FORM-I
(PART-A)
[Regulation 4]

INSPECTING AUTHORITIES CERTIFICATE OF INSPECTION DURING CONSTRUCTION IN RESPECT

OF A BOILER MADE TO FOREIGN CODE FOR EXPORT

We hereby certify that the ……………………….. type boilers; length ……………… diameter ……………… Design pressure of boiler……………… built by Messrs ………………………………. under Shop No. ………………….. was constructed under our supervision and inspected at various stages at construction by the Competent Person and that the design, construction and workmanship were satisfactory and in every respect in accordance with ………………….. Code Specification. The boiler is stamped as under:

The boiler on completion was tested to ……………… in the presence of the Competent Person on ……………… and it satisfactorily withstood the test. Details of tests and inspections are furnished with this certificate.

We have satisfied ourselves that the design, construction and dimensions of the boiler are as shown in the Maker’s Drawing No. ………………… approved and signed by us, and that the particulars entered in the Maker’s Certificate of manufacture are correct to the best of our knowledge and belief.

Maker’s certificate, signed by them and countersigned by us, as required by the …………………… Code/Specification, is enclosed.

                                   Name and Signature of Inspecting Authority


Form I(B):R01                                     Dated: 07.08.2026

                                 FORM-I
                                (PART-B)
                           [See regulation 8(a)]

               CERTIFICATE OF INSPECTION FOR SHOP ASSEMBLED BOILERS

INSPECTING AUTHORITY: ____________________________________ Certificate No._____________

           We hereby certify that the ________Boiler, built by M/s________________________
_______________________________________________________________________ under Maker’s
number ____________ was constructed under our supervision and inspected at various stages of
construction by the Competent Person and that the construction and workmanship were satisfactory
and in accordance with the standard conditions for the design and construction of boilers as per
regulations framed under the Boilers Act, 2025.

The boiler is stamped on the ____________________________ Shell Plate with stamp as shown
hereunder: -

MAKER’S NAME               : _____________________________________
MAKER’S NO.                : __________ YEAR OF MAKE : _________
TESTED TO                  : _______ kg./cm² (g)ON : _______________
Design Pressure of boiler  : _______ kg./cm² (g)

               COMPETENT PERSON’S OR INSPECTING AUTHORITY’S OFFICIAL STAMP

           The boiler on completion was subjected to a Hydrostatic test pressure of _____ kg/cm² (g)
in the presence of the Competent Person on _____ day of ______________ and satisfactorily withstood the
test.

All welded seams were subjected to destructive and Non-Destructive examination wherever applicable and found satisfactory.

We have satisfied ourselves that the construction and dimensions of the boiler are as shown in the

Maker’s Drawing Number _____________________________________ signed by us and that the

particulars entered in Maker’s certificate of manufacture in Form-IV(Part-A) countersigned by us are correct to the best of our knowledge and belief.

Name and Signature of Competent Person Name and Signature of Inspecting Authority

                                                                           Date and Seal


Form I(C):R01                                                     Dated: 07.08.2026

                           FORM-I
                          (PART-C)
                     [See regulation 8(a)]

     CERTIFICATE OF INSPECTION FOR SITE ASSEMBLED BOILERS AT MAKER’S WORKS

INSPECTING AUTHORITY: ____________________  Certificate No. ____________

        We hereby certify that the__________ boiler; built by
M/s____________________________________

under Maker’s Number _____________________was constructed under our supervision and inspected

at various stages of construction by the Competent Person and that the construction and workmanship were satisfactory and in accordance with the Standard Conditions for the design and construction of boilers as per regulations framed under the Boilers Act,2025.

The Boiler components are stamped as per details below, wherever applicable.

Original extracted text of the table above, continued (diagnostic)
Component Name  Drawing No.                                  Stamping Details

Maker’s Name : ______________ Maker’s Number: _____________Year of make: ________

Tested to  : _______________ kg/cm² (g) on ___________

Design Pressure of boiler : _______________ kg/ cm² (g)

Competent Person’s or Inspecting Authority’s Official Stamp

Samples of materials used in the constructions of the boiler were tested in the presence of the Competent Person and found to comply with the regulations.

All welded seams were subjected to destructive and Non-Destructive examination wherever applicable and found satisfactory.

We have satisfied ourselves that the construction and dimensions of the boiler are as shown in

the Maker’s Drawing Number___________________ signed by us, and that the particulars entered in the

Maker’s certificate of manufacture in Form-IV(Part-A) countersigned by us are correct to the best of our knowledge and belief.

Name and Signature of Competent Person Name and Signature of Inspecting Authority Date and Seal

Form I(D):R01 Dated: 07.08.2026

FORM-I
(PART-D)
[See regulation 8(a)(iv)]

INSPECTING AUTHORITY CERTIFICATE OF INSPECTION DURING CONSTRUCTION OF BOILERS FOR WHICH VARIATIONS FROM STANDARD CONDITIONS HAVE BEEN PERMITTED

We hereby certify that the ……………… type boilers; length ……………… diameter ……………… Design pressure of boiler……………… built by Messrs ……………… at ……………… under Shop Number ……………… was constructed under our supervision and inspected at various stages of construction by the Competent Person, and that the design, construction and workmanship were satisfactory and in accordance with the variations from the standard conditions laid down in the Indian Boiler Regulations, 2026, for material design and construction features have been permitted by the Board of Inspecting Authority under the Boilers Act, 2025.

The Boiler is stamped on the front end plate with our stamp as shown hereunder:—

Maker’s Name …………… Year of Make …………… Works Number …………… Tested to …………… on ……………… Design pressure of boiler. Competent Person’s or Inspecting Authority’s official stamp.

The boiler on completion was

The drum and header were Subjected to a water pressure test of…………… in the presence of Competent Person on ……………… 20 ……………… and satisfactorily withstood the test.

*Samples of materials used in the construction of the boiler were tested in the presence of the Competent Person and found to comply with the requirements. All welded seams were subjected to physical tests and radiographic examination wherever applicable and found satisfactory.

Note: Strike off this paragraph where no such tests have been carried out and the certificate in Form-V(Part-A) by a Well-Known steel Maker is intended to be furnished.

* Strike out which is not applicable.

We have satisfied ourselves that the constructions and dimensions of the boiler are as shown in the Maker’s Drawing No. ……………… signed by us and that the particulars entered in the Maker’s certificate of manufacture in Form-IV(Part-A) countersigned by us, are correct to the best of our knowledge and belief. Particulars of variations from the standard conditions laid down in the said regulations as permitted by the Board or Inspecting Authority are enclosed.

Name and Signature of Inspecting Authority

Dated at ………… this ………… day of ………… 20………

Form I(E):R01 Dated: 07.08.2026

FORM-I
(PART-E)
[See regulation 8(a)(v)]

INSPECTING AUTHORITIES CERTIFICATE OF INSPECTION AFTER COMPLETION OF BOILER ERECTION AT ASSEMBLY SITE

We hereby certify that the...............type boilers Design pressure of boiler.............................kg/cm2(g) built by Messrs................................. at........................... under makers number .............................. was erected under our supervision and inspected at various stages of erection by the Competent Person and that the erection and workmanship were satisfactory and in accordance with the Standard Conditions for construction of land boilers under the Boilers Act, 2025.

All welded seams were subjected to post weld Heat treatment and Non-destructive examination wherever applicable and found satisfactory.

The boiler on completion of erection was subjected to a water pressure tests of ...........................kg /cm2(g) in the presence of the Competent Person on............................and satisfactorily withstood the test.

We have satisfied ourselves that the erection of the boiler are as shown in the Maker’s Drawing No...............................are correct to the best of our knowledge and belief.

Name & Signature of Competent Person Name and Signature of Inspecting authority

Dated at ............this............. Day of ..............20.........

Form II:R01 Dated: 07.08.2026

FORM-II
[See regulation 7(1)(b)(iii) and 541]

QUALIFIED BOILER WELDER’S CERTIFICATE NO:
ISSUED UNDER

THE INDIAN BOILER REGULATIONS, 2026

Name of Welder : Recent Passport Size Photo
Father’s Name :
(Hard / Soft Copy
Date of Birth :
To be attested by
Competent
Authority

Identification marks :

Signature of the Welder :

Address of Welder :

(Organisation Address)

                              EMPLOYMENT PARTICULARS

     From             To      Name of Employer                   Work on which engaged


This is to certify that Mr. / Ms. __________________________ (Welder Name) son/daughter of
Mr._________________________ has been examined and tested in the prescribed manner in the
presence of ___________________________________________ (Representative of Competent

Authority) and is deemed to have satisfactorily proved his ability to make sound welds as per particulars given in page number two and is hereby authorised to undertake such welds. He/She is authorised to undertake welding under these regulation.

The certificate validity is till the date of expiry indicated or the date of expiry of the revalidation whichever

Original extracted text of the table above, continued (diagnostic)
is later.

Granted this ____________ (date) under the seal and authority of the
_____________________________________ (name of the office of the competent authority).

Date Seal                                   (Name and Signature of Competent Authority)

                       QUALIFICATION DETAILS
ParticularsObservation
Date of Test
Type & Position of Test
Material TypeCarbon Steel / Alloy Steel / Nickel & Nickel Alloys
Material Grouping (M & Gr. Number)
Process of Welding
Weld with BackingYes / No
Electrode Grouping (U Number)/ Filler Wire
Name/Specification
Test Piece X-rayedYes / No

Table structure read from the Gazette PDF, page 875. Verification status as for the text above.

PERIOD OF VALIDITY

FromToBasis of RenewalCOMPETENT AUTHORITY
(Based on continuousSignature & Seal
engagement / fresh
tests)

Table structure read from the Gazette PDF, page 875. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
                         Particulars                                 Observation
Date of Test                                Carbon Steel / Alloy Steel / Nickel & Nickel Alloys
Type & Position of Test                     Yes / No
Material Type                               Yes / No
Material Grouping (M & Gr. Number)
Process of Welding
Weld with Backing
Electrode Grouping (U Number)/ Filler Wire
Name/Specification
Test Piece X-rayed

                                            PERIOD OF VALIDITY

From               To  Basis of Renewal                         COMPETENT AUTHORITY
                                                                     Signature & Seal
                       (Based on continuous

                       engagement / fresh

                       tests)
Form III:R00                                                        Dated: 07.08.2026

                                                        FORM-III
                                              [See Regulation7(1)(b)(v)]

QUESTIONNAIRE FORM FOR MANUFACTURER OF BOILERS/BOILER COMPONENTS UNDER THE INDIAN BOILER REGULATIONS, 2026

1. Registered name of the firm and its permanent address:

2. Year of establishment:

3. Works address(s):

4. Classification applied for— lower class

(a)Special Class

(b)Class I

(c)Class II

(d)Class III

(e)Class IV

(f)Components manufacturer

Notes: 1. A higher class boiler manufacturer shall be eligible to manufacture boilers.

2. A boiler manufacturer shall also be eligible to manufacture boiler components as boiler component manufacturer

5. Covered area available for manufacture:

6. Details of design facilities available and its location:

7. Details of manufacturing facilities available within the works:

8. Details of testing facilities available within the works:

9. Details of R & D facilities , if any:

10. Number of qualified NDT Personnel:

11. Number of qualified welders:

12. Details of Technical Manpower:

13. Details of internal quality control systems:

14. Any other relevant information:

Date ………………… Signature of the authorised signatory of the firm with stamp

Place ………………..

Note 1: The recognition of the firm as a manufacturer shall be for a period of three years, thereafter they shall apply for renewal of their recognition at least three months before the expiry of the said period.

Note 2: Information may be submitted on additional sheets, wherever required.

Form IV(A):R01 Dated: 07.08.2026

FORM-IV

1. DescriptionConstructor’s Name and address…………………………………………………
Manufactured for/Stock purposes ………………………………………………..
Contract No. ………………………………………………………………………..
Type of Boiler …………………………………………………….. Length overall
Diameter inside Largest belt ………………………………………………………
Design pressure of boiler ……………………………………………………….. Kg/cm²(g)
Reheater Pressure -------------------------------------- ---------------------Kg/ cm²(g)
Maker Number of boiler ………………………………………………….
Year of Make ……………………………………………………………….
Total heating surface ……………………………………………………… Sq. m
Evaporation capacity ……………………………………………………………… (for calculation of
relieving capacity of safety valves)
Final Temperature of steam (Design) superheater outlet…………°C
reheater Outlet ………… °C
Brief description of boiler ………………………………………………………….
2. Parts manufacturedName of component(s)……………………………………………….
at the constructor’sDrawing No.…………………………………………….
worksManufactured by ……………………………………………………………………
Identification marks ………………………………………………………………..
Part(s) manufactured, inspected at all stages of construction by ………………………...
(Inspecting Authority).
Part(s) hydraulically tested and inspected after test by …………….
3. Parts manufacturedName of component(s) ……………………………………………………….
outside theDrawing No.………………………….
constructor’s worksManufactured by ……………………………………………………………………
Identification marks ………………………………………………………………..
Part(s) manufactured, inspected at all stages of construction by ………………………..
(Inspecting Authority).
Part(s) hydraulically tested and inspected after test by …………….

Table structure read from the Gazette PDF, page 878. Verification status as for the text above.

[See regulation 8(b)]

Show original extracted text (diagnostic, not authoritative)
                            (PART-A)
                       [See regulation 8(b)]

                CONSTRUCTOR’S CERTIFICATE OF MANUFACTURE AND TEST

1. Description         Constructor’s Name and address…………………………………………………
                       Manufactured for/Stock purposes ………………………………………………..
2. Parts manufactured  Contract No. ………………………………………………………………………..
at the constructor’s   Type of Boiler …………………………………………………….. Length overall
works                  Diameter inside Largest belt ………………………………………………………
                       Design pressure of boiler ……………………………………………………….. Kg/cm²(g)
3. Parts manufactured  Reheater Pressure -------------------------------------- ---------------------Kg/ cm²(g)
outside the            Maker Number of boiler ………………………………………………….
constructor’s works    Year of Make ……………………………………………………………….
                       Total heating surface ……………………………………………………… Sq. m
                       Evaporation capacity ……………………………………………………………… (for calculation of
                       relieving capacity of safety valves)
                       Final Temperature of steam (Design) superheater outlet…………°C
                       reheater Outlet ………… °C
                       Brief description of boiler ………………………………………………………….
                       Name of component(s)……………………………………………….

                       Drawing No.…………………………………………….

                       Manufactured by ……………………………………………………………………
                       Identification marks ………………………………………………………………..
                       Part(s) manufactured, inspected at all stages of construction by ………………………...
                       (Inspecting Authority).
                       Part(s) hydraulically tested and inspected after test by …………….

