Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration

Regulation 322. Inspection of pipes

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 722–723

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

322. Inspection of pipes.─ (1) Pipes shall be inspected and hydraulically tested before use in place, in test pressure to be that prescribed in the standard conditions for steam pipes. A certificate from the Inspecting Authority in Form-IV(Part-B), stating that this has been done by him may be accepted. If the Competent Person is satisfied with the test, the pipes may be erected in position. The Chief Inspector shall intimate his approval to the owner regarding the suitability of the pipe line for use at the pressure and temperature to be specified.

(2)At subsequent inspection of the boiler or at any other time, the Competent Person may make an external inspection of the steam-pipes and for this purpose may require a part of the lagging at the flanges to be removed, and the pipe made bare. If as a result of this inspection the Competent Person is of opinion that the pipes or any positions of then are in an unsatisfactory condition he shall report the matter to the Chief Inspector, who may require the whole of the lagging to be removed and may require any pipe or pipes to be hydraulically tested. The test pressure at such hydraulic test shall be not less than one and half times, the design pressure of the boiler or the maximum allowable working pressure of pipe as the case may be.

(3)(a) A memorandum of Inspection Book shall be prepared in respect of steam pipe and fittings in Form-XIV. In this book, the Inspector shall enter in ink, all particulars and dimensions of the steam pipe and fitting with calculations for the various parts in detail, particulars of hydraulic test and his inspection notes.

(b)At subsequent inspection, the Competent Person shall enter the date of the inspection and hydraulic test together with notes thereon.

(c)The Competent Person shall also enter in the Memorandum of Inspection Book remarks regarding the general condition of the steam pipes and fittings, and repairs, replacements of alterations, if any, and the extent to which the steam pipes have been cleaned of lagging and covering so that the book provides a useful record of the steam-pipes and fittings for the information and guidance of Competent Person at subsequent inspection.

(d)In the event of an accident to a pipe line or its fittings, necessary remarks shall also be entered in the book.

(e)The Memorandum Book shall be submitted to the Chief Inspector, who will check all particulars and calculations and approve the maximum allowable working pressure and temperature that are to be permitted for the various parts of the pipe line and fittings. The pressure and temperature once approved for the particular steam pipe line shall not be altered except on a written authority from the Chief Inspector.

Referenced provisions

Form-IV (Part B) · Form-XIV

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 322 covers inspection and hydraulic testing of steam pipes before use and at later inspections, and the steam pipe Memorandum of Inspection Book.

Key points

  • (1) Pipes are inspected and hydraulically tested before use at the test pressure in the standard conditions for steam pipes. An Inspecting Authority certificate in Form-IV (Part-B) may be accepted. If the Competent Person is satisfied, the pipes may be erected. The Chief Inspector then tells the owner the approved pressure and temperature for the pipe line.
  • (2) At later inspections the Competent Person may inspect the pipes externally and have lagging at the flanges removed. If he finds them unsatisfactory, he reports to the Chief Inspector, who may require all lagging removed and a hydraulic test at not less than one and half times the design pressure of the boiler or the maximum allowable working pressure of the pipe, as the case may be.
  • (3)(a)–(d) A Memorandum of Inspection Book in Form-XIV is kept for steam pipes and fittings. The Inspector enters particulars, dimensions, calculations, hydraulic test details and notes. The Competent Person later enters inspection and test dates, general condition, repairs, replacements, alterations, lagging removed, and any accidents.
  • (3)(e) The Chief Inspector checks the book and approves the maximum allowable working pressure and temperature for the various parts.

Watch out

  • Once approved, the pressure and temperature for a steam pipe line cannot be altered without the Chief Inspector's written authority.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
528Memorandum of Inspection Book81%Chapter XI (DPIIT scan), image 8

Amendment history of the candidate IBR 1950 regulation: Reg. 528 (1 amendment)

IBR 1950 regulation 528 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 528 page for its amendments.


Reg. 526
, Reg. 527, Reg. 528
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure at subsequent inspection
a)

After the economiser has been cleaned the Inspector shall make a thorough examination so far as its construction permits. The external condition of the tubes should be carefully noted for wasting especially at the feed inlet end and all accessible tubes should be calibered. The internal surfaces of cast iron tubes should be closely observed for graphitic wasting as far as it is possible and in the event of any tube failure these should be broken up for scrutiny so that the general internal condition of the other tubes may be estimated.

b) Where tubes or other parts are wasted, the strength should be recalculated.
c) The scraper gear should be examined to note if any parts are missing if the length of travel is adequate and if the scrapers are correctly adjusted.
d) All cap bolts are to be inspected, also the condition and position of the dampers and baffles.
e) The record of each inspection and calculations will be entered in the Memorandum of Inspection Book.


Reg. 527

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure for Hydraulic test

Every economiser for registration shall be hydraulically tested in the presence of an Inspector to 1 ½ times the working pressure. Hydraulic tests of economisers at subsequent examinations shall when required by the Inspector, be made after the inspection. The test pressure to be applied to economisers at subsequent examinations shall be from 1-1/4  to 1-1/2 times the working pressure of the economisers. During the test, all parts externally and in the flues shall be noted for leakage.


Reg. 528

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Memorandum of Inspection Book

In this book the Inspector shall enter all particulars and dimensions of the economiser with the required calculations for the various parts together with details of hydraulic test. At subsequent inspection the Inspector shall enter all notes pertaining to the condition of the various parts.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
722–723
PDF page index
722–723 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 8d42b352446393ab
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 322, Regulation 322, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.722–723. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.