Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration

Regulation 293. General

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 696

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

293. General.─ (1)The Inspecting Authority shall follow the procedure provided under these regulations during construction of a boiler at shop, field-site, in dealing applications for the registration of a boiler and examinations of boilers.

(2)The boiler components shall be erected at site based on the final inspection report as per Form-VIII approved by Competent Person and there is no need for any ground inspection or submission of any other document like manufacturing drawings, design calculations.

Referenced provisions

Form-VIII

Independent explanation — not the law · draft · engineer review in progress

In short

The Inspecting Authority must follow the procedures in these regulations during shop and site construction, registration and examination of boilers.

Key points

  • (2) Boiler components are erected at site based on the final inspection report in Form-VIII approved by the Competent Person. No ground inspection or extra documents, such as manufacturing drawings or design calculations, are needed.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
52General100%Chapter II (DPIIT scan), image 9
94General requirements100%Chapter II (DPIIT scan), image 19
276General100%Chapter V (DPIIT scan), image 11

Amendment history of the candidate IBR 1950 regulations: Reg. 52 (2 amendments)

IBR 1950 regulation 52 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 52 page for its amendments.

Reg. 52
MATERIALS OF CONSTRUCTION

SEAMLESS FERRITIC PIPES FOR HIGH TEMPERATURE SERVICE

General

(i) These regulations cover both hot finished and cold drawn seamless pipes of ferritic alloy steel grades.  These shall conform in all respects with the requirements herein specified.

(ii)  The seamless pipes conforming to other national/international standards which are known to be commonly used as being suitable for high temperature service can also be used with the designations of the national/international standards, provided such materials are not specifically prohibited by the regulations.

(iii)  While making pipes to other national/international standards the allowable stresses of the respective standard shall be strictly followed while designing the tubes.

(iv)   The design metal temperatures shall not exceed the following limits

Grade                                                              Temp. Degree C (Degree F)

P1, P2                                                                          537 (1000)

P5, P9, P11, P12, P22, P91, X20CrMoV121                    648 (1200)

IBR 1950 regulation 94 as last published in the DPIIT web edition (archived 2019)

Unofficial archived copy, not verified; see the regulation 94 page for its amendments.

Reg. 94
MATERIALS OF CONSTRUCTION

COVERED ELECTRODES FOR METAL ARC WELDING OF MILD STEEL

General requirements

(1) Application.- The following Regulations apply to electrodes of sizes 3/32 inch (12 S.W.G.) and larger in diameter for metal arc welding of carbon steels having ultimate tensile strength not exceeding 33 tons per square inch and Sulphur and Phosphorus contents not greater than 0.06 per cent each. Electrodes less than 3/32 inch in diameter shall not be used in boilers.

The electrodes shall comply with the requirements of physical tests prescribed for each class.

Their characteristics and behaviour under ordinary working conditions shall be such that satisfactory weld deposits can be made by a welder of average skill and experience and that the following characteristics are also obtained:-

(a)

a relative ease in the control of the slag and weld metal during welding;

(b)

a good degree of stability of the arc and of the fusing of the covering;

(c)

no undue degree of spatter;

(d)

a fair rate of deposition and depth of penetration;

(e)

easy removability of the slag;

(f)

no undue tendency to under-cut;

(g)

a fair contour of the weld deposits; and

(h)

a low internal porosity of the weld metal.

(2) Classification.- The electrodes shall be classified into:

(a)

normal penetration electrodes for use in one or more welding positions; and

(b)

 

deep penetration electrodes for close unprepared butt-welding in the flat position and/or fillet welding, in the flat and horizontal – vertical positions.

(3) Manufacture.- Electrodes may be made by any method that shall yield a product conforming to the requirements of these Regulations.

(4) Size of Electrodes.- The nominal size of the electrodes shall refer to the diameter of the core wire and the length shall not exceed 18 inches. Provision shall be made for end or centre gripping.

The tolerances on the specified diameter of the core wire of the electrodes shall be plus or minus 0.002 inch.

(5) Covering.- The flux covering shall be sufficiently robust to withstand the normal conditions of transport, storage, handling and use, without damage and shall be uniform in thickness all over so that it fuses evenly. The variation in the thickness shall not exceed 3 per cent.

(6) (a) Packing and storage.- Electrodes shall be suitably packed to guard against damage during transportation. When stored, the electrodes shall be kept in their original bundles or packings in a dry store room and under such conditions, the electrodes shall for a period of at least six months be capable of giving results similar to those which they would have given on the date of their despatch from the manufacturer.

(b) Marking.- Each package shall be marked with the following information:-

Name of the Manufacturer.
Trade name of the Electrodes.
Size and quantity of Electrodes.
Batch number.
Recommended current range.
Classification as per Indian Boiler Regulations.

(7) Tests.- The electrodes shall be subjected to Initial tests, Periodic check tests and Production control to ensure that the requirements of these Regulations are fulfilled.

Electrodes intended for use with more than one type of current or polarity shall be tested using each type of current and polarity.