                       Name of component(s) ……………………………………………………….

                       Drawing No.………………………….

                       Manufactured by ……………………………………………………………………
                       Identification marks ………………………………………………………………..
                       Part(s) manufactured, inspected at all stages of construction by ………………………..
                       (Inspecting Authority).
                       Part(s) hydraulically tested and inspected after test by …………….

Note: Similar information is to be furnished for each part manufactured outside the constructor’s Works.

4. Construction

The construction is in accordance with Chapter 3/ 4 / 10 / 12 / 14/16/17 of the Indian Boiler Regulations. Number of longitudinal seams in shell/drum in each belt ………………………………….. Number of longitudinal seams in furnace in each ring ……………………………………… Number of circumferential seams in shell/drum …………………………………………….. (including end seams) ………………………………………………………………………….
Number of circumferential seams in the furnace…………………………………………….. Details of repairs, if any carried out in welded seams during construction…………………….

Details of heat treatment ……………………………………………………………………….
All welded seams were subjected to Radiographic examination to the satisfaction of the Inspecting Authority, where required.

Note : Strike out whichever is not applicable

5. Details of Drums/Shells

No .                     Shell plate  Tube plate                            Head

Nomenclatur e

Original extracted text of the table above, continued (diagnostic)
                   Nominal dia.

                             Length
                                       Thickness in mm.

                                                  Inside radius
                                                       mm.

                                                            Thickness in mm
                                                                        Inside radius mm
                                                                                  Thickness in mm

                                                                                             Type*
                                                                                                       Radius of dish

                                                                                                           in. mm
                                                                                                                   Manholes No. & Size

                                                                                                                             Hydrostatic test
                                                                                                                                 kg/cm2(g)

1  2               3  4  5  6         7                           8  9      10       11       12       13

*Indicate (1) Flat (2) Dished (3) Ellipsoidal (4) Hemispherical.

6. Headers and Boxes

DescriptionSize and shapeThickness inHeador endHydrostatic
mmShapeThickness in
mm
test
kg/ cm²(g)

Table structure read from the Gazette PDF, page 879. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Description           Size and shape Thickness in                    Head or end           Hydrostatic
                                                mm                                             test
                                                                  Shape      Thickness in
                                                                                 mm        kg/ cm²(g)

7. Mountings

No.NomenclatureMaterialTypeNo.Size
1.Main stop valve
2.Auxiliary stop valves
3.Safety valves
(a)
(b)
(c)
4.Blow down valves
5.Feed Check valves

Table structure read from the Gazette PDF, page 880. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
No.                 Nomenclature       Material             Type         No.  Size

1. Main stop valve

2. Auxiliary stop valves

3. Safety valves (a)

(b)

(c)

4. Blow down valves

5. Feed Check valves

8. Details of the safety valves and test results {Regulation 8(d)(vii)}

Manufacturer ………………………………………………………………………………………………….
Identification marks of valves ………………………………………………………………………………. Maker’s No. …………………………………………………………………………………………………..
Type ……………………………………………………………………………………………………………
Life (mm) ………………………… Drawings Nos. ………………………………………………………..
Valves details:

Material …………………………………………………………………………………………………….
Valve Seat ………………………………………………………………………………………………….
Flat/Bevel …………………………………………………………………………………………………..
Diameter of valve seating ………………………………………………………………………………..
Valve Body:
Material …………………………………………………………………………………………………….

Opening at neck …………………………………………………………………………………………..

Opening at outlet ………………………………………………………………………………………….

Springs:

Material ……………………………………………………………………………………………………..

Process of manufacture …………………………………………………………………………………..

Chemical composition …………………………………………………………………………………….

Dimensions:

Outside diameter of coil …………………………………………………………………………………..

Section of wire …………………………………………………………………………………………….

Number of coils …………………………………………………………………………………………….
Free length of coils ………………………………………………………………………………………..
Test results:
Place of test ………………… Date ………………………………………………………………………
Closing down pressure ……………………………………………………………………………………
Remarks:
Does the valve chatter? …………………………………………………………………………………..
Does the valve seat leak? ………………………………………………………………………………..
Blow off pressure ……………………………………………………………………………………….…
Type of valve and extract of test results ……………………………………………………………….. Type of valve ……………………………………………………………………………………………….
Place of test …………………………………………………………… date ……………………………
Constant ‘C’ by test results ……………………………………………………………………………….
Capacity of the valve for the intended blow off pressure ……………………………………………..

Signature of Maker’s representative INSPECTING AUTHORITY witnessing tests

9. Certified that the particulars entered herein are correct and that parts in sections 2 to 8, against the names of which entries are made have been used in the construction of the boiler.

The particulars shown against the various parts used are in accordance with the enclosed certificates from the respective Makers.

The design of the boiler is that as shown in Drawing Nos. ………

The boiler has been designed and constructed to comply with the regulations under the Boilers Act, 2025, for a Design pressure of ……………… kg/ cm²(g) at our Works above-named and satisfactorily withstood a water test of ……………… kg/ cm²(g) on the …………… day of …………… 20 ……… in the presence of our responsible representative whose signature is appended hereunder.

Maker’s RepresentativeMaker
(Name and signature)(Name and Signature)
Name and signature ofName and signature of
Competent PersonInspecting Authority/Well Known Forge.

Table structure read from the Gazette PDF, page 893. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Maker’s Representative                                                    Maker

(Name, signature and stamp)                                        (Name, signature and stamp)

      Name, signature and stamp of                                 Name, signature and stamp of
           Competent Person                                              Inspecting Authority

Dated …………… the day of …………… 20………. Dated: 07.08.2026 Form IV(B):R01

Original extracted text of the table above, continued (diagnostic)
                                         FORM-IV
                                         (PART-B)
                                      [See regulation 10]

              CERTIFICATE OF MANUFACTURE AND TEST FOR PIPES

Certificate No. ---------------                                        Date: -------

Name of part & Quantity……………………………………………………………………………………………………………………….

Drawing No……………………………………………………………………………………………………………………………………………

Maker’s name and address………………………………………………………………………………………………………………………

Customer’s Name & Address……………………………………………………………………………………………………………………

*Maximum allowable working pressure ………………Kg/cm²(g)

*Design temperature………….. ºC

RAW MATERIAL

Process of manufacture……………………………………………………………………………………………………………….

Fully killed/rimmed……………………………………………………………………………………………………………………..

Chemical composition……………………………….……………………………………………………………………………..

Heat Number………………………………………………..…………………………………………………………………………….

Size……………………………………………………………………………………………………………………………………………

Test Certificate No.& Date………………………………....………………………………………………………………………

Name of the Steel Maker……………………………………………….…………………………………………………………

Name of Inspecting Authority…………………………………………….……………………………………………………….

PIPES

Process of manufacture…………………………………..………………………………………………………………………….

Main dimensions…………………………………………………………..……………………………………………………………

Tolerances…………………………………………………………………………………………………………………………………..
Specification…………………………………………………………………………………………………………………………………. Bend test on pipe or weld ………………………………………..……………………………………………………………… Flattening test………………………………………………………………….…………………………………………………………… Other tests……………………………………………………….…………………………………………………………………………
Tensile strength ………………………………………………………………..………………………………………………………… Chemical composition…………………………………………………….………………………………………………………… Heat treatment……………………………………………..…………………………………………………………………………… Hydraulic test………………………kg/cm²(g)
Identification mark of Inspecting Authority/Well known pipe maker …………………….……………………. Certified that the particulars entered herein are correct. The particulars of fabricated component are shown in drawing No. ..................
The pipe has been designed and constructed to comply with the Indian Boiler Regulations for a

*Maximum allowable working pressure of _____________ kg/cm²(g) and *maximum temperature of
____________0C and satisfactorily withstood a water test of ____ Kg/cm²(g) on the ___________ day of
____________ 20___, in the presence of our responsible representative whose signature is appended
hereunder.

Maker’s Representative          Maker
(Name and signature)    (Name and Signature)

         We have satisfied ourselves that the ________ have been constructed in accordance with Indian

Boiler Regulations 2026. The tests conducted on the samples taken from the finished pipes have been witnessed by us and the particulars entered herein are correct.

Original extracted text of the table above, continued (diagnostic)
     Name and signature of                                Name and signature of

     Competent Person       Inspecting Authority/Well Known Pipe Maker

Place _______________

Date ________________

NOTE (1): This form is intended for the use by both pipe makers and piping fabricators. Only such of the columns or paragraphs that are applicable, or information that can be obtained and furnished from other certificates, need to be filled or entered in this form.

NOTE (2): In the case of fabrications made from steel pipes obtained from elsewhere, particulars in regard to the “material” and “pipes” shall be taken from similar forms of certificates obtained in respect of pipes and noted in the appropriate columns or paragraphs.

NOTE-(3): For Stock and sale purpose, one Form shall be issued for not more than five pipes.

NOTE-(4): From Well-known pipe makers, digitally signed on-line Form shall also be accepted.

NOTE-(5): For Well-known Pipe Makers, Signatures of Competent Person and Inspecting Authority are not required.

NOTE-(6): * Applicable only for Piping fabricators.

In the case of pipes made from steel, made and tested by well-known Steel Makers in India or other countries, particulars regarding the ‘material’ as certified by them in Form V(Part-A) shall be noted in the appropriate columns or paragraphs of Raw material in this certificate.

Form IV(C):R01

                                                                  Dated: 07.08.2026

                                      FORM-IV
                                      (PART-C)
                                 [See regulation 11]

                   CERTIFICATE OF MANUFACTURE AND TEST FOR TUBES

Certificate No. ---------------                                   Date: ---------

Name of part & Quantity…………………………………………………………………………………………………………………..

Drawing No…………………………………………………….……………………………………………………………………………………

Maker’s name and address………………………………………………..……………………………………………………………………

Customer’s Name & Address…………………………………………….…………………………………………………………………….

*Maximum allowable working pressure …………………… kg/cm²(g)

*Design temperature…………….. °C

RAW MATERIAL

Process of manufacture………………………………………………………………………………………………………… Fully killed/rimmed……………………………………………………………………………………………………………………. Chemical Composition………………….…………………………………………………………………………………………. Heat Number…………………………….……………………………………………………………………………………………….
Size……………………………………………………………………………………………………………………………………………..
Test Certificate No.& Date……………………………...………………………………………………………………………. Name of the Steel Maker……………………………………………….………………………………………………………… Name of Inspecting Authority………………………………………….……………………………………………………….

TUBES

Process of manufacture ……………………………………………………………………………….
Main dimensions …………………………………………………………..……………………………………………………………. Tolerances…………………………………………………………………………………………………………………………………..
Specification………………………………………………………..…………………………………………………………………….. Tensile strength……………………………………………………………………………………………………………………….. Chemical Composition……………………………………………………………………………………………………………… Elongation percentage………………………………………………….…………………………………………………………. Bend test………………………………………………………………..………………………………………………………………..
Flattening test…………………………………………………………..……………………………………………………………… Crushing test…………………………………………………………………………………………………………………………….
Flare test………………………………………………………………..…………………………………………………………………
Flange test………………………………………………………………………………………………………………………………….. Other Tests
Heat treatment…………………………………………………………………………………………………………………………

Hydraulic test………………………………………. kg/cm²(g)

Identification mark of Inspecting Authority/Well known tube maker …………………….……………………………

Certified that the particulars entered herein are correct. The particulars of fabricated component are shown in drawing No. ..................

The tube has been designed and constructed to comply with the Indian Boiler Regulations for a

*Maximum allowable working pressure of _____________ Kg/cm²(g) and *maximum temperature of
____________ºC and satisfactorily withstood a water test of ____ Kg/cm²(g) on the ___________ day of
____________ 20___, in the presence of our responsible representative whose signature is appended
hereunder.

Maker’s Representative                                           Maker
 (Name and signature)                                      (Name and Signature)

We have satisfied ourselves that the ________ have been constructed in accordance with Indian Boiler

Regulations 2026. The tests conducted on the samples taken from the finished tubes have been witnessed by us and the particulars entered herein are correct.

Original extracted text of the table above, continued (diagnostic)
         Name and signature of             Name and signature of
           Competent Person     Inspecting Authority/Well Known Tube Maker

Place ________________

Date ________________

NOTE (1): This form is intended for the use by both tube maker and tube fabricators. Only such of the columns or paragraphs that are applicable, or information that can be obtained and furnished from other certificates, need to be filled or entered in this form.

NOTE (2): In the case of fabrications made from steel tubes obtained from elsewhere, particulars in regard to the “material” and “Tubes” shall be taken from similar forms of certificates obtained in respect of tubes and noted in the appropriate columns or paragraphs.

NOTE-(3): For Stock and sale purpose, one Form shall be issued for not more than ten tubes.

NOTE-(4): From well-known tube manufacturers, digitally signed on-line Form shall also be accepted.

NOTE-(5): For Well-known Tube Maker, Signatures of Competent Person and Inspecting Authority are not required.

NOTE-(6): *Applicable only for tube fabricators

In the case of tubes made from steel, made and tested by well-known Steel Makers in India or other countries particulars regarding the ‘material’ as certified by them in Form V(Part-A) shall be noted in the appropriate columns or paragraphs of Raw material in this certificate.

Form IV(D):R01 Dated: 07.08.2026

FORM-IV
(PART-D)
[See regulation 12]

CERTIFICATE OF MANUFACTURE AND TEST OF BOILER MOUNTINGS AND FITTINGS

Certificate No. ………….. Date: ……………………...

Name of part…………………………………………………………………………………………………………………………………………

Quantity …………………………………………………………………………………………… Sl. No……………………….

Drawing No……………………………………………………………………………………………………………………………………………..

Maker’s name and address………………………………………………………………………………………………………………………

Customer’s Name & Address…………………………………………………………………………………………………………………….

Maximum allowable working pressure ……………........kg/cm2 (g)

Design temperature…………….. °C

Hydraulic test pressure……………………………………………………………. kg/cm2 (g)

Main dimensions…………………………………………………………………….....................................................................

Specification………………………………………………………………………….......................................................................

Inspecting Authority’s Identification Marks……………………………………………………………………………………………….

Chemical composition…………………………………………………….………....................................................................

Physical test results………………………………………………………………….……..............................................................

(i)tensile strength………………………………………………………………...................................................

(ii)transverse bend test………………………………………………….………................................................

(iii)elongation…………………………………………………………............................................................. Other Tests……………………………………………………………….……….........................................................................

RAW MATERIAL

Process of manufacture………………………………………………………………

Fully killed/rimmed……………………………………………………………

Specification……………………………………………………….

