Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 319. Riveting and other repairs
Not yet checked against the official Gazette; verify before relying on it.
319. Riveting and other repairs.─ The repairer shall satisfy the Chief Inspector:-
(1)That he possesses the necessary equipment and tools and engages trained and experienced workmen and staff for the work underwork taken.
(2)Standard of work shall be of a high order and comply with all the requirements and test that may be prescribed by the Chief Inspector, and all material used shall be boiler quality.
In short
For riveting and other repairs, the repairer must satisfy the Chief Inspector that he has the necessary equipment and tools and employs trained and experienced workmen and staff. The work must be of a high standard and meet the requirements and tests the Chief Inspector prescribes, and all material used must be boiler quality.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 173 | Riveting | 100% | Chapter III (DPIIT scan), image 14 |
IBR 1950 regulation 173 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 173 page for its amendments.
| Reg. 173, Reg. 174 RIVETING Riveting
Reg. 174 RIVETING Fullering and Caulking All seams shall be fullered or caulked inside and outside and this shall be done in such a manner that the plates are not sprung or damaged. |
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 319, Regulation 319, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.720. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.