BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration

Regulation 324. Inspection fee for boilers and parts thereof constructed in India

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 724–726TableFormula / symbols

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

324. Inspection fee for boilers and parts thereof constructed in India.─ Inspection fee for boilers and parts thereof constructed in India shall be as specified in Table 8/12.

Table – 8/12
Inspection fee for Boilers and parts thereof constructed in India (regulation 324)

Category No.ProductCalculation CriteriaInspection Fee in Rs.InputRemarks
(1)(2)(3)(4)(5)(6)
1Boilers
(at
manufacturers
works)
Heating Surface Area
(HSA)
HSA *
Corresponding Fee
specified in Reg.
305 * 4
Pressure Part
Arrangement
(PPA)
drawing
4 times the
Inspection fee
for renewal of
certificate
(Reg. 305)
2Tubes and PipesPer metric tonne or part
thereof
360Weight in
metric tonne
3Boilers
(at site of
Construction)
Heating Surface AreaHSA *
Corresponding
Fee specified in
Reg. 305* 4
PPA drawing4 times the
Inspection fee
for renewal of
certificate
(Reg. 305)
4Forged Pipe
fittings
<= 25 mmfor a batch
of 50 or part
thereof
225Nominal Bore
and Batch
size
At the rate
specified for
<= 25 mmfor a batch
of 100 or
part thereof
390forged and cast
flanges
(Reg.326)
> 25 mm
<= 50 mm
for a batch
of 50 or part
thereof
435
> 50 mm
<=
100mm
for a batch
of 25 or part
thereof
435
> 100
mm
<= 250
mm
for a batch
of 10 or part
thereof
465
> 250 mmfor a batch
of 5 or part
thereof
540
5Pipe fittings
other than forged
pipe fittings
<= 25 mmfor a batch
of 50 or part
thereof
450Nominal Bore
and Batch
size
At the rate
specified for
forged and cast
flanges
(Reg. 326)* 2
<= 25 mmfor a batch
of 100 or
part thereof
780
> 25 mm
<= 50 mm
for a batch
of 50 or part
thereof
870
> 50 mm
<=
100mm
for a batch
of 25 or part
thereof
870
> 100
mm
<= 250
mm
for a batch
of 10 or part
thereof
930
> 250 mmfor a batch
of 5 or part
thereof
1080

Table structure read from the Gazette PDF, pages 724, 725. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Category Product          Calculation Criteria          Inspection Fee    Input         Remarks
   No.                                                       in Rs.

(1)                  (2)                (3)             (4)                     (5)            (6)

1          Boilers        Heating Surface Area          HSA *             Pressure Part 4 times the

                                        (HSA)           Corresponding Fee Arrangement   Inspection fee
                                                                                        for renewal of
           (at                                          specified in Reg. (PPA)         certificate
           manufacturers                                                                (Reg. 305)
           works)                                       305 * 4           drawing

2          Tubes and Pipes Per metric tonne or part     360               Weight in

                                        thereof                           metric tonne

3          Boilers        Heating Surface Area               HSA *        PPA drawing   4 times the
                                                        Corresponding                   Inspection fee
           (at site of                                  Fee specified in                for renewal of
           Construction)                                                                certificate
                                                          Reg. 305* 4                   (Reg. 305)

4          Forged Pipe    <= 25 mm for a batch          225               Nominal Bore At the rate

           fittings                     of 50 or part                     and Batch     specified for

                                        thereof                           size


                      <= 25 mm  for a batch    390                     forged and cast
                                of 100 or      435                     flanges
                                part thereof   435                     (Reg.326)
                                               465
                      > 25 mm   for a batch
                      <= 50 mm  of 50 or part  540
                                thereof        450
                                               780
                      > 50 mm   for a batch    870
                                of 25 or part  870
                      <=        thereof        930
                      100mm
                                               1080
                      > 100     for a batch
                      mm        of 10 or part
                                thereof
                      <= 250
                      mm

                      > 250 mm  for a batch
Original extracted text of the table above, continued (diagnostic)
                                of 5 or part
                                thereof