Heat Number…………………………………………………………..

Size……………………………………………………………………………………

Test Certificate No.& Date………………………………………....

Name of the Maker…………………………………………………………….

Name of Inspecting Authority……………………………………………………….

     Certified that the particulars entered herein by us are correct.

         The ___________ has been designed and constructed to comply with the Indian Boiler
Regulations 2026 for a Maximum allowable working pressure of ____________ kg/cm2(g)

and maximum temperature of ______ °C and satisfactorily withstood a hydraulic test using water or
kerosene or any other suitable liquid to a pressure of ____________kg/cm2(g)on the __________ day of
________________ 20___ in the presence of our responsible representative whose signature is appended
hereunder:

     Maker Representative                                  MAKER
     (Name and signature)                           (Name and Signature)

         We have satisfied ourselves and the _________ has been constructed and tested in accordance

with the requirements of the Indian Boiler Regulations, 2026. We further certify that the particulars entered herein are correct.

Name and signature of                                                 Name and signature of
  Competent Person                                                    Inspecting Authority

who witnessed the tests

Place _______________
Date ________________

Note:              (1)   In the case of valve chest made and tested by well-known Foundries or

                   Forges recognized by the Central Boilers Board in the manner as laid down in

                   regulations17 to 21, particulars regarding the material as certified by them, in

                   Form-IV(Part-G) / Form-IV(Part-H)& Form-V(Part-A), shall be noted in the

                   appropriate columns or paragraphs in the certificates and in case of certificates

                   from Well Known Foundries or Forges is produced, such certificate may be

                   accepted in lieu of the certificate from Inspecting Authority in so far as it relates

                   to the testing of material specified in the Form.

(2)In case of safety valves, details and test results as required in item No.8 of Form-IV(Part-A) shall also be furnished duly signed by manufacturer and inspecting authority.

(3)For Stock and sale purpose, one Form shall be issued for not more than fifty mountings and fittings.

Form IV(E):R01 Dated: 07.08.2026

FORM-IV
(PART-E)
[See regulation 13 and 50 to 57]

CERTIFICATE OF MANUFACTURE AND TEST OF CASTINGS

Certificate No. and date

Heat Number* and date of pouring

Maker’s name and address …….

Customer’s name and address …………………………………………………………

Original extracted text of the table above, continued (diagnostic)
Drawing Nos. ……………………………………………………………………………………….

Description and quantity_____________________________________________Sl. No.____________

Foundry identification__________________________________

Chemical composition

Heat treatment

Physical test results.

(i)Tensile strength

(ii)Transverse bend test

(iii)Elongation

(iv)Other tests

Certified that the particulars entered herein by us are correct. This satisfies the requirements of Indian

Boiler Regulations, 2026.

Maker’s Representative Maker

(Name and signature) (Name and Signature)

Name and signature of Name and signature of Competent Person Inspecting Authority/Well Known foundry

*for castings of size more than 100mm Heat number must be as Cast except for Investment castings.

NOTE: Castings can be as cast, rough-machined or final machined.

Form IV(F):R01 Dated: 07.08.2026

FORM-IV
(PART-F)
[See regulation 14 and 58 to 62]

CERTIFICATE OF MANUFACTURE AND TEST OF FORGINGS
Certificate No. and date

Heat Number

Details of raw material

Maker’s name and address …….

Customer’s name and address …………………………………………………………

Original extracted text of the table above, continued (diagnostic)
Drawing Nos. ……………………………………………………………………………………….

Description and quantity______________________________ Sl.No._____________________

Forge shop identification__________________________________

Chemical composition

Heat treatment

Physical test results.

(i)Tensile strength

(ii)Transverse bend test

(iii)Elongation

(iv)Other tests

Certified that the particulars entered herein by us are correct. This satisfies the requirements of Indian Boiler Regulations, 2026.

Maker’s Representative Maker
(Name and signature) (Name and Signature)

Name and signature of Name and signature of
Competent Person Inspecting Authority/Well Known Forge.

Form IV(G):R01 Dated: 07.08.2026

FORM-IV
(PART-G)
[See regulation 15]

CERTIFICATE OF MANUFACTURE AND TEST FOR (HEADERS,

DESUPERHEATERS/ATTEMPERATOR, BLOWDOWNTANK, FEEDWATERTANKS, ACCUMULATOR,

DEAERATOR)

T.C.NO.: ……………………………………………………… DATE: ………………………………………………..

Name of the Part : …………………………………………………

Maker's Name & Address : ……………………………………………….

Customer's Name & Address : …………………………………………………

Drawing No. : ……………………………………

Maximum allowable :
working pressure
(kg/cm²(g))

Process of Manufacture, Design Temp.(oC) : Material condition,

chemical composition,         Refer enclosed Raw          Heat Treatment  :

Tensile Strength,
material Test Certificates or Form-V(Part-B) in lieu Hydraulic Test :

of Raw material Test Pressure
Certificates Non-destructive :

Testing

Tolerances,

Bend Test, Flattening Test
etc.

Inspecting Authority Identification Mark:

Item No.PART NAMEMATERIAL SIZEQUANTITYMELT No.
01PIPE
02END COVER
03STUBS
04BRANCH PIPES
05
06

Table structure read from the Gazette PDF, page 894. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Item No.          PART NAME                MATERIAL SIZE QUANTITY              MELT No.

   01                 PIPE
   02            END COVER
   03
   04                STUBS
   05           BRANCH PIPES
   06

Certified that the particulars entered herein are correct.

The parts have been constructed to comply with the Indian Boiler Regulations, 2026 for a maximum

allowable working pressure of --------------------- and temperature of -------------- and satisfactorily withstood
a water test of ----------------on the --------------day of ------------------- in the presence of our responsible
representative whose signature is appended hereunder.

Signature and Seal of Maker's Representative                       Signature and Seal of Maker

Final Inspection Date: ………………………………………………

We have satisfied ourselves that the……………………….. have been constructed in accordance with Indian

Boiler Regulations, 2026. The tests conducted have been witnessed by us, wherever applicable and the particulars entered herein are correct.

Name and Signature of Competent Person Name and Signature of Inspecting Authority

Place:………………………………….

Date:…………………………………..

Form IV(H):R01 Dated: 07.08.2026

FORM-IV
(PART-H)
[See regulation 16]

CERTIFICATE OF MANUFACTURE AND TEST FOR DISHED ENDS / END COVERS

Original extracted text of the table above, continued (diagnostic)
T.C.NO.:                   …………………………………                     DATE: …………………………………………………

Name of the Part           :

Maker's Name & Address :

Customer's Name & Address :

Drawing No.:Maximum allowable
working pressure
(kg./cm²(g))
:
Process of Manufacture,Design Temp.(ºC):
Material condition,
chemical composition,Refer enclosed Raw
material Test Certificates or
Form-V(Part-B) in lieu of Hydraulic Test Pressure
Raw material Test
Certificates
Heat Treatment
Non-destructive Testing :
:
:

Columns reconstructed from the extracted text; check against the Gazette page.

Show original extracted text (diagnostic, not authoritative)
Drawing No.                :                                 Maximum allowable  :

                                                             working pressure

                                                             (kg./cm²(g))

Process of Manufacture,                                      Design Temp.(ºC)   :
Material condition,
chemical composition,         Refer enclosed Raw             Heat Treatment     :

                              material Test Certificates or
                              Form-V(Part-B) in lieu of Hydraulic Test Pressure :

                              Raw material Test

                              Certificates                   Non-destructive Testing :

Tensile Strength, :

Tolerances,

Bend Test, Flattening Test
etc.

Inspecting Authority Identification Mark:

ITEM No.PART NAMEMATERIAL SIZEQUANTIT YSPECN.MELT No. / PLATE NO.TC NO & DATE
01PLATE / FORGING

Table structure read from the Gazette PDF, page 896. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
ITEM No.        PART NAME     MATERIAL         QUANTIT          SPECN.         MELT No. /  TC NO &
                                 SIZE               Y                          PLATE NO.    DATE

01 PLATE / FORGING

Certified that the particulars entered herein are correct.

 Signature and Seal of Maker's Representative                                Signature and Seal of Maker
Final Inspection Date:


          We have satisfied ourselves that the _____________have been constructed in accordance with the Indian

Boiler Regulations, 2026. The test conducted have been witnessed by us and the particulars entered herein are correct.

Name and Signature of Competent Person Name and Signature of Inspecting Authority

Place:……………………………..

Date:………………………………

Form V(A):R01 Dated: 07.08.2026

FORM-V
(PART-A)
[Regulation 8(d)]

STEEL MAKER’S CERTIFICATE OF MANUFACTURE AND RESULTS OF TESTS

We hereby certify that the material described below has been made by M/s. ……………… by the ………………… process, as per specifications ………………… and rolled by ………………… and has been satisfactorily tested in the presence of our Test House Manager or his representative in accordance with the stipulated tests and tolerances.

For plates and bars, the physical properties are required to be mentioned whereas, for ingots, billets, blooms, slabs and concast bars which are to be processed further, the physical properties are not required to be mentioned by the steel manufacturer.

RESULTS OF TESTS

Size
Heat Number
Brand & Number
Name of product

Length
(meters)
Breadth
(meters)
Thickness or
diameter

(mm)Number of pieces
Ultimate tensile
breaking strength in kg/mm2
Percentage
Elongation
Bend Tests

Remarks

Chemical analysis.…………………………………………………………………………………………………………………………………………… Other tests ……………………………………………………………………………………………………………………………………………………...

Maker’s Representative                                        Maker

(Name and signature)                                          (Name and signature)

         We have satisfied ourselves that the ________ have manufactured the products in accordance

with Indian Boiler Regulations, 2026. The tests conducted on the samples taken from the finished products have been witnessed by us and the particulars entered herein are correct.

Original extracted text of the table above, continued (diagnostic)
Name and signature of                      Name and signature of

Competent Person        Inspecting Authority/ Well Known Steel Maker.

Place _______________

Date ________________


Form V(B):R01                                                                      Dated: 07.08.2026

                                      FORM-V
                                     (PART-B)
                                  [Regulation 8(d)]

CERTIFICATE OF MANUFACTURE AND RESULTS OF TESTS IN LIEU OF ORIGINAL TEST CERTIFICATES

It is hereby certified that original Test Certificate contain the following information in respect of the material used in the manufacture of the boiler or components thereof bearing Makers Number…………………… according to Drawing Number :………………………………………….

Boiler Quantity sizeCast/Heat No. Steel Making Specification
componentPlate No. Process
1
2 3
4
5
6
Name of SteelCertificate No. & DateHeat Treatment
Maker/Part Maker
789
% Chemical Analysis C Mn P S Si* otherYield strength
U.T.S.
Elongation %
Bend
Name of
alloying elements(Kg/mm2)
(Kg/mm2)
Gauge Length
Test
the
inspecting
authority
1011
12
13
14
15

Table structure read from the Gazette PDF, page 899. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
   Boiler          Quantity size  Cast/Heat No.        Steel Making  Specification
component                           Plate No.             Process           6
                   2  3
      1                                  4                    5

  Name of Steel                   Certificate No. & Date                            Heat Treatment
Maker/Part Maker                              8                                             9

          7

% Chemical Analysis C Mn P S Si* other Yield strength    U.T.S.      Elongation %   Bend   Name of
                                                       (Kg/mm2)      Gauge Length   Test       the
alloying elements                 (Kg/mm2)
                                                                                     14    inspecting
               10                 11                   12            13                    authority

                                                                                               15

*(Carbon, Manganese, Phosphorus, Sulphur, Silicon).

Certified that the particulars entered herein by us are correct. This satisfies the requirements of Indian Boiler Regulations, 2026.

Maker’s Representative Maker

(Name and signature) (Name and Signature)

Name and signature of Competent Person Name and signature of Inspecting Authority

Form VI(A):R01 Dated: 07.08.2026

FORM-VI

(PART-A)

[See regulation 17(2)]

QUESTIONNAIRE TO BE ANSWERED BY FIRMS/COMPANIES SEEKING RECOGNITION BY THE CENTRAL BOILERS

BOARD TO BECOME AN “INSPECTING AUTHORITY”

1. The registered name and address of the company/firm:

2. Address for correspondence:

3. The year in which the company/firm was established.

4. Proposed countries/areas of operation as Inspecting Authority:

5. Is company/firm registered in the proposed countries of operations?

If so, please give details thereof.

6. Have you any Branch or Associate Office?

If so, please give their names and addresses.

7. Is company/firm functioning as an Inspecting Authority under the Indian or International codes and standards?

If so, details thereof.

8. In case of renewal of recognition as Inspecting Authority under the Indian Boiler Regulations, 2026, had you conducted inspection during the last five years?

If yes, details thereof.

9. Is company/firm involved in any commercial activity other than inspection, certification and related activities under the Indian or International Codes and standards?

If so, details thereof.

10. Please state the types, size and the range of design pressure of the boilers which you have so far inspected during manufacture as an Inspecting Authority, also state the classes of service you render, namely: -

(a)Please name the various stages of manufacture at which inspections are carried out.

(b)Only hydraulic test after the manufacture of the boiler.

11. How many Inspectors/Competent persons have you in your employment? Please give details of the qualifications held by those persons.

12. Have you any Testing Laboratory of your own to conduct all destructive and non-destructive tests required in connection with the manufacture of boilers?

If so, details thereof.

13. Have you in-house design and drawing inspection office?

If so, details thereof.

14. Have you any documented quality programme established and maintained to fulfill the inspection requirements as per Indian Boiler Regulations, 2026?

If so, details thereof.

15. Are you having Curriculum Vitae of all the inspectors/competent persons employed in the organization for inspection and certification work?

16. Are you having a training programme for Inspectors/Competent persons? If so, details thereof.

17. Are you prepared to conduct the work of Inspection of boilers, economisers and their accessories strictly in conformity with the Indian Boiler Regulations, 2026?

18. Are you prepared to accept full responsibility for the certificate issued by you?

19.Has your request for recognition as an Inspecting Authority been rejected by any Authority? If so, please give details.

20. Are you prepared to issue certificates for the products, you inspect, in the formats of the Indian Boiler

Regulations?

21.Are you aware that the recognition is for a period of five years only, which is renewable after every five years on fresh assessment?

NAME, SIGNATURE & SEAL

Form VI(B):R01 Dated: 07.08.2026

FORM-VI
(PART-B)
[See regulation 17(2)]

QUESTIONNAIRE FOR ELICITING INFORMATION REGARDING THE COMPETENCY OF A FIRMOR COMPANY TO BE

RECOGNISED AS “COMPETENT AUTHORITY”

1. Registered name and address of the company/firm.

2. Address for correspondence.

3. Year in which the company/firm was established.

4. Address of branch or associate office, if any.

5. Principal work of the company/firm.

6. Does the company/firm have any training section for the welders? If so, details of the scheme to be stated.

7. Does the company/firm regularly conduct tests on welds done by its welders? If so, the code followed and the details of tests carried out may please be stated.

