Regulation 294. Boiler component’s identification marking

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 696–697Table

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

294. Boiler component’s identification marking.─ (1) Convection bank tubes, loose tubes, coils - evaporator super heater and economiser, riser downcomer and saturated supply pipes, attemperator link piping, boiler integral and non integral piping, water wall panel without header shall be stencilled as per the table given below irrespective of material grade, outside diameter and thickness.

(2)There shall be no hard stamping of competent person on these component.

Table 8/1

IDENTIFICATION ON BOILER PRESSURE PART COMPONENTS
Serial
No.
ComponentPunching with Location /
Stencilling
Competent
Person
Stamp
Identification
(1)(2)(3)(4)(5)
1Boiler Block AssemblyHard Punching on D/EYesAs per Form-I(Part-C)
2Fire tube Boiler AssemblyHard Punching on shellYesAs per Form-I(Part-C)
3Steam DrumHard Punching on D/EYesAs per Form-I(Part-C)
4Water DrumHard Punching on D/EYesAs per Form-I(Part-C)
5Panel with HeaderHard Punching on HeaderYesAs per Form-I(Part-C)
6Convection Bank AssemblyHard Punching on HeaderYesAs per Form-I(Part-C)
7In bed Super Heater AssemblyHard Punching on HeaderYesAs per Form-I(Part-C)
8Super Heater AssemblyHard Punching on HeaderYesAs per Form-I(Part-C)
9Bi Drum Evaporator AssemblyHard Punching on D/EYesAs per Form-I(Part-C)
10In bed Evaporator AssemblyHard Punching on HeaderYesAs per Form-I(Part-C)
11HRSG HarpHard Punching on HeaderYesAs per Form-I(Part-C)
12HRSG Modular AssemblyHard Punching on HeaderYesAs per Form-I(Part-C)
13Economiser Modular AssemblyHard Punching on HeaderYesAs per Form-I(Part-C)
14HeadersHard Punching on HeaderYesAs per Form-I(Part-C)
15TanksHard Punching on shellYesAs per Form-I(Part-C)
16Water Collecting tankHard Punching on PipeYesAs per Form-I(Part-C)
17Vertical Steam separatorHard Punching on PipeYesAs per Form-I(Part-C)
18Panel without HeaderStencilling on tubeNoBoiler No, Drawing No,
Part no
19Riser, Down comer Saturated
Supply Pipe
Stencilling on PipeNoBoiler No Drawing No,
Part no
20Attemperator LinkStencilling on PipeNoBoiler No, Drawing No,
Part no
21Boiler Integral PipingStencilling on PipeNoBoiler No, Drawing No,
Part no
22Boiler Non Integral PipingStencilling on PipeNoBoiler No, Drawing No,
Part no
23Convection Bank TubeStencilling on tubeNoBoiler No, Tube no /
Part no
24Loose TubesStencilling on tubeNoBoiler No, Tube no /
Part no
25Coils - Evaporator, Superheater&
Economiser, Re-heater coils ,
Platen super heater coils
Stencilling on tubeNoBoiler No, Item
Description, Part No

Table structure read from the Gazette PDF, pages 696, 697. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
                   IDENTIFICATION ON BOILER PRESSURE PART COMPONENTS

Serial  Component                     Punching with Location /  Competent  Identification
 No.                       (2)        Stencilling               Person                  (5)
 (1)                                                            Stamp
  1                                                    (3)
  2                                                                  (4)
  3
  4     Boiler Block Assembly         Hard Punching on D/E      Yes        As per Form-I(Part-C)
  5     Fire tube Boiler Assembly
  6                                   Hard Punching on shell    Yes        As per Form-I(Part-C)
  7
  8     Steam Drum                    Hard Punching on D/E      Yes        As per Form-I(Part-C)
  9
  10    Water Drum                    Hard Punching on D/E      Yes        As per Form-I(Part-C)
  11
  12    Panel with Header             Hard Punching on Header   Yes        As per Form-I(Part-C)
  13
  14    Convection Bank Assembly      Hard Punching on Header   Yes        As per Form-I(Part-C)

        In bed Super Heater Assembly  Hard Punching on Header   Yes        As per Form-I(Part-C)

        Super Heater Assembly         Hard Punching on Header   Yes        As per Form-I(Part-C)

        Bi Drum Evaporator Assembly   Hard Punching on D/E      Yes        As per Form-I(Part-C)

        In bed Evaporator Assembly    Hard Punching on Header   Yes        As per Form-I(Part-C)

        HRSG Harp                     Hard Punching on Header   Yes        As per Form-I(Part-C)

        HRSG Modular Assembly         Hard Punching on Header   Yes        As per Form-I(Part-C)

        Economiser Modular Assembly   Hard Punching on Header   Yes        As per Form-I(Part-C)

        Headers                       Hard Punching on Header   Yes        As per Form-I(Part-C)


15 Tanks                        Hard Punching on shell     Yes  As per Form-I(Part-C)

16 Water Collecting tank        Hard Punching on Pipe      Yes  As per Form-I(Part-C)

17 Vertical Steam separator     Hard Punching on Pipe      Yes  As per Form-I(Part-C)
18 Panel without Header
                                Stencilling on tube        No   Boiler No, Drawing No,
                                                                Part no
19 Riser, Down comer Saturated  Stencilling on Pipe        No   Boiler No Drawing No,
                                                                Part no
Supply Pipe
                                                                Boiler No, Drawing No,
20 Attemperator Link            Stencilling on Pipe        No   Part no
                                                                Boiler No, Drawing No,
21 Boiler Integral Piping       Stencilling on Pipe        No   Part no
                                                                Boiler No, Drawing No,
22 Boiler Non Integral Piping   Stencilling on Pipe        No   Part no
                                                                Boiler No, Tube no /
23 Convection Bank Tube         Stencilling on tube        No   Part no
                                                                Boiler No, Tube no /
24 Loose Tubes                  Stencilling on tube        No   Part no
                                                                Boiler No, Item
25 Coils - Evaporator, Superheater& Stencilling on tube    No   Description, Part No

Economiser, Re-heater coils ,

Platen super heater coils

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Referenced provisions

Form-I (Part C)

Independent explanation — not the law · draft · engineer review in progress

In short

This regulation sets how boiler pressure part components are identified: hard punching with the Competent Person's stamp, or stencilling without it.

Key points

  • Table 8/1, hard punching with Competent Person stamp: boiler block and fire tube boiler assemblies, steam and water drums, panels with header, convection bank, superheater and evaporator assemblies, HRSG harps and modules, economiser modules, headers, tanks, water collecting tanks and vertical steam separators. Identification is as per Form-I (Part-C).
  • (1) Stencilling, no Competent Person stamp: convection bank tubes, loose tubes, evaporator, superheater and economiser coils, risers, downcomers and saturated supply pipes, attemperator link piping, boiler integral and non-integral piping, and water wall panels without header. This applies whatever the material grade, outside diameter or thickness. Stencils carry the Boiler No with Drawing No, Tube no or Item description, and Part no, as the table shows.

Watch out

  • (2) There must be no hard stamping by the Competent Person on the stencilled components.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
696–697
PDF page index
696–697 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 173c7dcd480ea7cc
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 294, Regulation 294, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.696–697. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.