Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 301. Engraving of registry number
Not yet checked against the official Gazette; verify before relying on it.
301. Engraving of registry number.─ (1) (a) (i) The registry number of every boiler shall, within a period of one month from the date of receipt thereof, shall be cut in the front plate or any such position as shall be pointed out by the Inspector.
(ii)The device for each State or Union territory shall be distinguished by the following letters as mentioned in the
Table below, namely:-
Serial Table Letters
| Serial No. | Name of State/Union territory | Letters |
|---|---|---|
| (1) | (2) | (3) |
| 1. | Andaman and Nicobar Islands | A&N |
| 2. | Andhra Pradesh | AP |
| 3. | Arunachal Pradesh | ARP |
| 4. | Assam | A |
| 5. | Bihar | BR |
| 6. | Chhattisgarh | CG |
| 7. | Dadra and Nagar Haveli | DNH |
| 8. | Delhi | D |
| 9. | Goa | G |
| 10. | Gujarat | GT |
| 11. | Haryana | HA |
| 12. | Himachal Pradesh | HP |
| 13. | Jammu & Kashmir | JK |
| 14. | Jharkhand | JH |
| 15. | Karnataka | KTK |
| 16. | Kerala | K |
| 17. | Laccadive, Minicoy & Amindivi Islands | LI |
| 18. | Ladakh | LA |
| 19. | Madhya Pradesh | MP |
| 20. | Maharashtra | MR |
| 21. | Manipur | MA |
| 22. | Meghalaya | ML |
| 23. | Nagaland | NL |
| 24. | Orissa | OR |
| 25. | Pondicherry | PY |
| 26. | Punjab | PI |
| 27. | Rajasthan | RI |
| 28. | Tamil Nadu | T |
| 29. | Telangana | TG |
| 30. | Tripura | TR |
| 31. | Uttar Pradesh | UP |
| 32. | Uttrakhand | UR |
| 33. | West Bengal | WBL |
Table structure read from the Gazette PDF, pages 701, 702. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
No. Name of State/Union territory
(3)
(1) (2) A&N
1. Andaman and Nicobar Islands AP
2. Andhra Pradesh ARP
3. Arunachal Pradesh A
4. Assam BR
5. Bihar CG
6. Chhattisgarh DNH
7. Dadra and Nagar Haveli D
8. Delhi G
9. Goa GT
10. Gujarat HA
11. Haryana HP
12. Himachal Pradesh JK
13. Jammu & Kashmir
14. Jharkhand JH
15. Karnataka KTK
16. Kerala K
17. Laccadive, Minicoy & Amindivi Islands LI
18. Ladakh LA
19. Madhya Pradesh MP
20. Maharashtra MR
21. Manipur MA
22. Meghalaya ML
23. Nagaland NL
24. Orissa OR
25. Pondicherry PY
26. Punjab PI
27. Rajasthan RI
28. Tamil Nadu T
29. Telangana TG
30. Tripura TR
31. Uttar Pradesh UP
32. Uttrakhand UR
33. West Bengal WBL(b)(i) The distinguishing letters shall be engraved above a number and separated there from by a horizontal line 64 mm in length.
(ii)The letters and figures shall be 25 mm in height and of suitable breadth, provided that in the case of small boilers the letters and figures of the device may, in the discretion of the Chief Inspector, be reduced to 10 mm in height. The whole shall be enclosed in a rectangle, the upper and lower sides of which shall be 76 mm apart and 6 mm clear of the top of the letters and the bottom of the figures respectively as indicated below:
Example:-
MR
1234
(c)In the case of registration of small industrial boilers, the letter “S” shall be added as a prefixed to the registration number below the distinguishing letters for State or Union territories as indicated below: -
Example:-
UP
S- ----
(d)The side lines shall be at equal distance clear from the figures and the engraving shall not be less than
0.4 mm in depth.
(2)The engraving shall be complete and ready for verification within one month from the date of receipt of registry number, and the fact shall be reported to the Chief Inspector of Boiler within this period.
(3)(a) Boilers having registry devices differing from those prescribed herein shall have such devices altered or crossed out and engraved a new one in conformity with those prescribed above.
(b)The original numbers of such boilers shall be retained in the new device, provided that in the case of boilers which were registered in a State or Union territory which has since become extinct, a new number shall be given by the State or Union territory where the Boiler is operating and any number once allotted to a boiler shall not be used again for another boiler.
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Regulation 301 sets how the registry number allotted to a boiler must be engraved on it: where, how large, in what layout, and how quickly.
Key points
- (1)(a) The registry number must be cut in the front plate, or in another position pointed out by the Inspector, within one month from the date it is received. Each State or Union territory has its own distinguishing letters, listed in the table (for example "MR" for Maharashtra, "UP" for Uttar Pradesh). See the Official text tab for the full list.
- (1)(b) The letters go above the number, separated by a horizontal line 64 mm long. Letters and figures are 25 mm high. The whole device is enclosed in a rectangle whose upper and lower sides are 76 mm apart and 6 mm clear of the letters and figures.
- (1)(c) For small industrial boilers, the letter "S" is prefixed to the registration number, below the State or Union territory letters.
- (1)(d) The side lines must be equally clear of the figures, and the engraving must be at least 0.4 mm deep.
- (2) The engraving must be complete and ready for verification within one month of receiving the registry number, and this must be reported to the Chief Inspector within the same period.
- (3) Boilers carrying a registry device that differs from this pattern must have it altered or crossed out and a new one engraved. The original number is kept in the new device.
Watch out
- For small boilers, the Chief Inspector may allow the letters and figures to be reduced to 10 mm in height. This is at the Chief Inspector's discretion.
- If the boiler was registered in a State or Union territory that no longer exists, the State or Union territory where it now operates gives a new number. A number once allotted is never reused for another boiler.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 534 | Engraving of Registry number | 100% | Chapter XI (DPIIT scan), image 9 |
IBR 1950 regulation 534 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 534 page for its amendments.
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | ||||||||||
| ||||||||||
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | ||||||||||
| ||||||||||
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | ||||||||||
|
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 301, Regulation 301, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.701–702. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.