8. What are the facilities that can be provided or availed of by the organisation for conducting the tests?

9. Is the company/firm prepared to undertake testing of welders employed by other organisation?

10. In case of renewal of recognition as Competent Authority under the Indian Boiler Regulations, 2026, have you undertaken inspection and certification of welders during the last five years? If yes, details thereof.

11. Whether the company/firm is prepared to conduct tests as per requirements of the Indian Boiler Regulations, 2026?

12. The amount of fee which the company/firm would charge from a candidate for conducting a test for the issue of certificate. Estimates under the following heads may be given:

(a)For the supply of tests pieces, electrodes and/or filler rods:

(b)For the use of welding machine:

(c)For machining the test pieces and preparation of specimen:

(d)For conducting mechanical tests (including specimen preparation):

(e)For non-destructive testing:

13. Is the company/firm prepared to examine and issue certificate to welders in accordance with the requirements of the Indian Boiler Regulations, 2026?

14. Is the company/firm prepared to take full responsibility for certificates issued by it.

15. Are you aware that the recognition is for a period of five years only which is renewable after every five years on fresh assessment?

NAME, SIGNATURE & SEAL

Form VI(C):R01 Dated: 07.08.2026

FORM-VI
(PART-C)
[See regulation 17(2)]

QUESTIONNAIRE TO BE ANSWERED BY STEEL MAKER SEEKING RECOGNITION BY CENTRAL BOILERS BOARD TO BE

NOTIFIED AS “WELL KNOWN STEEL MAKERS”

1. Registered Name and address of the firm/company:

2. Works address:

3. The year in which the factory was established:

4. Capacity for production of steel:

5. Process of manufacture of steel:

6. Variety of steel products:

7. Range of steel produced in each variety:

8. Various national and international Standards to which the steel products are manufactured:

9. Testing facilities available within the works:

10. Types of tests conducted:

11. If so, by whom conducted:

12. Are the tests conducted by the firm/company acceptable to the other organisations of the country? If so, by whom?

13. Is the firm/company prepared to conduct tests in accordance with the Indian Boiler Regulations, 2026?

14. Is the firm/company recognised as “Well Known Steel Maker” in any other country?

15. Whether the firm/company has minimum two years’ experience to produce steel in accordance with the provision of Indian Boiler Regulations under the inspection of any recognised Inspecting Authority.

If yes, details thereof.

16. Whether the firm/company is prepared to furnish certificates under the provision of Indian Boiler

Regulations, 2026.

17. In case of renewal of recognition, had you manufactured and supplied steel as “Well Known Steel Maker” under the Indian Boiler Regulations during the last five years? If yes, details thereof.

18. Whether the firm/company manufacture steel from the ore itself or from ore and scrap or scrap only:

19. Whether the firm is agreeable to show their manufacturing process and in-house testing facilities to a team consisting of three members appointed by the Board.

20. Are you aware that the recognition is for a period of five years only which is renewable after every five years on fresh assessment?

NAME, SIGNATURE & SEAL

Form VI(D):R01 Dated: 07.08.2026

FORM-VI
(PART-D)
[See regulation 17(2)]

QUESTIONNAIRE TO BE ANSWERED BY FOUNDRY/FORGE SEEKING RECOGNITION BY CENTRAL BOILERS BOARD

TO BE NOTIFIED AS “WELL KNOWN FOUNDRY/FORGE”

1. The registered name and address of the firm/company:

2. Works address:

3. The year in which the factory was established:

4. Capacity of the foundry/forge:

5. (i) Capacity for production of forgings/castings:

(ii)Maximum weight and size of forgings/castings:

6. Detailed description of the type of job done by the firm/company:

7. Materials of castings/forgings (ferrous-plain or alloy steel, non-ferrous alloys):

8. Range of forgings/casting produced in each variety:

9. Testing facilities available within the works:

10. Details of testing facility, namely chemical and physical tests:

11. Types of test conducted:

12. If so, by whom conducted?

13. Are the tests conducted by the firm/company itself acceptable to the other organisations of the country?

If so by whom?

14. Is the firm/company prepared to conduct tests in accordance with the Indian Boiler

Regulations, 2026?

15. Is the firm/company recognised as “Well Known Foundry/Forge” in any other country?

16. Whether the firm/company is in a position to produce forgings/casting in accordance with any national/international specifications fulfilling the minimum requirements of Indian Boiler Regulations,

2026:

17. Whether the firm/company has minimum two years’ experience to produce forgings/castings in accordance with the provision of Indian Boiler Regulations under the inspection of any recognised Inspecting Authority. If yes, details thereof.

18. Whether the firm/company is prepared to furnish certificates under the provision of Indian Boiler Regulations, 2026.

19. In case of renewal of recognition, had you manufactured and supplied castings/forgings as “Well Known Foundry/Forge” under the Indian Boiler Regulations during the last five years? If yes, details thereof.

20. Whether the firm/company is agreeable to show their process of manufacture, in-house testing facilities to a team of members appointed by Central Boilers Board.

21. Are you aware that the recognition is for a period of five years only, which is renewable after every five years on fresh assessment?

NAME, SIGNATURE & SEAL

Form VI(E):R01 Dated: 07.08.2026

FORM-VI
(PART-E)
[See regulation 17(2)]

QUESTIONNAIRE TO BE ANSWERED BY TUBE/PIPE MAKER SEEKING RECOGNITION BY CENTRAL BOILERS BOARD

AS “WELL KNOWN TUBE/PIPE MAKER”

1. Registered name and address of the firm/company:

2. Works address:

3. The year in which the factory was established:

4. Capacity of production of Tube/Pipe and the tonnage details per during the last three years:

5. Steel grades of Tube/Pipes under production:

6. Size range of Tubes/Pipes under production:

7. Process of manufacture of Tube/Pipes:

8. (a) Whether the firm/company is producing the raw material or purchasing the raw material.

(b)If the raw material is purchased, give the details of purchase in last three years.

i. from well-known steel makers under Indian Boiler Regulations.

ii. from other sources.

9. If purchase is as per 8(b)(ii), state whether the raw material is tested at Tube maker’s/Pipe maker’s premises under Indian Boiler Regulations.

10. If the firm/company is producing raw material, state whether the firm/company is recognised as Well

Known steel maker under Indian Boiler Regulations.

11. Major manufacturing facilities available with the firm/company:

12. Testing facilities available with the works:

13. Types of tests conducted on Tubes/Pipes (enclose complete quality control plan from raw material stage to finished stage along with the quality control and inspection personnel of the firm):

14. The details of failures and rejection

(a)By Non-Destructive Testing(NDT)

(b)By Destructive Testing.

15. Whether the firm/company is in a position to manufacture Tubes/Pipes and also provide for their necessary testing facilities in accordance with the provision in Indian Boiler Regulations, 2026.

16. Whether the firm/company has minimum two years’ experience to produce Tubes/Pipes in accordance with the provision of Indian Boiler Regulations under the inspection of any recognised Inspecting Authority.

If yes, details thereof.

17. Whether the firm/company is prepared to furnish certificates under the provision of Indian Boiler Regulations, 2026.

18. In case of renewal of recognition, had you manufactured and supplied Tubes/ Pipes as “Well Known Tubes/Pipes Maker” under the Indian Boiler Regulations during the last five years? If yes, details thereof.

19. The name of the firms to whom the firm /company has supplied Tubes/Pipes:

20. Whether the firm/company is agreeable to show their manufacturing process and in-house facilities to a team consisting of three members appointed by the Board.

21. Whether the firm/ company is aware of the fact that the recognition is for a period of five years only, which is renewable after every five years term on fresh assessment?

NAME, SIGNATURE& SEAL

Form VI(F):R01 Dated: 07.08.2026

FORM-VI
(PART-F)
[See regulation 17(2)]

QUESTIONNAIRE TO BE ANSWERED BY A LABORATORY SEEKING RECOGNITION BY CENTRAL BOILERS BOARD AS A “WELL-KNOWN MATERIAL TESTING LABORATORY”

1. The registered name and address of the laboratory:

2. Address of the laboratory:

3. The year in which the laboratory was established:

4. (a) Whether the laboratory is recognised by the Central Government or by a State Government:

(b)If so, please furnish particulars of recognition:

5. Name and address of branch or associate laboratory, if any:

6. How long the laboratory has been functioning for testing of the products?

7. Equipment or machines available in the laboratory for carrying out the non-destructive or destructive testing:

8. Type and range of tests carried out by the laboratory:

9. Details of testing personnel and their qualifications or experience:

10. Are you prepared to conduct the testing of specimens strictly as per the requirements of the Indian Boiler

Regulations, 2026?

11. Has your request for recognition as an approved laboratory been rejected by any authority? If so, please give details.

12. Are you prepared to issue the certificates for the products you test in the formats of the Indian Boiler

Regulations, 2026?

13. Whether you have minimum two years’ experience of conducting tests in accordance with the provision of Indian Boiler Regulations under the inspection of any recognised Inspecting Authority.

If yes, details thereof.

14. In case of renewal of recognition, had you conducted tests under the provisions of Indian Boiler Regulations during the last five years?

If yes, details thereof.

15. Are you agreeable to show your laboratory and in- house facilities to a team consisting of three members appointed by the Board?

16. Are you aware that the recognition is valid for a period of five years only, which is renewable for five years on fresh assessment?

NAME, SIGNATURE & SEAL

Form VI(G):R01 Dated: 07.08.2026

FORM-VI

(PART-G)

[See regulation 17(2)]

QUESTIONNAIRE TO BE ANSWERED BY A FIRM SEEKING RECOGNITION BY CENTRAL BOILERS BOARD AS

“REMNANT LIFE ASSESSMENT ORGANISTION” UNDER REGULATIONS 313 to 315

1. The registered name and address of the firm/company:

2. Address of the firm/company:

3. The year in which the firm /company was established:

4. (a) Whether the firm/company is recognised by the Central Government or by State Government:

(b)If so, furnish particulars of recognition:

5. Name and address of branch or associate firm, if any:

6. How long your firm has been functioning for Remnant Life Assessment of Boilers and Boiler Parts:

7. Equipment or machines available in the laboratory for carrying out the non-destructive or destructive testing:

8. Type and range of tests carried out by the firm/company:

9. Details of testing personnel and their qualifications and experience:

10. Are you prepared to conduct the testing of specimens strictly as per the requirements of the Indian

Boiler Regulations, 2026?

11. Has your request for recognition as an approved organisation been rejected by any authority?

If so, please give details.

12. Are you prepared to issue the certificates for the tests recommended in the formats of the Indian

Boiler Regulations, 2026?

13. In case of renewal of recognition, had you conducted Remnant Life Assessment of Boilers and Boiler parts under the Indian Boiler Regulations during the last five years?

If yes, details thereof.

14. Are you agreeable to show your laboratory and in-house facilities to a team consisting of three members appointed by the Board?

15. Are you aware that the recognition is valid for a period of five years only, which is renewable for five years on fresh assessment.

                                                      NAME ,SIGNATURE& SEAL


Form VII(A):R01                                                                     Dated: 07.08.2026

                          FORM-VII
                          (PART-A)
                     [See regulation 19]

                     NATIONAL EMBLEM

Serial No…………………………                                                                 File No……………………..
                                        CENTRAL BOILERS BOARD
                     CERTIFICATE OF APPROVAL FOR INSPECTING AUTHORITY

          This is to certify that the Inspection and Quality Management System of:
M/s ________________________________

          ________________________________
          ________________________________
          _________________________________

has been evaluated by the Central Boilers Board and has been granted recognition under regulation 19 of the Indian Boiler Regulations, 2026, as an INSPECTING AUTHORITY for operation in

This certificate is valid for five years, i.e. upto…………………………..

Validity is subject to the adherence to the quality control prescribed under the provisions of the Indian Boiler

Regulations, 2026.

                                                                                    _______________

                                                                                    Date of Issue Certificate

No. --------------                                                                  _________________

                                                                                    Secretary

Form VII(B):R01                                                              Dated: 07.08.2026
                                                       FORM-VII
                                                        (PART-B)
                                                  [See regulation 19]

                            NATIONAL EMBLEM

Serial No…………………….                                              File No…………………………………..

                                               CENTRAL BOILERS BOARD
                            CERTIFICATE OF APPROVAL FOR COMPETENT AUTHORITY

This is to certify that the Examination of Welder System of:
M/s _______________________

          _______________________
          _______________________

has been evaluated by the Central Boilers Board and has been granted recognition under regulation 19 of the Indian Boiler Regulations, 2026, as a COMPETENT AUTHORITY for operation in

This certificate is valid for five years, i.e. upto………………………..

Validity is subject to the adherence to the quality control prescribed under the provisions of the Indian Boiler

Regulations, 2026.

                                                                             _________________

                                                                             Date of Issue

Certificate No.___________                                                   ________________

                                                                             Secretary


Form VII(C):R01                                                             Dated: 07.08.2026

                                    FORM-VII
                                    (PART-C)
                               [See regulation 19]

                               NATIONAL EMBLEM

Serial No……………………                                                                           File No……………………………..
                                                 CENTRAL BOILERS BOARD
                           CERTIFICATE OF APPROVAL FOR WELL-KNOWN STEEL MAKER

This is to certify that the Inspection and Quality Management System of:

M/s _________________________

_________________________

has been evaluated by the Central Boilers Board and has been granted recognition under regulation 19 of the Indian

Boiler Regulations, 2026, as WELL KNOWN STEEL MAKER, for the manufacture of _____________________

_____________________________________________________________________________________________

for their factory at       ________________________________

                           ________________________________

                           _________________________________

                           _________________________________

This certificate is valid for five years, i.e. upto_______________________

Validity is subject to the adherence to the quality control prescribed under the provisions of the Indian

Boiler Regulations, 2026.

                                                                            _________________

                                                                            Date of Issue

Certificate No.____________                                                 ________________

                                                                            Secretary

Form VII(D):R01                                                             Dated: 07.08.2026
                                                        FORM-VII
                                                         (PART-D)
                                                   [See regulation 19]

                             NATIONAL EMBLEM

Serial No……………………………                                                        File No………………………

                             CENTRAL BOILERS BOARD

                      CERTIFICATE OF APPROVAL FOR WELL-KNOWN FOUNDRY

This is to certify that the Inspection and Quality Management System of:
M/s. _______________________
has been evaluated by the Central Boilers Board and has been granted recognition under regulation 19 of the Indian
Boiler Regulations, 2026 as a WELL KNOWN FOUNDRY for the manufacture of
_____________________________________________________________________________________________

for their factory at  ________________________________
                      ________________________________
                      _________________________________
                      _________________________________

This certificate is valid for five years, i.e. upto_______________________

Validity is subject to the adherence to the quality control prescribed under the provisions of the Indian Boiler

Regulations, 2026.

