Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration

Regulation 317. Procedure for repairs

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 718–720

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

317. Procedure for repairs.─(1)The repair work shall be carried out under the supervision of Inspector or Competent Person and when the fireboxes and smoke tubes of locomotive tube boilers are withdrawn, the internal parts, which are otherwise inaccessible to close inspection, shall be inspected by the Inspector or Competent Person, as the case may be.

(2)Repair to boilers shells shall be carried out by patching or by removing a strip of worn or damaged plate and inserting the new strip with covering straps over the longitudinal butt ends, the strength of the riveted joints shall be not less than that of the longitudinal joints of the shell.

(3)(a) Patches for fire exposed plates shall be fitted metal to metal without joint of any description;

(b)The affected part shall be cut out, leaving the corners of the hole well-rounded.

(c)Patches shall be secured, wherever possible, properly spaced rivets with a width of plate at least equal to the diameter of rivet between the edge of the rivet hole and the edge of the plate.

(d)Where riveting is impracticable, the plate shall be secured by welt fitting countersunk headed screw pins.

(4)The thickness of a patch plate shall not be less than the original thickness of the plate which it is used to patch.

(5)Bulged or distorted furnaces or circular section may, if the bulge or distortion is not too great, be pressed back to shape.

(6)Circular furnaces of horizontal boilers that have become distorted may be suitably reinforced.

(7)(a) Anti-collapse rings shall be substantial section either of single or double angles bolted back to back with screw stays not less than 22 mm in diameter and about 178 mm in pitch passed though flat of angle and screwed into the furnace, the ends being rounded over on the fire side and fitted with nuts at the other.

(b)The stay bolts shall be fitted with ferrules not less than 25 mm in depth between furnace and angle ring.

(8)Welding shall not be accepted for the repair of any part of a boiler for which welding is forbidden for a new boiler under these regulations and boiler shells shall not be repaired by welding beyond the filling up of a small isolated corroded or pitted part or the making up of wasted edges of openings.

(9)Cracks or grooving in dished or flat end plates of cylindrical shells or in the bends of furnace flanges in a circumferential direction may be weed out and welded.

(10)Wasted parts of circular furnaces and fireboxes and fire exposed flat plates as in rectangular fireboxes and combustion chambers may be cut out and be replaced by new pieces welded in or they may be built-up by welding.

(11)Longitudinal cracks in circular furnaces and fireboxes and cracks in rectangular fireboxes and combustion chambers may be welded.

(12)No stay bar shall be welded.

(13)Smoke tubes may be butt-welded either by fusion welding, flush welding or oxy-acetylene welding, and these may be tested hydraulically at the discretion of the Inspecting Authority.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 317 sets the technical rules for repairing boilers: supervision, patching, furnace reinforcement and where welding is and is not allowed.

Key points

  • (1) Repairs are supervised by the Inspector or Competent Person. When fireboxes and smoke tubes of locomotive boilers are withdrawn, the otherwise inaccessible internal parts must be inspected.
  • (2) Shells are repaired by patching, or by inserting a new strip with covering straps over the longitudinal butt ends. The riveted joints must be at least as strong as the shell's longitudinal joints.
  • (3) Patches on fire-exposed plates are fitted metal to metal with no joint, with the hole corners well rounded, and secured by properly spaced rivets. Where riveting is impracticable, welt-fitted countersunk headed screw pins are used.
  • (4) A patch plate must be at least as thick as the original plate.
  • (5)–(6) Bulged or distorted circular furnaces may be pressed back if the distortion is not too great, or suitably reinforced.
  • (7) Anti-collapse rings use screw stays not less than 22 mm in diameter at about 178 mm pitch, with ferrules not less than 25 mm deep.
  • (9)–(11) Cracks or grooving in end plates and furnace flange bends, wasted parts of furnaces and fireboxes, and certain cracks in furnaces, fireboxes and combustion chambers may be welded.
  • (13) Smoke tubes may be butt-welded, and hydraulic testing is at the Inspecting Authority's discretion.

Watch out

  • (8) Welding is not accepted for any part where welding is forbidden on a new boiler. Shells may be welded only to fill small isolated corroded or pitted areas or to make up wasted edges of openings.
  • (12) No stay bar may be welded.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
381Procedure for registration77%Chapter IX (DPIIT scan), image 2
525Procedure for Registration77%Chapter XI (DPIIT scan), image 7
527Procedure for Hydraulic test76%Chapter XI (DPIIT scan), image 8

Amendment history of the candidate IBR 1950 regulations: Reg. 381 (2 amendments) · Reg. 525 (1 amendment) · Reg. 527 (1 amendment)

IBR 1950 regulation 381 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 381 page for its amendments.