Where any test specimen fails to satisfy the requirements of any particular test, two further test specimens shall be prepared using the electrodes from the same batch and submitted to the same test.

The batch of electrodes shall be accepted as having passed the test provided that the tests of both the additional specimens are satisfactory.

(8) Test Certificates.- The manufacturers shall, when called upon, produce the results of the most recent Periodic check tests carried out within the preceding 12 months, on electrodes representative of the electrodes supplied.

IBR 1950 regulation 276 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 276 page for its amendments.


Reg. 276, Reg. 277


General

The thickness T specified in equation 74 of Regulation 278 is the thickness of the end plate after manufacture and is applicable over the whole area of the end plate up to the point where, for ends of partially spherical shape, the dishing radius joins the corner radius; from this point a gradual thinning is permissible up to maximum of 10 per cent of the thickness T at the point where the corner radius joins the straight portion of flanged end plate. A similar gradual thinning is permissible for end plates of semi-ellipsoidal shape. This permissible reduction in thickness applies also to the flange for the manhole opening. In no case, however, when the end plate is but welded to the drum shell, shall the thickness of the edge of the flange for connection to the shell be less than the thickness of an unpierced seamless shell of the same diameter and material, determined by equation 72.


Reg. 277

Dished End with Opening

a) Heads with openings:-
i) Holes cut in the heads (manholes or tube holes) should be round or elliptical.
ii) Small size openings complying with conditions of sub-regulation (c) do not require any additional thickness of head or reinforcement of opening.
iii)

Large size openings require an increase in thickness of the head, according to sub-regulation (b) or a reinforcement of the opening according to sub-regulation (d).

b) Shape factor K for heads with large unreinforced openings:- The shape factor K to be used in calculating the thickness of heads varies depending on the height of the head H and on the dimensions of the largest opening. The value of K is indicated in Fig. 23D, by means of curves, each of which corresponds to a value of the ratio.-
   d  ---------
Ö D T

where,

d = diameter of the largest opening in the head (in the case of an elliptical opening, the larger diameter of the ellipse);
D = outside diameter of the head; and
T = minimum thickness after dishing.

In addition, the following conditions shall be satisfied:

T < 0.1
D

d < 0.5
D

The same condition and the same curves apply for openings simply cut in the plate of the head as well as to those which are flanged inwards. In the latter case, the radius r’ of the flanging (see Fig. 23C) should not be smaller than 25 mm (1 inch). The thickness of the flanged portion may be smaller than the calculated thickness T.

Unreinforced openings and flanged-in openings in dished heads shall be arranged so that the distance from the edge of the head is not less than as shown in Fig. 23E.

In all cases the width of the band separating two adjacent openings should, in projection, be at least equal to the diameter of the smallest opening as shown in Fig. 23E.
c) Small openings which do not require any reinforcement:-

Figure 23D indicates that for a given ratio of H/d, the shape factor K of a plain head corresponds to a certain values of the ratio,

d       
(DT)1/2

Piercing of holes with a diameter smaller than or equal to that which corresponds to this value can thus be made without any reinforcement in a head, the thickness of which is equal to the minimum required for a plain head.

The position of those openings shall however comply with the conditions stated in sub-regulation (b).

d) Reinforcement of large openings:-Large holes may be cut without increasing the thickness of the head, provided they are sufficiently reinforced.

The reinforcement may consist either of a welded nozzle or one or two reinforcing welded plates, or of a combination of these two procedures.

To determine the strength of the construction, one shall proceed as follows (see Fig. 23F). Let the imaginary diameter d’ of the opening be given by the formula

d' = d - A
T

where,

d = actual diameter of the opening in the head (outside diameter of the nozzle);
T = minimum thickness of the head; and
A = effective cross-section of reinforcement.

This effective area A corresponds, within the Limits given below, with the actual cross-section of the reinforcing plates and with the cross-section of the nozzle decreased by the cross-section necessary to support the pressure, for those parts of the nozzle situated outside the internal surface of the head.

The shape factor K can then be read corresponding to the ratio
     
d         
(DT)1/2

The maximum limits for the are of reinforcement that should be taken into account are

(a) L1 = (2 RT)1/2. for the width of a reinforcing plate;
(b) L2 = (d Tt)1/2 for the length of a nozzle.

where,

R = internal radius of the spherical part of the head (or for elliptical heads the internal radius of curvature of the meridian at the centre of the opening)
Tt = actual thickness of the nozzle,
L1 and L2 = dimensions given in Fig. 23F.

The position of the outer edges of the reinforcement shall comply with the provisions of sub-regulation (b) and Fig. 23E.

In cases where the allowable stress of a part of the reinforcement is lower than that of the head, the corresponding area A should be multiplied by the ratio:

allowable stress of the reinforcement material -------------------------------------------------------------------------------------- allowable stress of the head material

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
696
PDF page index
696 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash f8f4a8503d83142f
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 293, Regulation 293, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.696. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.