                                                                            _________________

                                                                            Date of Issue

Certificate No.____________                                                 ________________

                                                                            Secretary


Form VII(E):R01                                                             Dated: 07.08.2026

                                     FORM-VII
                                     (PART-E)
                                [See regulation 19]

Serial No…………………….                               NATIONAL EMBLEM            File No………………………

                                             CENTRAL BOILERS BOARD
                            CERTIFICATE OF APPROVAL FOR WELL KNOWN FORGE

This is to certify that the Inspection and Quality Management System of:

M/s __________________________

__________________________

__________________________

has been evaluated by the Central Boilers Board and has been granted recognition under regulation 19 of the Indian

Boiler Regulations, 2026 as a WELL KNOWN FORGE for the manufacture of

__________________________________________________________________

for their factory at  ________________________________

                      ________________________________

This certificate is valid for five years, i.e. upto_______________________

Validity is subject to the adherence to the quality control prescribed under the provisions of the Indian Boiler

Regulations, 2026.

                                                                            __________________

                                                                            Date of Issue

Certificate No.___________                                                  __________________

                                                                            Secretary


Form VII(F):R01                                                              Dated: 07.08.2026

                                      FORM-VII
                                      (PART-F)
                                 [See regulation 19]

                                 NATIONAL EMBLEM

Serial No…………………                                                                            File No…………………………..
                                                CENTRAL BOILERS BOARD
                           CERTIFICATE OF APPROVAL FOR WELL KNOWN TUBE MAKER

This is to certify that the Inspection and Quality Management System of:

M/s __________________________

     __________________________

has been evaluated by the Central Boilers Board and has been granted recognition under regulation 19 of the Indian

Boiler Regulations, 2026, as a WELL KNOWN TUBE MAKER for the manufacture of Tubes of sizes from

_______________________________ to ________________________________

for their factory at       ________________________________

                      ________________________________

This certificate is valid for five years, i.e. upto _______________________

Validity is subject to the adherence to the quality control prescribed under the provisions of the Indian Boiler

Regulations, 2026.

                                                                             _______________

                                                                             Date of Issue

Certificate No.__________                                                    ______________

                                                                             Secretary

Form VII(G):R01                                                               Dated: 07.08.2026
                                             FORM-VII
                                             (PART-G)
                                       [See regulation 19]

                                NATIONAL EMBLEM

Serial No…………………                                                            File No…………………………..

                                                CENTRAL BOILERS BOARD
                           CERTIFICATE OF APPROVAL FOR WELL KNOWN PIPE MAKER

This is to certify that the Inspection and Quality Management System of:

M/s __________________________

__________________________

__________________________

has been evaluated by the Central Boilers Board and has been granted recognition under regulation 19 of the Indian

Boiler Regulations, 2026, as a WELL KNOWN PIPE MAKER for the manufacture of pipe of sizes from

_________________________________ to _______________________________

for their factory at  _______________________________

                      ________________________________

                      _________________________________

                      _________________________________

This certificate is valid for five years, i.e. upto_______________________

Validity is subject to the adherence to the quality control prescribed under the provisions of the Indian Boiler

Regulations, 2026.

                                                                              _______________

                                                                              Date of Issue

Certificate No.__________                                                     ______________

                                                                              Secretary


Form VII(H):R01                                                          Dated: 07.08.2026

                                FORM-VII
                                (PART-H)
                           [See regulation 19]

                           NATIONAL EMBLEM

Serial No…………………                                                         File No…………………………..

                                                  CENTRAL BOILERS BOARD
                 CERTIFICATE OF APPROVAL AS WELL-KNOWN MATERIAL TESTING LABORATORY

This is to certify that after evaluation of the inspection and material testing system of the following laboratory, the Central Boilers Board has granted recognition to it under regulation 19 of the Indian Boiler Regulations, 2026, as a

Well-known Material Testing Laboratory.

M/s _________________________
          _________________________
          _________________________
           ________________________

This certificate is valid for five years, i.e. upto____________________

Note: The recognition will be as per the standards specified under the provisions of the Indian Boiler Regulations,

     2026.

                                                                         _______________

                                                                         Date of Issue

Certificate No.__________                                                ______________

                                                                         Secretary


Form VII(I):R01                                                             Dated: 07.08.2026

                        FORM-VII
                         (PART-I)
                   [See regulation 19]

                   NATIONAL EMBLEM

Serial No…………………                                                            File No…………………………..

                                                    CENTRAL BOILERS BOARD

CERTIFICATE OF APPROVAL AS WELL KNOWN REMNANT LIFE ASSESSMENT ORGANISATION

This is to certify that after evaluation of the inspection and material testing system of the following firm, the Central Boilers Board has granted recognition to it under regulation 19 of the Indian Boiler

Regulations, 2026 as a Well Known Remnant Life Assessment Organisation.

M/s._____________________                                                   _______________
_________________________                                                     Date of Issue

This certificate is valid for five years, i.e. upto_______________________  ______________
                                                                                  Secretary
Certificate No.__________


Form VIII:R00                                                          Dated: 07.08.2026

                                              FORM-VIII

                                 (Regulation 293)

                    MAKER’S NAME & ADDRESS

                    FINAL INSPECTION REPORT FOR BOILER COMPONENTS

REPORT NO:                                                      DATE:

THIS IS TO CERTIFY THAT THE PRESSURE PARTS DETAILED BELOW HAVE BEEN INSPECTED AND CLEARED UNDER THE INDIAN BOILER REGULATIONS, 2026.

BOILER NO.:

SL.PRODUCTDRAWING NO.DESCRIPTIONQTYCOMPETENT PERSON
NO.IDENTIFICATIONNO.IDENTIFICATION
MARK

Table structure read from the Gazette PDF, page 920. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
SL.  PRODUCT        DRAWING NO.               DESCRIPTION  QTY  COMPETENT PERSON

NO. IDENTIFICATION                                         NO.         IDENTIFICATION

                                                                       MARK

Signature and Seal of Maker’s Representative Name and signature of Competent Person

Form IX:R01 Dated: 07.08.2026

FORM-IX
[See regulation 295(7) and 295(8)]

DETAILS TO BE FURNISHED ALONGWITH APPLICATION FOR INSPECTION OF BOILER AFTER TWELVE/THIRTY SIX MONTHS OF THE CERTIFICATION UNDER REGULATION 311 AS PER

APPENDIX ‘H’ AND APPENDIX ‘I’

1. Name and address of the owner

2. Registry number of the boiler

3. Steam pressure and temperature

4. Rate of steam generation

5. Heating surface

6. Year of make

7. Brief description of boiler

8. Type of construction (Whether riveted or welded)

9. Whether fired or waste heat boiler

10. Date of registration

11. Details of past exemption granted by the Government, if any

12. Date of last annual inspection

13. Expiry date of current certificate

14. Maximum working pressure at which last certificate was issued

15. Details of past repairs (year-wise)

16. Remark as entered in the last certificate

17. Quality of boiler feed water

18. Whether requisite number of feed pumps are in satisfactory working condition at present?

19. Number of safety valves mounted on shell/drum and super heater

20. Total number of soot blowers provided in boiler

21. Number of soot blowers in working condition

22. Whether safety valves are blowing satisfactorily at or below design pressure?

23. Whether safety valve assembly is free from jamming as verified by operating casing lever?

24. Whether high and low water level alarm is in good condition?

25. Whether main steam stop valves, feed check valves, blow down valves and master pressure gauge in working condition?

26. Whether additional requirements for automatic boilers as per regulation 182 are complied with? (If ‘No’, give details)

27. Last date of calibration for master pressure gauge, temperature indicator/recorder for superheater, hot reheat, cold reheat and main steam line.

28. (a) Last date when boiler protection devices were satisfactorily tested and details thereof

(b)Last date when boiler protection devices were tested by simulation

29. Details of boiler stoppages in last twelve months with reasons and remedies thereof

30. Present irregularities in instruments and controls if any observed in control-room of boiler house

31. Details of present boiler leakage

32. Present operating pressure of the boiler

33. Whether water quality is tested on-line (enclose copy of test report showing values of analysis including

Total Dissolved Solids (TDS)

34. State at what intervals such test is carried out

35. When boiler was last opened for internal and/or external cleaning?

36. State at what intervals such cleaning is carried out

37. Whether there was any shut down since last inspection when the boiler could have been offered for inspection?

38. Whether working pressure of the boiler ever exceeded in the past beyond certified limit? If any, give details

39. Details of boiler accident which took place in the past, if any

40. List of Boiler Operation Engineers/Attendants

41. Irregularities, if any, noticed in the past in compliance of the Act

42. Whether guidelines laid down by Central Boilers Board for granting exemption to the waste heat boilers are fulfilled or not?

Name and Signature of General Manager (Generation)

Remarks of the Competent Person who verified correctness of above statement paying check visit to the Boiler House.

Name and signature of Competent Person

Form X :R01 Dated: 07.08.2026

FORM-X
[Regulation 300(2)]
PROVISIONAL ORDER UNDER SECTION 14 OF THE BOILERS ACT 2025

………………………… are hereby permitted to use the ……………… Boiler (Registry No. …………) Boiler rating …………… made by …………… and bearing Maker’s number ……………… at a design pressure of ……………… kg/cm2(g) pending the issue of or refusal of a certificate within six months from the date thereof after which period this order will become void.

Dated …………… Inspector of Boilers

Form XI:R01 Dated: 07.08.2026 FORM-XI
(Regulation 306)

BOILER INSPECTION DEPARTMENT
BOILER REGISTRY NUMBER

MEMORANDUM OF INSPECTION BOOK
OR

REGISTRATION BOOK

GENERAL

District…………………………………………
Owner…………………………………………
Address of Factory…………………………..

Nearest Railway Station……………………. KMs ………………………………… from station Factory is…………………………………….

Works or Factory (Type of Industry) ……………………………..

Working Season …………………………….

Boiler registered at…………………………… on……………………………………………………… Register Book No. …………………………… Page…………………………………………………. Registry Number……………………………… verified on……………………………………………. Design pressure of boiler …………………
Inspection Fee………………………………………...
Boiler Rating…………………………………… on……………………………………………….……. Registration Book Filed at…………………….

Remarks on transfers, etc.

PROVISIONAL ORDER AND CERTIFICATE RECORD

FeeDate ofDate ofCertificate No.Period ofDesign PressureMain SteamBoilerFuelEvaporationInitials of
(Rs.)paymentinspectionand datecertificateof boileroutlet Temp.Ratingused(T/hr or Kg/hr)Inspector/
[Kg/cm2(g)](°C)Competent
Person

Table structure read from the Gazette PDF, page 925. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Fee Date of Date of Certificate No. Period of Design Pressure Main Steam Boiler Fuel Evaporation   Initials of
                                                                                                   Inspector/
(Rs.) payment inspection and date certificate  of boiler outlet Temp. Rating used (T/hr or Kg/hr)  Competent

                                               [Kg/cm2(g)]  (°C)                                     Person

Type of Boiler: PARTICULARS AND DIMENSIONS

Maker: Leading Dimensions: Place and Year of make:
Intended Working Pressure:
Description of Boiler: Main Steam outlet temperature: Maker’s Number:
Details of Maker’s stamp
Position of Stamp ……………………

Boiler MAKER’S CERTIFICATE
Maker
Name………………………
Manufacture, hydraulic test to……………kg/cm²(g). Drawing No.…… received……………

Inspecting Name………………………
Authority Tests of material, construction, supervision, hydraulic test……………… received…………..

DETAILS OF PRESSURE PARTS

Original extracted text of the table above, continued (diagnostic)
S NO    NAME OF THE PRESSURE PART      SIZE   MATERIAL SPECIFICATION

                                       CYLINDRICAL SHELL                                          (b)
(a) Shell or Mud Drum(b) Steam Drum
Name of parts
Number
Length between end plates
Length between end plates seam
Diameter inside largest belt
Thickness of Plates
Number of belts of plating
Longitudinal seams
Position (o’clock)
Circumferential seams
No. of seams (end and inner)

Table structure read from the Gazette PDF, page 926. Verification status as for the text above.

Flat, dished, hemispherical (in………………………………………. pieces,) not stayed, not flanged
Diameter (outside), front………… back,………...crown…………………Largest circle …………..
Radius of curvature front………………………….back, …………………crown …………………...
PLATES
Radius of curvature, corner of flange,…………...
Plate, thickness, front …………… back, ……….
Attach to shell, crown or front, ………………….
shell, …………………
crown…………………
furnace, …… uptake, …
tubeplate F,…….. B, ….
Attach to shell, back end, ………………………..
Attach to uptake or furnace crown or front,…….
Attach to furnace flue, back end………………...
Gusset Stay, No. F.E., top, …………
Bottom, …………..
B.E., top, ………...
bottom, …………..
STAYS
Longtl. Stays No. …………………….
dia., ……………....
………….
Longtl. Stays pitch, Vertical ……..
Horizontal…………….. Circumferential
, …………...
………...
..
Diagl. Do, …………………………………………………………………………………………………….
MANHOLES, HAND AND SIGHT HOLES, DOORS AND STAND BLOCKS
rts and materials hereunder......................................................................……………………..
No. and position
Framed or plate flanged
Boiler opening, length × width
Frame opening, length × width
MANHOLES
Frame inside, outside, raised, pressed
Frame solid, welded, cast
Frame section on longtl. axis
Door, type and thickness
Door, if inside, spigot clearance
Bolts, No. dia., threads Nut
Bolts, pitch circle
Compensation ring, width x thickness

Table structure read from the Gazette PDF, page 927. Verification status as for the text above.

SIGHT HOLESNo. …………………………………... Compensation rings fitted ………… Doors, type …………………………. Cleaning plugs, No …………………dimensions ……………………. section ………………………… bolts dia.,…….. threads……… dia. ……………………………..positions ……………….. spigot clearance……….. position …………………
BLOCKETC.Height ……………………………….. Standpipe below stop valve, ………dia. (outside), top,… bottom…. height,…… dia. (outside) ……thickness ………..……... thickness ………..……...
Flanges ……………………………...

Table structure read from the Gazette PDF, page 928. Verification status as for the text above.

