Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 306. Memorandum of Inspection Book
Not yet checked against the official Gazette; verify before relying on it.
306. Memorandum of Inspection Book .─ (1) A Memorandum of Inspection Book shall be prepared for each boiler in Form-XI and the Inspector shall enter all particulars in ink and dimensions of the boilers with the particulars of hydraulic test and steam test and his inspection notes in this book;
(2)At subsequent inspection, Competent Person shall enter the dates of the Inspections, hydraulic tests and steam tests, when such are made with their notes thereon;
(3)the Inspector or Competent Person, as the case may be, shall also enter in the Memorandum of Inspection Book, the general condition of the boiler and of repairs, to what extent boilers have been cleared of brick work, a report of all casual visits for inspection of repairs, for inspection of main steam pipes, and reports on accidents;
(4)(a) On submission of the Memorandum Book to the Chief Inspector, he will in the case of newly registered boilers, check all particulars and calculations and approve the design pressure that is to be permitted.
(b)In the case of old boilers, the Chief Inspector shall examine the Inspector’s notes of inspection and proposals made for repairs or reduction of pressure.
(c)A pressure once approved for the boiler shall not be altered without the written authority of the Chief Inspector.
(d)The Memorandum of Inspection Book shall be kept clean and up-to-date and the Inspection Book except when actually required by the Competent Person, shall be kept in the office of the Chief Inspector.
In short
Regulation 306 requires a Memorandum of Inspection Book in Form-XI for each boiler. It is the running record of the boiler's particulars, tests, inspections and repairs.
Key points
- (1) The Inspector enters, in ink, all particulars and dimensions of the boiler, the hydraulic test and steam test particulars, and the inspection notes.
- (2) At later inspections, the Competent Person enters the dates of inspections, hydraulic tests and steam tests, with notes.
- (3) The Inspector or Competent Person also records the general condition of the boiler, repairs, how far the boiler was cleared of brickwork, casual visits to inspect repairs or main steam pipes, and reports on accidents.
- (4)(a) For newly registered boilers, the Chief Inspector checks all particulars and calculations and approves the design pressure.
- (4)(b) For old boilers, the Chief Inspector examines the inspection notes and any proposals for repairs or pressure reduction.
- (4)(d) The book must be kept clean and up to date. It stays in the Chief Inspector's office except when the Competent Person actually needs it.
Watch out
- (4)(c) Once a pressure is approved for a boiler, it cannot be altered without the Chief Inspector's written authority.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 528 | Memorandum of Inspection Book | 100% | Chapter XI (DPIIT scan), image 8 |
Amendment history of the candidate IBR 1950 regulation: Reg. 528 (1 amendment)
IBR 1950 regulation 528 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 528 page for its amendments.
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | ||||||||||
| ||||||||||
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | ||||||||||
| ||||||||||
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | ||||||||||
|
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 306, Regulation 306, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.706–707. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.