Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 325. Inspection fee for pipes
Not yet checked against the official Gazette; verify before relying on it.
325. Inspection fee for pipes.─ Inspection fee for pipes shall be as specified in Table 8/13.
Table 8/13
Inspection fee for pipes (regulation 325)
| Category No. | Product | Calculation Criteria | Inspection Fee in Rs. | Input | |
|---|---|---|---|---|---|
| (1) | (2) | (3) | (4) | (5) | |
| 1 | Pipes (Inclusive of all fittings excepting fittings like de- superheaters, steam receivers, feed heaters and separately fired superheaters) | NB <= 100 mm | For 30 meters of pipe or part thereof | 500 (Min 500) | Length in Meter |
| NB > 100 mm | For 30 meters of pipe or part thereof | 1200 (Min 1200) | |||
Table structure read from the Gazette PDF, page 726. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
Category Product Calculation Criteria Inspection Fee in Input
No. Rs.
(1) (2) NB <= 100 (3) (4) (5)
1 Pipes (Inclusive of all mm For 30 meters 500 Length in
fittings excepting of pipe or part Meter
fittings like de- NB > 100 thereof (Min 500)
superheaters, steam mm For 30 meters
receivers, feed heaters of pipe or part 1200
and separately fired thereof (Min 1200)
superheaters)Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Inspection fees for pipes are set in Table 8/13. Pipes (including all fittings except de-superheaters, steam receivers, feed heaters and separately fired superheaters) are charged for every 30 meters of pipe or part thereof, with one rate for NB up to 100 mm and a higher rate for NB above 100 mm, each with a minimum fee. See the Official text tab for the amounts.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 524 | Preparation for inspection | 74% | Chapter XI (DPIIT scan), image 7 |
IBR 1950 regulation 524 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 524 page for its amendments.
| Reg. 524, Reg. 525 REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | |||||||||||||||||||
| |||||||||||||||||||
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | |||||||||||||||||||
|
| Next >>> |
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 325, Regulation 325, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.726. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.