FIREBOX DETAILS
DETAILS OF FLUE TUBES
No. plain, ………………...Stay overall
length …… specification ………..
Plain, dia. (out) ……….....thickness, …
Front End.,welded, expd.,
beaded, feruled. Smoke End.,
welded Expd., beaded, or …..
Stay, dia. (out) ………......thickness, ………….
F.E.,welded, expd., beaded, , S.E,welded, Expd., ..
Pitch of plain tubes, V……H……………………….
D…………… C.Z. ……………….
I &II PASS TUBESPitch of stay tubes, V …..
No. plain, ………………...
Plain, dia. (out) ……….....
H…………………….
D ………….. C.Z. ……………….
Stay overall
length …… specification ………..
thickness, …
Front End.,welded, expd.,
beaded, feruled. Smoke End.,
welded Expd., beaded, or …..
Stay, dia. (out) ………......thickness, ………….
F.E.,welded, expd., beaded,
S.E,welded, Expd., ..
Pitch of plain tubes, V ….H …………………....
D ……….
C.Z. ………….
Pitch of stay tubes, V …..H…………………….
D ………..
C.Z. ………….

Table structure read from the Gazette PDF, page 928. Verification status as for the text above.

No., ………………………………
Type …………………………………
HORIZONTAL AND VERTICALFURNACESNo. of stiffener rings in each Furnace………………………Longtl. seams position
Length between
Centre
Inside diameter
Plate thickness
Positions of cross
tubes or stiffener
MOUNTINGS AND FITTINGS
Number
Diameter
Type
Material
Bolted OR
welded to
Safety
VALVES, ETC.Safety
Main. Stop
Aux. Stop
Feed
Blow Down
Injector
MISCELLANEOUS FITTINGSWater gauges, No. ………………………… type ………………… Test cocks No. …………………
Water gauges, top of lower nut is ………… ……………………… mm above …………………..
Pressure gauge, Type …………………….. dia.in mm … range ……… kg/cm² (g)
Pressure gauge, Maker …………………… No. …………. red line at …………… kg/ cm² (g)
Fusible plug, type …………………………. ………………………. position ………………………….
Blow down pipe connected to ……………………
Feed apparatus ……………………………………………………………………………………………

Table structure read from the Gazette PDF, page 929. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
                                                                                             Steam Drum
                                                                       (a)
                                                              Shell or Mud Drum

Name of parts

       Number
       Length between end plates
       Length between end plates seam
       Diameter inside largest belt
       Thickness of Plates
       Number of belts of plating
Longitudinal seams
       Position (o’clock)

Circumferential seams
       No. of seams (end and inner)


                   SHELL END PLATES AND STAYS

          Flat, dished, hemispherical (in………………………………………. pieces,) not stayed, not flanged

          Diameter (outside), front………… back,………...       crown…………………                                         Largest circle …………..

          Radius of curvature front………………………….            back, …………………                                        crown …………………...

PLATES    Radius of curvature, corner of flange,…………...   shell, …………………                                       furnace, …… uptake, …

          Plate, thickness, front …………… back, ……….        crown…………………                                         tubeplate F,…….. B, ….

          Attach to shell, crown or front, ………………….

          Attach to shell, back end, ………………………..

          Attach to uptake or furnace crown or front,…….

          Attach to furnace flue, back end………………...

          Gusset Stay, No. F.E., top, …………        Bottom, ………….. B.E., top, ………... bottom, …………..

STAYS     Longtl. Stays No. …………………….             dia., …………….... ………….                                        , …………...

          Longtl. Stays pitch, Vertical ……..      Horizontal…………….. Circumferential                            ………...
                                                  ..

          Diagl. Do, …………………………………………………………………………………………………….

          MANHOLES, HAND AND SIGHT HOLES, DOORS AND STAND BLOCKS

Parts and materials hereunder......................................................................……………………..

MANHOLES  No. and position
          Framed or plate flanged
          Boiler opening, length × width
          Frame opening, length × width
          Frame inside, outside, raised, pressed
          Frame solid, welded, cast
          Frame section on longtl. axis
          Door, type and thickness
          Door, if inside, spigot clearance
          Bolts, No. dia., threads Nut
          Bolts, pitch circle
          Compensation ring, width x thickness


SIGHT HOLES       No. …………………………………...                     dimensions …………………….         positions ………………..

                  Compensation rings fitted …………           section …………………………

                  Doors, type ………………………….                  bolts dia.,…….. threads………   spigot clearance………..

                  Cleaning plugs, No …………………               dia. ……………………………..           position …………………

BLOCK             Height ………………………………..                    dia. (outside), top,… bottom…. thickness ………..……...
    ETC.
                  Standpipe below stop valve, ………          height,…… dia. (outside) ……  thickness ………..……...

                  Flanges ……………………………...

                                                    FIREBOX DETAILS
                                              DETAILS OF FLUE TUBES

                  No. plain, ………………...        Stay         overall length …… specification ………..

                  Plain, dia. (out) ………..... thickness, …        Front End.,welded, expd.,
                                                                 beaded, feruled. Smoke End.,
                                                                 welded Expd., beaded, or …..

                  Stay, dia. (out) ………......  thickness, ………….   F.E.,welded, expd., beaded, , S.E,welded, Expd., ..
                  Pitch of plain tubes, V……   H……………………….        D…………… C.Z. ……………….

I &II PASS TUBES  Pitch of stay tubes, V …..  H…………………….         D ………….. C.Z. ……………….
                  No. plain, ………………...         Stay overall       length …… specification ………..
                  Plain, dia. (out) ……….....   thickness, …       Front End.,welded, expd.,
                                                                  beaded, feruled. Smoke End.,
                  Stay, dia. (out) ………......   thickness, ………….   welded Expd., beaded, or …..
                  Pitch of plain tubes, V ….   H …………………....      F.E.,welded, expd., beaded,
                                                                  S.E,welded, Expd., ..
                                                                   D ………. C.Z. ………….

                  Pitch of stay tubes, V …..  H…………………….         D ……….. C.Z. ………….


                                             FURNACE, CROWN AND UPTAKE

                         No., ………………………………        Type …………………………………

HORIZONTAL AND VERTICAL  No. of stiffener rings in each Furnace………………………Longtl. seams position
    FURNACES
                         Length between

                         Centre

                         Inside diameter

                         Plate thickness

                         Positions of cross
                         tubes or stiffener

                                                  MOUNTINGS AND FITTINGS

                                          Number  Diameter                   Type               Material  Bolted OR
                                                                                                          welded to

VALVES, ETC.             Safety
                         Safety
MISCELLANEOUS FITTINGS   Main. Stop
                         Aux. Stop
                         Feed
                         Blow Down
                         Injector

                         Water gauges, No. ………………………… type ………………… Test cocks No. …………………

                         Water gauges, top of lower nut is ………… ……………………… mm above …………………..
                         Pressure gauge, Type …………………….. dia.in mm … range ……… kg/cm² (g)
                         Pressure gauge, Maker …………………… No. …………. red line at …………… kg/ cm² (g)

     Fusible plug, type …………………………. ………………………. position ………………………….
     Blow down pipe connected to ……………………
     Feed apparatus ……………………………………………………………………………………………

Additional fittings ………………………………………………………………………………………….

SAFETY VALVES

(A) (B) (C)

No. of valves each chest………………………..
Type………………………………………………………
Diameter of valve seat (mm)…………………
Diameter of Neck (mm) ………………………..
Diameter of outlet (mm) ………………………

………………………………………………………………
__________________________________________________________________________________________


                   REQUISITE AREA OF SAFETY VALVES

                    For Saturated steam

                        A E

C.P.

                   For Superheated steam

                   As =    E x √1 + 1000 2.7 𝑇𝑠

                            C x P

E =   ; C =        ;P= ;A=

As =  ; T =        ; Ts =                           ;

                                               HEATING SURFACE

Total Heating Surface ……………………………………………………………………………………………………………………………Sq. m.

Boiler Rating
……………………………………………………………………………………..…………………………………………………………

HYDRAULIC TEST (REGISTRATION)
Inspector ……………………… Date of test ……………………… Test pressure .……………… kg/ cm²(g) Duration of test …………… mins. Boiler pressure, gauge No. …..…………… use at test ……………….. Boiler pressure gauge compared with ……………... on …………………… found …………………………. Position of Boiler at test …………………………………………………………………………………………… Brick work ……………………………………… Lagging ………………..………………………………………
Condition of boiler under test …………………………………………………………………………………….. Condition of boiler mountings under test ……………………………………………………...…………………

M I book prepared by …………………… on ……………………… submitted on ……………………….

M I Book Checked by ………………….. on ………………………………………………………………..

Chief Inspector/Director of Boiler’s remarks and signature

STEAM TEST (REGISTRATION)

Inspector …………………………………………………Date of Test ……………………………………….
Design pressure of boiler ………...kg/ cm²(g)Test pressure ……….. kg/ cm²(g)
Boiler connections ………………………………………Condition of fire …………………………………...
Fuel used ………………………………………………..Draught …………………………………………….
Safety Valve lifted at (A) ……………….kg/ cm²(g)(B) ……kg/ cm²(g). (C) …… kg/ cm²(g)..
Beginning5 mins.10 mins.15 mins.Difference
Timing of test…………………………….
Height of water in glass…………………
Pressure by Boiler gauge……………….

Table structure read from the Gazette PDF, page 932. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Inspector …………………………………………………                 Date of Test ……………………………………….
Design pressure of boiler ………...kg/ cm²(g)    Test pressure ……….. kg/ cm²(g)
Boiler connections ………………………………………            Condition of fire …………………………………...
Fuel used ………………………………………………..                Draught …………………………………………….
Safety Valve lifted at (A) ……………….kg/ cm²(g)  (B) …… kg/ cm²(g). (C) …… kg/ cm²(g)..

                                              Beginning 5 mins. 10 mins. 15 mins.  Difference

Timing of test…………………………….
Height of water in glass…………………
Pressure by Boiler gauge……………….

Accumulation of pressure, in (%)………………………………………………………………………..

Do safety valves efficiently relieve boiler? ……………………………………………………………………. Condition of boiler under steam ………………………………………………………………………………… Condition of mountings under steam ………………………………………………………………………….. Thickness of washers or ferrules ……………………………………………………………………………….

Feed pump or injector worked …………………………………………………………………………………..

Water gauge tested ………………………………………………………………………………………………
Boiler Attendant (or) Boiler Operation Engineer ……………………………………………………………..

Limit of load on safety valves to be entered in Certificate ……………………………………………………

NOTES ON WORKING OF BOILER
Boiler steam is used for …………………………………………………………………………………………….. Constant, intermittent or seasonal work …………………………………………………………………… Is boiler relieved by spare boiler? ……………………………………………………………………….. Nature of feed water ……………………………………………………………………………………………….
Fuel used …………………………… Are printed instructions kept near boiler? ………………………

Original extracted text of the table above, continued (diagnostic)
Period between cleanings recommended by Inspector ……………………………………………..

___________________________________________________________________________________
                                                 STEAM-PIPES

                                       PLAN OF MAIN STEAM-PIPES

Registry Nos. of connected boilers ……………………………

Provisions for disconnection from other boiler ………….

RECORDS OF INSPECTIONS AND TESTS
First inspection by …………………… on ……………………

First hydraulic test to kg/cm²(g) … by ……………………… on ………………………

INSPECTION NOTES

PARTICULARS OF BOILER ATTENDANTS & BOILER OPERATION ENGINEER
Date of visitNameGradeCertificate No.Date of Issue

Table structure read from the Gazette PDF, page 933. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
PARTICULARS OF BOILER ATTENDANTS & BOILER OPERATION ENGINEER

Date of visit Name                                    Grade  Certificate No.  Date of Issue

Form XII:R01 Dated: 07.08.2026

FORM-XII
(Regulation 310)

Registry Number of Boiler CERTIFICATE FOR USE OF A BOILER Boiler Rating
Type of Boiler

Registry Number of BoilerType of Boiler
Boiler RatingPlace and year of manufacture
Maximum Continuous Evaporation
Name of Owner
Situation of Boiler
Repairs
Remarks
Hydraulically Tested onto
kg/cm2(g)

Table structure read from the Gazette PDF, page 934. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
                                                        Place and year of manufacture

Maximum Continuous Evaporation

Name of Owner

Situation of Boiler

Repairs

Remarks

Hydraulically Tested on                   to      kg/cm2(g)
I hereby certify that the above described boiler is permitted by me/the Chief Inspector under the provisions of

Section 12/13 of the Boilers Act, 2025, to be worked at a maximum pressure of ……………… kg/cm2(g) for the period from

……………… to ………………

The loading of the ……………… safety valve is not to exceed ……………… kg/cm2(g)

Fee Rs. ……………… paid on ………………

Dated at ………… this ………… day of ………… 20……

Name and signature of
Competent Person

Countersigned
Chief Inspector

See Reverse for “Conditions”

CONDITIONS
(REVERSE OF FORM XII)

(1)No structural alteration, addition of renewal shall be made to the boiler otherwise than in accordance with section 18 of the Act.

(2)Under the provisions of Section 13 of the Act this certificate shall cease to be in force:

(a)on the expiry of the period for which it was granted; or

(b)when any accident occurs to the boiler; or

(c)when the boiler is moved the boiler, except a vertical boiler, the heating surface of which is less than two hundred square feet, or a portable or vehicular boiler; or

(d)save as provided in section 17 of the Act, when any structural alteration, addition or renewal is made in or to the boiler; or

(e)if the Chief Inspector in any particular case so directs when any structural alteration, addition or renewal is made in or to any steam-pipe attached to the boiler; or

(f)on the communication to the owner of the boiler of an order of the Chief Inspector or Inspector prohibiting its use on the ground that it or any boiler component attached thereto is in a dangerous condition.

Under Section 15 of the Act, when the period of a certificate relating to a boiler has expired, the owner shall, provided that he has applied before the expiry of that period for a renewal of the certificate be entitled to use the boiler at the design pressure entered in the former certificate, pending the issue of orders on the application but this shall not be deemed to authorise the use of a boiler in any of the cases referred to in clauses (b), (c), (d), (e) and (f) of sub-section (1) of section 13 occurring after the expiry of the period of the certificate.

(3)The boiler shall not be used at a pressure greater than the pressure entered in the certificate as the Design pressure nor with the safety valve set to a pressure exceeding such design pressure.

(4)The boiler shall not be used otherwise than in a condition which the owner reasonably believes to be compatible with safe working.

(5)Form XII shall be countersigned by the Chief Inspector at the time of registration only, as per the provisions of sub-section (6) of section 12 of the Act.

