes | Yes | No | No | No | No | No | No | Yes | No | No | |
| 10. | Furnace Water wall | Yes | No | No | No | No | Yes | Yes@ | Yes | No | No | |
| 11. | Main Steam Piping | Yes | No | No | Yes | No | No | No | Yes | No | No | |
| Serial No. | Component | Visual | Ultra- Sonic Testing | Mag- netic Par- ticle inspe- ction | Liquid Dye Pene- Trant Inspe- ction | Repli- cation | Samp- ling | Deposit Ana- lysis | Outside Dia- metre and thick- ness | Fibre Optic Inspe- ction | Hardness | Others |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 1. | SH/RH Tubes | No | No | No | No | No | Yes* | No | No | No | Yes* | |
| 2. | SH/RH Inlet & Outlet Header | Yes | No | No | No | Yes # | No | No | Yes | No | Yes | |
| 3. | DESH Header | Yes | No | No | No | Yes# | No | No | Yes | No | Yes | |
| 4. | DESH Inlet & Outlet Link | Yes | No | No | No | Yes# | No | No | Yes | No | Yes | |
| 5. | Drum | Yes | Yes | Yes | Yes | Yes | No | Yes | ID & Thick- ness | No | Yes | |
| 6. | Down Comers | Yes | No | No | No | No | No | No | Yes | No | Yes | |
| 7. | Evaporator Outlet Links | Yes | No | No | No | No | No | No | Yes | No | Yes | |
| 8. | Evaporator tubes | No | No | No | No | No | Yes* | Yes* | No | No | Yes* | |
| 9. | Economiser Tubes | No | No | No | No | No | Yes* | Yes* | No | No | Yes* | |
| 10. | Economiser Inlet & Outlet Header | Yes | No | No | No | No | No | No | No | No | Yes | |
| 11. | Economiser to Drum Link | Yes | No | No | No | No | No | No | Yes | No | Yes |
Table structure read from the Gazette PDF, pages 715, 716. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
Serial No. Component Visual Ultra- Mag- Liquid Repli- Samp- Deposit Outside Fibre Hard- Others
Sonic netic Dye cation ling Ana- Dia- Optic ness
3 Testing Par- Pene- lysis metre Inspe-
Yes ticle Trant and ction
Yes 4 inspe- Inspe- thick-
Yes Yes ction ction ness
Yes Yes
1 2 Yes No 5 6 7 8 9 10 11 12 13
Yes No Yes Yes*
1. Steam Drum Yes No Yes Yes Yes No Yes@ Yes* No No
Yes No No Yes
2. Water drum Yes Yes No Yes Yes No Yes@ Yes No No
Yes Yes No Yes
3. Economiser Tubes Yes No No No No Yes No Yes No No
No No Yes
4. Convection Superheater Coils No No No No Yes No Yes No No
No Yes
5. Primary Superheater Coils No No No Yes No Yes No No
No Yes
6. Final Superheater Coils No No Yes No No No
7. Water Headers Yes No No No Yes No
8. Steam headers Yes No No No Yes No
9. Bank Tubes No No No No No No
10. Furnace Water wall No No Yes Yes@ No No
11. Main Steam Piping Yes No No No No NoNote: Other Components shall be checked/examined visually.
*OD or ID measurement to be taken for steam drum and water drum/bottom headers. # Hardness of Tube samples (both inside and outside) to be checked at Laboratory. @ Deposit analysis shall be undertaken at laboratory.
TABLE 8/8
Original extracted text of the table above, continued (diagnostic)
Serial No. Component Visual Ultra- Mag- Liquid Repli- Samp- Deposit Outside Fibre Hardness Others
Sonic netic Dye cation ling Ana- Dia- Optic
1 2 3 Testing Par- Pene- lysis metre Inspe-
1. SH/RH Tubes No ticle Trant and ction
2. SH/RH Inlet & Yes inspe- Inspe- thick-
3. Outlet Header Yes ction ction ness 11
4. DESH Header Yes No
5. DESH Inlet & Outlet Link Yes 4 5 6 7 8 9 10 No 12 13
Drum No
No No No No Yes* No Yes No Yes*
No
No No No Yes # No No Yes No Yes
Yes
No No No Yes# No No ID & No Yes
Thick- No Yes
No No No Yes# No No ness No Yes
Yes No
Yes Yes Yes Yes No Yes Yes No
No
6. Down Comers Yes No No No No No No No No Yes
No No No Yes
7. Evaporator Outlet Links Yes No No No No Yes* Yes* Yes*
Yes* Yes* Yes Yes*
8. Evaporator tubes No No No No No No No Yes
9. Economiser Tubes No No No No No No No Yes
10. Economiser Inlet & Outlet Yes No No No No
Header
11. Economiser to Drum Link Yes No No No No* To be decided based on history of failure.
# For the SH/RH headers above 400°C.
Parts of this extracted text look garbled; read the Gazette page before using any value.
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Regulation 315 requires heat recovery steam generators (HRSGs) operating at 400°C (main steam outlet temperature) and above to be non-destructively tested by the Remnant Life Assessment Organisation after 100,000 hours of operation, for the components in Table 8/8. It also holds the component test tables used by regulation 314.
Key points
- Table 8/6: water tube boilers at 400°C and above. Lists components (drums, headers, economiser and superheater coils, reheater coils, piping, links, bank tubes, water walls) against tests such as visual, ultrasonic, magnetic particle, dye penetrant, replication, sampling, deposit analysis, diameter and thickness, fibre optic and hardness.
- Table 8/7: water tube boilers below 400°C, with a similar layout.
- Table 8/8: HRSGs, covering SH/RH tubes and headers, DESH headers and links, drum, down comers, evaporator links and tubes, and economiser tubes, headers and links.
- Notes to the tables cover drum OD or ID measurement, laboratory hardness checks on tube samples, deposit analysis and, for some samples, accelerated creep rupture tests. Components not listed are checked visually.
Watch out
- The extracted tables are badly misaligned, so the "Yes/No" entries cannot be read reliably here. Check the Gazette page for the exact test matrix.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.





Indian Boiler Regulations, 2026, reg. 315, Regulation 315, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.713–717. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.