Reg. 381

Procedure for registration

a) On receipt of an application for registration under Section 7(1) of the Act, the Inspector shall, when the boiler has been properly prepared for examination proceed to measure in complete detail all its parts, ascertain the working pressure allowed by the Regulations by making a series of calculations of the strength of the various parts, such calculations being based on his measurement and if he is satisfied with the correctness of the maker’s certificate, on the dimensions and other particulars relating to the material and construction as stated therein [vide Section 14(1)(c) of the Act and Regulation]. In making his calculations he shall after examination of the material, take due account of the workmanship and details of the construction of each part. In his examination the Inspector may, if he deems necessary bore the plates or other parts to ascertain their thickness and in making his calculations he shall be guided by the requirements of the Regulations.
b) If no formulae or co-efficient applicable to any part is contained in the Regulations, the Chief Inspector shall in his discretion determine the fitness of such part.
c) The strength of the weakest part so calculated or determined, subject to any discretionary power exercised by the Chief Inspector, shall determine the permissible working pressure of the boiler. After inspecting the boiler and ascertaining by the prescribed calculations the maximum pressure at which the boiler may be worked, the Inspector shall hydraulically test and steam-test it in accordance with requirements of Regulations 379 and 380 and a provisional order under Section 9 of the Act in Form V may be issued after the hydraulic test.
d) The Inspector shall enter the above particulars and dimensions of the boiler and calculations of strength of the various parts, together with details of the hydraulic and of the steam tests, in a “Memorandum of Inspection” Book (vide Regulation 386) which, together with all the maker’s papers for the boiler, shall be submitted to the Chief Inspector with the Inspector’s report under sub-section (3) of Section 7 of the Act in Form I.
e) Where a certificate in Form II and a Memorandum of Inspection Book in Form I are furnished by an Inspecting Authority in accordance with sub-regulation (c) of Regulation 4, the Inspector shall, on receipt of an application for registration under sub-section (1) of Section 7 of the Act, proceed to make such examination and measurement of boiler as will satisfy him that the boiler is the one certified by the Inspecting Authority and carry out a thorough examination and check the measurements to ensure the correctness of the Inspecting Authority’s certificate and that no damage has been caused in transit.

The Inspector shall, if he is satisfied with the condition of the boiler, the correctness of the particulars and approved working pressure entered in Form I by the Inspecting authority, subject the boiler to hydraulic test in accordance with Regulation 379.

When the Inspector is satisfied that the boiler has satisfactorily withstood the test, he shall issue a provisional order to enable the boilers to the worked.
IBR 1950 regulation 525 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 525 page for its amendments.

Reg. 524, Reg. 525
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Preparation for inspection

a)

At each inspection the economiser shall be emptied and thoroughly cleaned internally and externally and in the flues. All mountings shall be opened up and all caps, doors and blank flanges removed to permit adequate inspection.
b) The owner of an economiser to which this Regulation is applicable shall obtain the approval of the Chief Inspector in writing to the method of disconnection which he proposes to use and shall be responsible for ensuring that the method so approved is followed in practice.


Reg. 525

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure for Registration
a) On receipt of an application for registration the Inspector shall, after the economiser has been prepared for examination, take full particulars of the design and ascertain the working pressure allowed by the Regulations.
b)

The fitness of the economiser parts shall be determined as per the following formulae:-

(i)

Cast Iron Smooth Tube Economisers with Pressed Socket Joints.

WP = AZ + 225N Eqn.(124)
70a n

Where,

WP=Design pressure in pounds per square inch (gauge).
A= Area of contact surface of a single socket, square inches.
a= Cross sectional area measured on the mean diameter of a socket hole, in square inches.
Z=Breakdown load of an unreinforced socket joint in pounds.
N=Number of stays per header.
n=Number of sockets per header.

For existing standard designs the breakdown load of an unreinforced socket joint shall be taken as not greater than 13,500 lbs. For designs not already in use before the date of this standard the corresponding figure shall be taken as not greater than 75 per cent of the load as determined by experiment.
(ii) Headers of approximately rectangular cross section.

WP = C(t-2) Eqn.(125)
b²
Where,

t = Thickness in thirty-second of an inch.
b = Distance between the sides of header supporting the surface, in inches.
WP= Design pressure, in pounds per square inch (gauge)
C = 11 where the water side surface is flat

= 22 where the water side surface is curved, provided that the curvature is continued without interruption and the thickness at each end of the side is not less than that determined with C=11.

In no case, however, shall the thickness of the side of a header be less than 16 thirty-seconds of an inch at any part.
Next >>>
IBR 1950 regulation 527 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 527 page for its amendments.


Reg. 526
, Reg. 527, Reg. 528
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure at subsequent inspection
a)

After the economiser has been cleaned the Inspector shall make a thorough examination so far as its construction permits. The external condition of the tubes should be carefully noted for wasting especially at the feed inlet end and all accessible tubes should be calibered. The internal surfaces of cast iron tubes should be closely observed for graphitic wasting as far as it is possible and in the event of any tube failure these should be broken up for scrutiny so that the general internal condition of the other tubes may be estimated.

b) Where tubes or other parts are wasted, the strength should be recalculated.
c) The scraper gear should be examined to note if any parts are missing if the length of travel is adequate and if the scrapers are correctly adjusted.
d) All cap bolts are to be inspected, also the condition and position of the dampers and baffles.
e) The record of each inspection and calculations will be entered in the Memorandum of Inspection Book.


Reg. 527

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure for Hydraulic test

Every economiser for registration shall be hydraulically tested in the presence of an Inspector to 1 ½ times the working pressure. Hydraulic tests of economisers at subsequent examinations shall when required by the Inspector, be made after the inspection. The test pressure to be applied to economisers at subsequent examinations shall be from 1-1/4  to 1-1/2 times the working pressure of the economisers. During the test, all parts externally and in the flues shall be noted for leakage.


Reg. 528

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Memorandum of Inspection Book

In this book the Inspector shall enter all particulars and dimensions of the economiser with the required calculations for the various parts together with details of hydraulic test. At subsequent inspection the Inspector shall enter all notes pertaining to the condition of the various parts.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
718–720
PDF page index
718–720 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash f149d617f656455d
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 317, Regulation 317, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.718–720. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).