Note: The particulars and dimensions regarding this boiler may be obtained by the owner on payment in the prescribed manner on application to the Chief Inspector.

Form XIII:R01 Dated: 07.08.2026

FORM-XIII

[See regulation 316(2)]

QUESTIONNAIRE FORM FOR REPAIRER OF BOILERS/ECONOMISER/STEAM LINE/FEED WATER LINES

1. (a) Registered name of the firm and its permanent address ………………………………………………………

(b)Address of the workshop:

2. Year of establishment……………………………………………………………………………

3. Classification applied for—

(a)Special Class (For any Boiler Pressure)

(b)Class I (For Boiler Pressure upto 125 kg/cm2)

(c)Class II (For Boiler Pressure upto 40 kg/cm2)

(d)Class III (For Boiler Pressure upto 17.5 kg/cm2)

4. Type of jobs executed by the firm earlier, with special reference to their Design pressure, temperature and the materials involved, with documentary evidence

5. (a) Whether the firm has ever been approved by any Boilers’ Directorate/Inspectorate? If so, give details

(b)Has your request for recognition as a repairer under Indian Boiler Regulations, 2026 been rejected by any Authority?

If so, please give details

6. Whether having rectifier/generator, grinder, general tools and tackles, dye penetrant kit, expander and measuring instruments or any other tools and tackles under regulation 316(4)(a).

7. Detailed list of technical personnel with designation, educational qualifications and relevant experience (attach copies of documents) who are permanently employed with the firm

8. How many working sites can be handled by the firm simultaneously?

9. Whether the firm is prepared to execute the job strictly in conformity with the regulations and maintain a high standard of work?

10. Whether the firm is prepared to accept full responsibility for the work done and is prepared to clarify any controversial issue, if required?

11. Whether the firm is in a position to supply materials to required specification with proper test certificates if asked for?

12. Whether the firm has an internal quality control system of their own? If so, give details

13. List of welders employed with copies of current certificate issued by a Competent Authority under the Indian Boiler Regulations, 2026.

Date ………………… Name & Signature of the authorised signatory

Place ……………….. of the firm with stamp

Note 1: The recognition of the firm as a repairer shall be for a period of two years, thereafter they shall apply

Note 2: for renewal of their recognition at least two months before the expiry of the said period.

In case the repairer is found violating the provisions of the Act or Regulations knowingly or unknowingly, the firm shall be blacklisted under intimation to Chief Inspectors or Directors of Boilers of all the States/Union territories and renewal shall not be done in any case.

Form XIV:R01                                           Dated: 07.08.2026
                                  FORM- XIV

                                  [Regulation 322(3)]

                          THE BOILERS ACT, 2025
                      Boiler Inspection Department
                   Steam Pipes and Connected Fittings

                           Identification Number

                                         Memorandum of Inspection Book
_____________________________________________________________________________

                                                    MISCELLANEOUS

District ……………………………………………………………………………………………………………….

Owner ……………………………………………………………………………………………………………….

Address ……………………………………………………………………………………………………………..

Work of Factory: …………………………………………………………………………………………………..

Registration Number of Boilers to which the pipes and fittings, particulars of which are given in this Memorandum are connected.

Remarks Date Particulars of additions & alterations …………………… ……………………………………………………………………………………………. …………………… ……………………………………………………………………………………………. ……………………

……………………                       …………………………………………………………………………………………….
                               …………………………………………………………………………………………….
FEE AND APPROVAL TO PLAN RECORD
Drawing
Total
No. of
Fee
Date of
No. & date of
M.A.W.P.
TempRemarks &
No.
length of
Connected
Payment
approval of
approval
allowedinitial of
Steam
vessels
Plan & Layout Kg/cm2(g)
ºCInspector
Pipes
STEAM PIPES—PARTICULARS AND DIMENSIONS
Situation …………………………………………………………………………………………………………….
Ry. No. of connected Boilers ……………………………………………………………………………………..
Steam Piping System include …………………………………………………………………………………….
Pipes Material ………………………………………… Diameter (outside) …………………………………….
Pipes Thickness ……………………………………… Make ……………………………………………………
Attachment of Flanges …………………………………………………………………………………………….
Elbows, Tees etc. …………………………………………………………………………………………………..

Table structure read from the Gazette PDF, page 938. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
                    PLAN OF STEAM PIPES & THEIR CONNECTED FITTINGS

                               FEE AND APPROVAL TO PLAN RECORD

Drawing    Total    No. of Fee Date of No. & date of            M.A.W.P.    Temp     Remarks &
   No.   length of                                              approval   allowed    initial of
                    Connected  Payment approval of              Kg/cm2(g)             Inspector
          Steam                                                               ºC
           Pipes    vessels    Plan & Layout

                            STEAM PIPES—PARTICULARS AND DIMENSIONS
Situation …………………………………………………………………………………………………………….
Ry. No. of connected Boilers ……………………………………………………………………………………..
Steam Piping System include …………………………………………………………………………………….
Pipes Material ………………………………………… Diameter (outside) …………………………………….
Pipes Thickness ……………………………………… Make ……………………………………………………
Attachment of Flanges …………………………………………………………………………………………….
Elbows, Tees etc. …………………………………………………………………………………………………..

…………………………………………………………………………………………………………………
Support ………………………………………………………………………………………………………………
Flexibility …………………………………………………………………………………………………………….
Drainage …………………………………………………………………………………………………………….

Feed pipes ………………………………………………………………………………………………………….
Outside Dia. …………………………………………… Thickness ……………………………………………..

Make …………………………………………………………………………………………………………………
Max. Pressure ………………………………………… Max. Temp …………………………………………….
Connected Vessel ………………………………………………………………………………………………….
No. …………………………………………………………………………………………………………………...
Type ………………………………………………………………………………………………………………….
Maximum allowable working pressure …………………………………… Max. Design Temp. …………………………………...
Date of Installation …………………………………………………………………………………………………
First Inspection inside & ………………………………………………………………………………………….. Outside ………………………………………………………………………………………………………………
Feed Pipes Hydraulic Test to …………… kg/cm2 …………… By ……………… on ………………………. Remarks …………………………………………………………………………………………………………….

CALCULATIONS

Steam Pipes : ………………………………………………………………………………………………………

………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………..

CALCULATIONS

Steam Pipes : ………………………………………………………………………………………………………

………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………..

Steam Pipes: CALCULATIONS

………………………………………………………………………………………………………

………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………..

CALCULATIONS

………………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………..
INSPECTOR’S NOTE

………………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………………..

Form XV:R01 Dated: 07.08.2026

FORM-XV
[Regulation 358(3)]

INSPECTING AUTHORITY’S CERTIFICATE OF INSPECTION UNDER CONSTRUCTION We hereby certify that ……………… type, ……………… Economiser, consisting of ……………… sections and tubes to each section was constructed for a Design pressure of ……………… kg/cm2(g). Messrs ……………… under our supervision and inspected at various stages of construction by the Competent Person and that the construction and workmanship were satisfactory and in accordance with the standard conditions for the design and construction of Economiser laid down in Chapter-11 of the Indian Boiler Regulations, 2026.

Identification Mark on each section.

Branch Pipe on other pressure part.

Position of same.

The sections on completion were subjected to a water pressure of ……………… kg/cm2(g) for ten minutes in the presence of the Competent Person on ……………… and satisfactorily withstood the test in accordance with Regulation 361.

Samples of the material used in the constructions of the Economiser were tested in the presence of the Competent Person and were found to comply with the tests prescribed in Chapter-11 of the Indian Boiler Regulations, 2026.

We have satisfied ourselves that the construction and dimensions of the Economiser are as shown in the Maker’s Drawing No. ……………… signed by us and that the particulars entered in the maker’s certificate of manufacture in Form-XVI countersigned by us are correct to the best of our knowledge and belief.

Dated at …………… this …………… day of …………… 20……

Name and Signature of Inspecting Authority
Form XVI:R01Dated: 07.08.2026
FORM-XVI
[Regulation 358(4)]
WORKS ADDRESS
Constructor’s Certificate of Manufacture and Test

Columns reconstructed from the extracted text; check against the Gazette page.

Show original extracted text (diagnostic, not authoritative)
                                      Name and Signature of Inspecting Authority


Form XVI:R01                                                           Dated: 07.08.2026

                                            FORM-XVI
                                          [Regulation 358(4)]
                                        WORKS ADDRESS
                    Constructor’s Certificate of Manufacture and Test
1.DescriptionType of Economiser No. of tubes
No. of Sections
kg/cm2(g)
Intended working pressure
Total heating
Year of manufacture
Surface of tubes
Description
2.InspectingEconomiser constructed under supervision of ………………………………..
AuthoritySections hydraulically tested for ……… minutes and inspected after test by ……
3.Construction andDetails are in Drawing No. ………………………………
WorkmanshipAll castings are well finished free from external defects, porous places and blow-holes
and true to dimensions without warping.
Where chapters are used, there is satisfactory fusion with the metal.
Chapters properly tinned with metal free from lead.
All screw threads are of Whitworth form.
All components parts are manufactured to limit gauges to secure interchangeability throughout.

Table structure read from the Gazette PDF, page 942. Verification status as for the text above.

4.Economisers andPartsMaterialMakerCompetent Person’s
fittingsRemarks
Particulars ofHeaders Tubes and/or
material usedPipes Valve Chest Bolt

Table structure read from the Gazette PDF, page 942. Verification status as for the text above.

5.Part of EconomiserThickness inTensile strengthElongationGaugeBrand and
32ndslimits to tonslimits to %LengthNo.
Headers
Tubes
Bolts

Table structure read from the Gazette PDF, page 943. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
1. Description      Type of Economiser                    No. of tubes
                    No. of Sections                       kg/cm2(g)
                    Intended working pressure             Total heating
                    Year of manufacture                   Surface of tubes
                    Description

2. Inspecting       Economiser constructed under supervision of ………………………………..
    Authority       Sections hydraulically tested for ……… minutes and inspected after test by ……

3. Construction and Details are in Drawing No. ………………………………
    Workmanship All castings are well finished free from external defects, porous places and blow-holes
                           and true to dimensions without warping.
                           Where chapters are used, there is satisfactory fusion with the metal.
                           Chapters properly tinned with metal free from lead.
                           All screw threads are of Whitworth form.

                              All components parts are manufactured to limit gauges to secure interchangeability throughout.

4. Economisers and  Parts                      Material  Maker         Competent Person’s
    fittings                                                                 Remarks

Particulars of      Headers Tubes and/or
material used       Pipes Valve Chest Bolt


                       THICKNESS OF PARTS AND TENSILE TEST—LIMIT

5. Part of Economiser  Thickness in           Tensile strength  Elongation   Gauge                Brand and
                          32nds                limits to tons   limits to %  Length                   No.

Headers
Tubes
Bolts

Certified that the particulars entered herein are correct and that the parts and fittings mentioned above have been used in the construction and fittings of the Economiser.

The particulars shown against the various parts used are in accordance with the Maker’s certificates in our possession.

The design of the economiser in section and end view with principal parts fully dimensioned is that shown in Drawing No. ………… The Economiser has been designed and constructed to comply with the Indian Boiler Regulations for a Design pressure of ………… kg/cm2(g) at our Works above-mentioned and the sections satisfactorily withstood a water test of ………… kg/cm2(g) for ………… minutes on ………… day of …………20…… in the presence of our …………responsible representative whose signature is appended hereunder.

Signature of Engineer who witnessed the test Designation of Maker

Dated at ……… this ……… day of ……… 20…… Name and Signature of Inspecting Authority

Note: The drawing of the Economiser and Maker’s certificate of manufacture showing results of tests for tensile strength and elongation shall accompany this certificate and if the economiser has been built under the supervision of an Inspecting Authority their certificate in Form-XV shall accompany.

Form XVII:R01                                                                Dated: 07.08.2026
FORM-XVII
Counterfoil[Regulation 381(5)]
No.
No.Provisional Order under the Boilers Act, 2025
Name of the person or firm to which——————————————————————————
Provisional Order is granted.are hereby permitted to use the Economiser Ry. No. ………… and …………
Description of EconomiserEconomiser Rating ………… made by ………… and bearing Maker’s No.
Maker’s No.………… at a design pressure of ………… kg/cm2(g) /maximum
Ratingtemperature of ………… °C pending the issue or refusal of a certificate
Pressure permittedwithin six months from the date thereof after which period this order
Periodwill become void.
DateDated at ……… this ……… day of ……… 20……
InspectorInspector

Table structure read from the Gazette PDF, page 944. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
                                                        FORM-XVII

        Counterfoil                                     [Regulation 381(5)]

No.                                  No.
Name of the person or firm to which  Provisional Order under the Boilers Act, 2025
Provisional Order is granted.        ——————————————————————————
Description of Economiser            are hereby permitted to use the Economiser Ry. No. ………… and …………
Maker’s No.                          Economiser Rating ………… made by ………… and bearing Maker’s No.
                                     ………… at a design pressure of ………… kg/cm2(g) /maximum

Rating                               temperature of ………… °C pending the issue or refusal of a certificate

Pressure permitted                   within six months from the date thereof after which period this order
Period
Date                                 will become void.

                                     Dated at ……… this ……… day of ……… 20……
                     Inspector                                               Inspector

Form XVIII:R01                                Dated: 07.08.2026
                           FORM-XVIII
                          (Regulation 385)

                     BOILERS INSPECTION
                          DEPARTMENT
                         ECONOMISERS

                       REGISTRY NUMBER

    ____________________________________________________________________________________

                                                       MEMORANDUM OF INSPECTION
                                                                         OR

                                                              REGISTRATION BOOK

                                                    MISCELLANEOUS

District ………………………………………………………..
Owners ……………………………………………………….
Address of Factory ………………………………………….
Nearest Railway Station ……………………………………

Economiser Registered at ………………………………….on ………………………………………………
Register Book No …………………………………………...Page …………………………………………...
Registry Number …………………………………………….Verified on …………………………………….
Design Pressure ………………….Kg/cm2(g)………………………………………………
Economiser Rating ………………………………………….Inspection fee …………………………………
Registration Book filled at ………………………………….on ………………………………………………

Table structure read from the Gazette PDF, page 946. Verification status as for the text above.

Remarks on transfer etc. …………………………………..

PROVISIONAL ORDER AND CERTIFICATE RECORD

FeeDate ofDate ofCertificatePeriod ofDesignEconomiserRemarks and
paymentInspectionNo. andCertificatepressureRatingInspector’s initial
Date

Table structure read from the Gazette PDF, page 946. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Economiser Registered at ………………………………….                  on ………………………………………………
Register Book No …………………………………………...                     Page …………………………………………...
Registry Number …………………………………………….                       Verified on …………………………………….
Design Pressure ………………….                                 Kg/cm2(g)………………………………………………
Economiser Rating ………………………………………….                      Inspection fee …………………………………
Registration Book filled at ………………………………….               on ………………………………………………
Remarks on transfer etc. …………………………………..

