Regulation 330. Inspection fee for spares and boiler components

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 729Table

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

330. Inspection fee for spares and boiler components.─ Inspection fee for spares and boiler components shall be as specified in Table 8/16 as given below,-

Table 8/16

Category No.ProductCalculation criteriaInspection fee in Rs.Input
(1)(2)(3)(4)(5)
1Spares and Boiler Components (All types of Coils namely Economiser Coils, Superheater Coils, Reheater Coils)Heating Surface AreaFee specified in regulation 305Heating surface area specified in drawing
2Tube and tube
Bends
Per Meter10
(Min Rs. 500)
Length in
Meter

Table structure read from the Gazette PDF, page 729. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
                   Inspection fee for spares and boiler components

Category           Product              Calculation    Inspection fee  Input
   No.                                     criteria         in Rs.
    (1)                     (2)               (3)             (4)            (5)
     1             Spares and Boiler                                   Heating
                   Components         Heating Surface  Fee specified   surface area
     2             (All types of            Area        in regulation  specified in
                   Coils namely                                        drawing
                   Economiser            Per Meter           305
                   Coils,
                   Superheater                         10              Length in
                   Coils, Reheater
                   Coils)                              (Min Rs. 500) Meter
                   Tube and tube
                   Bends

NOTE : Wherever boiler components are outsourced by the main boiler manufacturer for manufacturing in vendor works, Inspection fees need not be paid by the vendor if the inspection fees are paid by the main boiler manufacturer.

Parts of this extracted text look garbled; read the Gazette page before using any value.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Independent explanation — not the law · draft · engineer review in progress

In short

Inspection fees for spares and boiler components are set in Table 8/16. Spares and boiler components, including all types of coils (economiser, superheater and reheater coils), are charged on heating surface area at the fee in regulation 305. Tubes and tube bends are charged per meter, with a minimum of Rs. 500.

Watch out

  • Where the main boiler manufacturer outsources components to a vendor's works, the vendor need not pay inspection fees if the main manufacturer has paid them.
  • The extracted table is misaligned. Check the Gazette page for the exact row-by-row values.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
524Preparation for inspection70%Chapter XI (DPIIT scan), image 7
IBR 1950 regulation 524 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 524 page for its amendments.

Reg. 524, Reg. 525
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Preparation for inspection

a)

At each inspection the economiser shall be emptied and thoroughly cleaned internally and externally and in the flues. All mountings shall be opened up and all caps, doors and blank flanges removed to permit adequate inspection.
b) The owner of an economiser to which this Regulation is applicable shall obtain the approval of the Chief Inspector in writing to the method of disconnection which he proposes to use and shall be responsible for ensuring that the method so approved is followed in practice.


Reg. 525

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure for Registration
a) On receipt of an application for registration the Inspector shall, after the economiser has been prepared for examination, take full particulars of the design and ascertain the working pressure allowed by the Regulations.
b)

The fitness of the economiser parts shall be determined as per the following formulae:-

(i)

Cast Iron Smooth Tube Economisers with Pressed Socket Joints.

WP = AZ + 225N Eqn.(124)
70a n

Where,

WP=Design pressure in pounds per square inch (gauge).
A= Area of contact surface of a single socket, square inches.
a= Cross sectional area measured on the mean diameter of a socket hole, in square inches.
Z=Breakdown load of an unreinforced socket joint in pounds.
N=Number of stays per header.
n=Number of sockets per header.

For existing standard designs the breakdown load of an unreinforced socket joint shall be taken as not greater than 13,500 lbs. For designs not already in use before the date of this standard the corresponding figure shall be taken as not greater than 75 per cent of the load as determined by experiment.
(ii) Headers of approximately rectangular cross section.

WP = C(t-2) Eqn.(125)
b²
Where,

t = Thickness in thirty-second of an inch.
b = Distance between the sides of header supporting the surface, in inches.
WP= Design pressure, in pounds per square inch (gauge)
C = 11 where the water side surface is flat

= 22 where the water side surface is curved, provided that the curvature is continued without interruption and the thickness at each end of the side is not less than that determined with C=11.

In no case, however, shall the thickness of the side of a header be less than 16 thirty-seconds of an inch at any part.
Next >>>

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
729
PDF page index
729 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 6c9603369e1f8b6d
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 330, Regulation 330, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.729. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.