Indian Boiler Regulations, 2026
Chapter 8 — Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
40 regulations (293–332)Gazette starts p.696
Regulation headings are not yet verified against the official Gazette. Entries in [square brackets] are editorial navigation labels, not Gazette wording.
← Chapter 7: Pipes and Fittings · Chapter 9: Safety of Persons inside Boilers →
- 293. General
- 294. Boiler component’s identification marking
- 295. Preparations of Inspection
- 296. Hydraulic test of boilers
- 297. Preparation for hydraulic tests
- 298. Procedure of hydraulic tests
- 299. Steam tests
- 300. Procedure for Registration
- 301. Engraving of registry number
- 302. Measurement of Heating Surface
- 303. Boiler rating
- 304. Registration fee
- 305. Inspection fee for renewal of certificate
- 306. Memorandum of Inspection Book
- 307. Registration book
- 308. Maintenance of records
- 309. Transfer of memorandum of inspection book and registration book
- 310. Grant of Certificate
- 311. Procedure for inspection of installed boilers
- 312. Calculation of wasted shell
- 313. Ageing of shell type boilers
- 314. Ageing of Water Tube Boilers
- 315. Ageing of heat recovery steam generators (HRSGs)
- 316. Repairs to boiler and steam pipes
- 317. Procedure for repairs
- 318. Procedure for welding during repairs
- 319. Riveting and other repairs
- 320. Miscellaneous provisions for repairs
- 321. Submission of manufacturing drawings and the particulars of boilers in advance
- 322. Inspection of pipes
- 323. Submission of plans of steam-pipes
- 324. Inspection fee for boilers and parts thereof constructed in India
- 325. Inspection fee for pipes
- 326. Inspection fee for valves and flanges
- 327. Fees for inspection of components of valves
- 328. Inspection fee for feed water heaters and other fittings
- 329. Markings
- 330. Inspection fee for spares and boiler components
- 331. Fees for examination of welders or welding operators
- 332. Penalty