5  Pipe fittings      <= 25 mm for a batch               Nominal Bore  At the rate
                                                         and Batch     specified for
   other than forged            of 50 or part            size          forged and cast
                                                                       flanges
   pipe fittings                thereof

                      <= 25 mm  for a batch
                                of 100 or
                                part thereof                           (Reg. 326)* 2

                      > 25 mm   for a batch
                      <= 50 mm  of 50 or part
                                thereof

                      > 50 mm   for a batch
                                of 25 or part
                      <=        thereof
                      100mm

                      > 100     for a batch
                      mm        of 10 or part
                                thereof
                      <= 250
                      mm

                      > 250 mm  for a batch
                                of 5 or part
                                thereof

6

6Pipe bends andPer Meter10Length in
tube bends(Min 300)Meter

Table structure read from the Gazette PDF, page 726. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Pipe bends and           Per Meter               10          Length in
tube bends                                   (Min 300)       Meter

Parts of this extracted text look garbled; read the Gazette page before using any value.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 324 sets inspection fees for boilers and their parts constructed in India, as given in Table 8/12.

Key points

  • Boilers inspected at the manufacturer's works or at the site of construction: fee based on heating surface area, at 4 times the inspection fee for renewal of certificate in regulation 305. The input is the pressure part arrangement (PPA) drawing.
  • Tubes and pipes: charged per metric tonne or part thereof.
  • Forged pipe fittings: charged by nominal bore and batch size, at the rate for forged and cast flanges in regulation 326.
  • Pipe fittings other than forged: by nominal bore and batch size, at twice the rate for forged and cast flanges in regulation 326.
  • Pipe bends and tube bends: charged per meter, with a minimum.

Watch out

  • The extracted table is misaligned, so individual fee figures do not line up with their rows. Check the Gazette page for the exact values.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
524Preparation for inspection70%Chapter XI (DPIIT scan), image 7
IBR 1950 regulation 524 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 524 page for its amendments.

Reg. 524, Reg. 525
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Preparation for inspection

a)

At each inspection the economiser shall be emptied and thoroughly cleaned internally and externally and in the flues. All mountings shall be opened up and all caps, doors and blank flanges removed to permit adequate inspection.
b) The owner of an economiser to which this Regulation is applicable shall obtain the approval of the Chief Inspector in writing to the method of disconnection which he proposes to use and shall be responsible for ensuring that the method so approved is followed in practice.


Reg. 525

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure for Registration
a) On receipt of an application for registration the Inspector shall, after the economiser has been prepared for examination, take full particulars of the design and ascertain the working pressure allowed by the Regulations.
b)

The fitness of the economiser parts shall be determined as per the following formulae:-

(i)

Cast Iron Smooth Tube Economisers with Pressed Socket Joints.

WP = AZ + 225N Eqn.(124)
70a n

Where,

WP=Design pressure in pounds per square inch (gauge).
A= Area of contact surface of a single socket, square inches.
a= Cross sectional area measured on the mean diameter of a socket hole, in square inches.
Z=Breakdown load of an unreinforced socket joint in pounds.
N=Number of stays per header.
n=Number of sockets per header.

For existing standard designs the breakdown load of an unreinforced socket joint shall be taken as not greater than 13,500 lbs. For designs not already in use before the date of this standard the corresponding figure shall be taken as not greater than 75 per cent of the load as determined by experiment.
(ii) Headers of approximately rectangular cross section.

WP = C(t-2) Eqn.(125)
b²
Where,

t = Thickness in thirty-second of an inch.
b = Distance between the sides of header supporting the surface, in inches.
WP= Design pressure, in pounds per square inch (gauge)
C = 11 where the water side surface is flat

= 22 where the water side surface is curved, provided that the curvature is continued without interruption and the thickness at each end of the side is not less than that determined with C=11.

In no case, however, shall the thickness of the side of a header be less than 16 thirty-seconds of an inch at any part.
Next >>>

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
724–726
PDF page index
724–726 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 242213e621fd0072
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 324, Regulation 324, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.724–726. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page