Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 294. Boiler component’s identification marking
Not yet checked against the official Gazette; verify before relying on it.
294. Boiler component’s identification marking.─ (1) Convection bank tubes, loose tubes, coils - evaporator super heater and economiser, riser downcomer and saturated supply pipes, attemperator link piping, boiler integral and non integral piping, water wall panel without header shall be stencilled as per the table given below irrespective of material grade, outside diameter and thickness.
(2)There shall be no hard stamping of competent person on these component.
Table 8/1
| IDENTIFICATION ON BOILER PRESSURE PART COMPONENTS | ||||
| Serial No. | Component | Punching with Location / Stencilling | Competent Person Stamp | Identification |
| (1) | (2) | (3) | (4) | (5) |
| 1 | Boiler Block Assembly | Hard Punching on D/E | Yes | As per Form-I(Part-C) |
| 2 | Fire tube Boiler Assembly | Hard Punching on shell | Yes | As per Form-I(Part-C) |
| 3 | Steam Drum | Hard Punching on D/E | Yes | As per Form-I(Part-C) |
| 4 | Water Drum | Hard Punching on D/E | Yes | As per Form-I(Part-C) |
| 5 | Panel with Header | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 6 | Convection Bank Assembly | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 7 | In bed Super Heater Assembly | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 8 | Super Heater Assembly | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 9 | Bi Drum Evaporator Assembly | Hard Punching on D/E | Yes | As per Form-I(Part-C) |
| 10 | In bed Evaporator Assembly | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 11 | HRSG Harp | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 12 | HRSG Modular Assembly | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 13 | Economiser Modular Assembly | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 14 | Headers | Hard Punching on Header | Yes | As per Form-I(Part-C) |
| 15 | Tanks | Hard Punching on shell | Yes | As per Form-I(Part-C) |
| 16 | Water Collecting tank | Hard Punching on Pipe | Yes | As per Form-I(Part-C) |
| 17 | Vertical Steam separator | Hard Punching on Pipe | Yes | As per Form-I(Part-C) |
| 18 | Panel without Header | Stencilling on tube | No | Boiler No, Drawing No, Part no |
| 19 | Riser, Down comer Saturated Supply Pipe | Stencilling on Pipe | No | Boiler No Drawing No, Part no |
| 20 | Attemperator Link | Stencilling on Pipe | No | Boiler No, Drawing No, Part no |
| 21 | Boiler Integral Piping | Stencilling on Pipe | No | Boiler No, Drawing No, Part no |
| 22 | Boiler Non Integral Piping | Stencilling on Pipe | No | Boiler No, Drawing No, Part no |
| 23 | Convection Bank Tube | Stencilling on tube | No | Boiler No, Tube no / Part no |
| 24 | Loose Tubes | Stencilling on tube | No | Boiler No, Tube no / Part no |
| 25 | Coils - Evaporator, Superheater& Economiser, Re-heater coils , Platen super heater coils | Stencilling on tube | No | Boiler No, Item Description, Part No |
Table structure read from the Gazette PDF, pages 696, 697. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
IDENTIFICATION ON BOILER PRESSURE PART COMPONENTS Serial Component Punching with Location / Competent Identification No. (2) Stencilling Person (5) (1) Stamp 1 (3) 2 (4) 3 4 Boiler Block Assembly Hard Punching on D/E Yes As per Form-I(Part-C) 5 Fire tube Boiler Assembly 6 Hard Punching on shell Yes As per Form-I(Part-C) 7 8 Steam Drum Hard Punching on D/E Yes As per Form-I(Part-C) 9 10 Water Drum Hard Punching on D/E Yes As per Form-I(Part-C) 11 12 Panel with Header Hard Punching on Header Yes As per Form-I(Part-C) 13 14 Convection Bank Assembly Hard Punching on Header Yes As per Form-I(Part-C) In bed Super Heater Assembly Hard Punching on Header Yes As per Form-I(Part-C) Super Heater Assembly Hard Punching on Header Yes As per Form-I(Part-C) Bi Drum Evaporator Assembly Hard Punching on D/E Yes As per Form-I(Part-C) In bed Evaporator Assembly Hard Punching on Header Yes As per Form-I(Part-C) HRSG Harp Hard Punching on Header Yes As per Form-I(Part-C) HRSG Modular Assembly Hard Punching on Header Yes As per Form-I(Part-C) Economiser Modular Assembly Hard Punching on Header Yes As per Form-I(Part-C) Headers Hard Punching on Header Yes As per Form-I(Part-C) 15 Tanks Hard Punching on shell Yes As per Form-I(Part-C) 16 Water Collecting tank Hard Punching on Pipe Yes As per Form-I(Part-C) 17 Vertical Steam separator Hard Punching on Pipe Yes As per Form-I(Part-C) 18 Panel without Header Stencilling on tube No Boiler No, Drawing No, Part no 19 Riser, Down comer Saturated Stencilling on Pipe No Boiler No Drawing No, Part no Supply Pipe Boiler No, Drawing No, 20 Attemperator Link Stencilling on Pipe No Part no Boiler No, Drawing No, 21 Boiler Integral Piping Stencilling on Pipe No Part no Boiler No, Drawing No, 22 Boiler Non Integral Piping Stencilling on Pipe No Part no Boiler No, Tube no / 23 Convection Bank Tube Stencilling on tube No Part no Boiler No, Tube no / 24 Loose Tubes Stencilling on tube No Part no Boiler No, Item 25 Coils - Evaporator, Superheater& Stencilling on tube No Description, Part No Economiser, Re-heater coils , Platen super heater coils
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
This regulation sets how boiler pressure part components are identified: hard punching with the Competent Person's stamp, or stencilling without it.
Key points
- Table 8/1, hard punching with Competent Person stamp: boiler block and fire tube boiler assemblies, steam and water drums, panels with header, convection bank, superheater and evaporator assemblies, HRSG harps and modules, economiser modules, headers, tanks, water collecting tanks and vertical steam separators. Identification is as per Form-I (Part-C).
- (1) Stencilling, no Competent Person stamp: convection bank tubes, loose tubes, evaporator, superheater and economiser coils, risers, downcomers and saturated supply pipes, attemperator link piping, boiler integral and non-integral piping, and water wall panels without header. This applies whatever the material grade, outside diameter or thickness. Stencils carry the Boiler No with Drawing No, Tube no or Item description, and Part no, as the table shows.
Watch out
- (2) There must be no hard stamping by the Competent Person on the stencilled components.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 294, Regulation 294, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.696–697. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.