                  PROVISIONAL ORDER AND CERTIFICATE RECORD

Fee Date of        Date of    Certificate   Period of     Design   Economiser    Remarks and
         payment  Inspection   No. and      Certificate  pressure     Rating   Inspector’s initial
Original extracted text of the table above, continued (diagnostic)
                                 Date

Type of Economiser ………………………………………...                    length …………………… Dia. ………………

Maker …………………………………………………………                             Thickness ……………………………………..
Intended Working Pressure ……………………………….                  Thickness ……………………………………..

Place and year of make …………………………………….
Maker’s No …………………………………………………..

Description of Economiser …………………………………

No. of tubes ………………………………………………….
Thickness …………………………………………………….

Internal dimensions …………………………………………
No. of Headers ………………………………………………
Thickness of Headers ………………………………………
Length of Top Branch Pipe ………………………………...
Length of Bottom Branch Pipe …………………………….
Dimensions of cap openings ………………………………
Diameter of cap bolts ……………………………………….

Original extracted text of the table above, continued (diagnostic)
                     MOUNTINGS

No.                           Diameter Type               Position Material

Relief Valve ………………………………………………….

Stop Valve …………………………………………………...
Blow Down …………………………………………………..
Thermometers ……………………………………………….
Pressure Gauge …………………………………………….

Additional Fittings …………………………………………….

Name of Maker MAKER’S CERTIFICATE

Maker’s Hydraulic Test Pressure …………………………………………………………………… Maker’s Drawing No.

Original extracted text of the table above, continued (diagnostic)
Name of Inspecting Authority               ……………………………………………………………………
Name of Maker of Material                  ……………………………………………………………………
                                           ……………………………………………………………………
                                           ……………………………………………………………………

                                        Tubes               ………………………………

Process                                 Headers             …………………………………………………..

                                        Bolts               …………………………………

                                                            Test Results

Tubes                                   T                   E

Headers                                                     T             E

Pipes                                                       T             E

Bolts                                                       T

                                                            % Sulphur

                                                            % Phosphorus

                                                            Maker’s Identification Mark

                                                            Position


                                       CALCULATIONS

                                         HEADERS

                                            TUBES
                                       BRANCH PIPES

                                                 BOLTS

                                       HEATING SURFACE

Total Heating Surface ………………………………………

Economiser Ratings ………………………………………..

Calculations made by ……………………………………… submitted on ………………………………….. on ………………………………………………
Calculations checked by …………………………………… Kg/cm2(g). …………………………………………….. Maximum Allowable working pressure …………………..

Chief Inspector’s remarks and signature …………………

INSPECTOR’S NOTES

Form XIX:R01 Dated: 07.08.2026 FORM-XIX
(Regulation 387)
CERTIFICATE FOR USE OF AN ECONOMISER

Registry Number of EconomiserType
No. of tubes
Number of Headers
Economiser RatingPlace and year of manufacture
Name of owner
Situation of Economiser
Repairs
Remarks
.
Hydraulically tested onto kg/cm2(g)

Table structure read from the Gazette PDF, page 949. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Registry Number of Economiser  Type

No. of tubes
Number of Headers

Economiser Rating              Place and year of manufacture
Name of owner

Situation of Economiser

Repairs

Remarks . kg/cm2(g) Hydraulically tested on to

I hereby certify that the above described Economiser is permitted by me/Chief Inspector under the provisions of Section 12/13 of the Boilers Act, 2025 to be worked at a maximum pressure of ……………kg/cm2(g) /maximum temperature of °F or the period from ……………to …………….

This loading of the safety relief valve is not to exceed, …………… kg/cm2(g).

Fee Rs. …………… paid on ……………

Dated at ……………

This ………… day of ………… 20……,

Name and signature of
Competent Person

CONDITIONS

(REVERSE OF FORM XIX)

(1)No structural alteration, addition or renewal shall be made to the Economiser without a written permission from the Chief Inspector.

(2)This certificate shall cease to be in force—

(a)on the expiry of the period for which it was granted, or

(b)when any accident occurs to the Economiser, or

(c)when any structural alteration, addition or renewal is made in or to the Economiser, or

(d)save as provided in section 17 of the Act, when any structural alteration, addition or renewal is made in or to the Economiser; or

(e)on the communication to the owner of the Economiser of an order of the Chief Inspector or Inspector prohibiting its use on the ground that it is in a dangerous condition.

(3)The Economiser shall not be used at a pressure greater than the pressure/temperature entered in the certificate as Maximum allowable working pressure /temperature not with the relief valve set to pressure/temperature exceeding such Maximum allowable working pressure /temperature.

(4)The Economiser shall not be used otherwise than in a condition which the owner reasonably believes to be compatible with safe working.

N.B.: Details regarding this Economiser are recorded in a Registration Book No. ………… of which a copy may be obtained on payment on application to the Chief Inspector.

Form XX:R00 Dated: 07.08.2026

FORM-XX

Qualified Boiler Welder’s Certification Continuity Form

(as per Regulations 517 and 527(3), to be submitted along with renewal request)

Issued under

THE INDIAN BOILER REGULATIONS, 2026

Name of the welder:
Father’s Name:
Date of Birth:

Table structure read from the Gazette PDF, page 951. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Name of the welder          :

Father’s Name               :

Date of Birth               :

Organisation Name & Address :

IBR qualification certificate No : Validity:

Qualified In : Carbon Steel - Plate / Pipe & Tube (M number grouping)

Alloy Steel - Plate / Pipe & Tube (M number grouping)

Process:

Consumable U number:

Continuity details (through a sample detail for reference) :

a. On completion of 6 months a. Welded Part Name:

b. Date :

b. On completion of 12 months a. Welded Joint Name:

b. Date :

c. On completion of 18 months a. Welded Part Name:

b. Date :

d. On completion of 24 months a. Welded Part Name:

b. Date :

Submitted by

     Signature and Seal of the employer with date        Approved by
     Certificate extended up to ______________

                                                   (Name and Signature of Competent Authority)
                                                                                            Date & Seal


Form XXI:R01                                                   Dated: 07.08.2026

                   FORM-XXI

                   (Regulation 540)

Record of Welder’s Qualifications/Requalification Tests (Indian Boiler Regulations, 2026) Place of Test ………………

Date ………………………...

Name of Welder ……………………………………………………………………………………………………

Father’s name ………………………………………………………………………………………………………

Date of Birth ………………………………………………………………………………………………………..

Address ……………………………………………………………………………………………………………..

..………………………………………………………………………………………………………………………

Service of experience on Gas/Electric Arc ……………………………… years……………………………....

Signature of Welder ………………………………………………………..………………………………………

Names and addresses of the firms where trained ……………………………………………………………...

..………………………………………………………………………………………………………………………

Tested on ……………………………………………………………………………………... (Plate, pipe, tube)

Gas of electric A.C./D.C. ………………………………………………….………………………………………

Kind of test ……………………………………….……………………………………… (Groove/Fillet/Branch)

Position.…………………………………………………………………………………………………………….

Thickness of material used ………………………………………………………………………………………..

Diameter and thickness of pipe, branch or tubes used ……………………………………………………….

Marks
A. ProcedureMaximumAwarded
1. Preparation of specimen3
2. Size & Grade of electrode or filler rod2
3. Number of runs and manipulation of control5
B. Visual Inspection
4. Root penetration10
5. Freedom from undercut5
6. Disposition of runs2
7. Uniformity of surface1
8. Shape of profile1
9. Smoothness of joints2
10. Freedom from cavities & slags5
11. Dimensions of weld deposit1
12. Quality of weld metal (Overheating, surface cracks,spongy surface etc.)3
C. Physical Test
13. Face bend test10
14. Root bend test20
D. Etch Test
15. Disposition of runs2
16. Degree of fusion5

Table structure read from the Gazette PDF, page 954. Verification status as for the text above.

RESULTS OF OBSERVATIONS

17. Root Penetration11
18. Slags inclusions and porosity5
E. Fractured Surface
19. Quality of weld metal (Excessive oxidation, carburisation, overheating, roughness,7
porosity, appearance).100

Table structure read from the Gazette PDF, page 955. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Quality of base material and electrode or filler rod ……………………………………………………………..

                                   RESULTS OF OBSERVATIONS

                                                                              Marks

                                               Maximum                               Awarded

A. Procedure                                        3
1. Preparation of specimen                          2
2. Size & Grade of electrode or filler rod          5
3. Number of runs and manipulation of control

B. Visual Inspection

4. Root penetration                                                                  10

5. Freedom from undercut                                                             5

6. Disposition of runs                                                               2

7. Uniformity of surface                                                             1

8. Shape of profile                                                                  1

9. Smoothness of joints                                                              2

10. Freedom from cavities & slags                                                    5

11. Dimensions of weld deposit                                                       1

12. Quality of weld metal (Overheating, surface cracks, spongy surface etc.)         3

C. Physical Test

13. Face bend test                                                                   10

14. Root bend test                                                                   20

D. Etch Test

15. Disposition of runs                                                              2

16. Degree of fusion                                                                 5


17. Root Penetration                                                                    11

18. Slags inclusions and porosity                                                       5

E. Fractured Surface

19. Quality of weld metal (Excessive oxidation, carburisation, overheating, roughness,  7

porosity, appearance).

                                                                                        100

Name and Signature of Competent Authority

Observation on radiographic examination (if conducted) ……………………………………………………..

Marks awarded …………………………………………………………………………………………………. %

Results of Oral or Written examination ………………………………………………………………………….

Marks awarded …………………………………………………………………………………………………. %

GENERAL REMARKS OF COMPETENT AUTHORITY ………………………………………………………

TYPE AND CLASS OF WELDING QUALIFIED …………………………… in Gas or Electric Arc welding.

PERIOD OF VALIDITY OF CERTIFICATE ……………………………… From …………… To ……………

Place ……………

Date ……………. Name and signature of Competent Authority

Form XXII:R01 Dated: 07.08.2026

FORM-XXII

CERTIFICATE OF MANUFACTURE AND TEST FOR SMALL INDUSTRIAL BOILERS

[Regulation 555(2)]

1. Maker’s Name ……………………… Year of Make …………………………………………………….

2. Manufactured for ………………………………………………………………………………………….

3. Location of Installation …………………………………………………………………………………….

4. Boiler Identification …………………………… Competent Person’s stamp …………………………

5. Drawing No. …………………………………… Alteration No. …………………………………………

6. Design pressure (kg/Cm2(g)) …………………………

7. Size of Boiler

Original extracted text of the table above, continued (diagnostic)
Length (Meters)         Width (Meters)           Height (Meters)     Diameter (Meters)

8. Material Specification (As applicable)

CHEMICAL COMPOSITIONMECHANICAL PROPERTIES
CSi
Mn
P
SYS
U.T.S.
%
EL.

Table structure read from the Gazette PDF, page 956. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
       CHEMICAL COMPOSITION                MECHANICAL PROPERTIES

C      Si            Mn P S                Y S U.T.S. %             EL.

Shell ………………………………………………………………………………………………………………..

Furnace …………………………………………………………………………………………………………..
Tube Plates ………………………………………………………………………………………………………..
Flange ……………………………………………………………………………………………………………..
Boiler Tubes/Pipe/Pads Details ………………………………………………………………………

Diameter Thickness MaterialCHEMICAL COMPOSITIONMECHANICAL PROPERTIES
SpecificationCSi
Mn
P
S
YS
U.T.S.
%
EL.

Table structure read from the Gazette PDF, page 956. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Diameter Thickness Material                CHEMICAL COMPOSITION        MECHANICAL PROPERTIES
Specification
                                 C         Si  Mn P S            Y S U.T.S. % EL.

Tube ……………………………………………………………………………………………………………

Pipes …………………………………………………………………………………………………………..

Pads ……………………………………………………………………………………………………………

9. Volumetric Capacity

10. Heating Surface (Sq. Metres)

11. Nozzle connection

(a)Steam Outlet ……………………………………………………………………………

Original extracted text of the table above, continued (diagnostic)
(No.           Size                  and Type of Nozzles)

(b)Safety Valve …………………………………………………………………………….

Original extracted text of the table above, continued (diagnostic)
(No.           Size                  and Type of Nozzles)

(c)Auxiliary (Air vent) …………………………………………………………………..

Original extracted text of the table above, continued (diagnostic)
(No.           Size                  and Type of Nozzles)

(d)Blow off Valve ……………………………………………………………………………

Original extracted text of the table above, continued (diagnostic)
(No.           Size                  and Type of Nozzles)

(e)Feed Valve ……………………………………………………………………………

Original extracted text of the table above, continued (diagnostic)
(No.           Size                  and Type of Nozzles)

12. Shop Hydro Test Pressure (Kg. Cm2) ……………………… Date …………………………………..

Name and Signature of Manufacturer

We certify that the above boiler constructed under our supervision and inspected at various stages of construction by the Competent Person and that the construction, workmanship were satisfactory as per Indian Boiler Regulations, 2026.

Name and Signature Competent Person Name and Signature of Inspecting Authority

Dated ………… this ………… Day of ………… 20……

Form XXIII:R00 Dated: 07.08.2026

FORM-XXIII

CERTIFICATE OF MANUFACTURE AND TEST FOR SMALL SOLAR BOILERS
[Regulation 596(3)]

1. Maker’s Name ……………………… Year of Make …………………………………………………….

2. Manufactured for ………………………………………………………………………………………….

3. Location of Installation …………………………………………………………………………………….

4. Boiler Identification …………………………… Competent Person’s stamp …………………………

5. Drawing No. …………………………………… Alteration No. …………………………………………

6. Design pressure (kg/cm2 (g)) …………………………

7. Heating Surface (Sq. Metres) ………………………..

8. Material Specification (As applicable)

9. Volumetric Capacity (in liters) ………………….

10. Safety Valve (No……………….. Size…………………)

11. Hydro Test Pressure (Kg/cm2 (g)) ……………………… Date …………………………………..

Manufacturer
(Name, Signature & Stamp)

We certify that the above boiler was constructed under our supervision and inspected at various stages of construction as specified in chapter-17 by the Competent Person and that the construction, workmanship were satisfactory as per Indian Boiler Regulations, 2026.

Competent Person Inspecting Authority (Name, Signature & Stamp) (Name, Signature & Stamp)

Dated ………… this ………… Day of ………… 20……