BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 1 · General Requirements, Registration, Recognition and Competent Persons

Regulation 17. Application for recognition

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 499–500

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

17. Application for recognition.─(1) An application for recognition as Competent Authority, Inspecting Authority, Well-known Material Testing Laboratory, Well-known Steel Maker, Well-known Foundry or Forge, Well-known Tube or Pipe Maker and Well-known Remnant Life Assessment Organisation, in one of the areas of activity in which they are engaged, shall be made by a firm to the Secretary, Central Boilers Board, along with specified fee.

(2)An application under sub-regulation (1) shall be made in duly filled in Forms VI (Part-A) to VI (Part-G) applicable to the area of activity and may also be submitted through electronic means .

(3)Any firm applying for recognition as Competent Authority and Inspecting Authority under sub-regulation

(1)shall have a minimum experience of two years in the area of activity for which recognition is applied for and for recognition as Well-known Material Testing Laboratory or Well-known Steel Maker or Well-Known Foundry or Forge, Well-Known Tube or Pipe Maker or Well-Known Remnant Life Assessment Organisation, experience of two years shall be required under these regulations.

(4)In case of firms in foreign countries seeking recognition as Competent Authority or Well-Known Steel Maker, Well Known Pipe or Tube Maker, Well Known Foundry or Forge, a fee of ten thousand US dollars shall be deposited along with the completed form to meet the expenses of the visit of the Evaluation Committee specified under regulation 23:

Provided that where the firm has more than one manufacturing unit in the same country, an additional fee at the rate of two thousand US dollars per additional unit shall be deposited.

(5)In case of firms in foreign countries seeking recognition as Inspecting Authority, a fee of one thousand US dollars shall be deposited along with the completed forms.

(6)In case of firms in India seeking recognition under sub-regulation (1), a fee of rupees fifteen thousand shall be deposited along with the completed form and for renewal of recognition, a fee of rupees ten thousand shall be deposited along with the completed form.

(7)The Evaluation Committee shall carry out the evaluation of the manufacturing works of the firms within ninety days of receipt of the fees in case of manufacturing works in foreign countries and within sixty days in case of manufacturing works in India.

(8)The Appraisal Committee or Evaluation Committee, as the case may be, shall also evaluate the performance of the firm applying for recognition as Competent Authority or Inspecting Authority within sixty days of receipt of fee.

(9)The certificate of recognition shall be valid for a period of five years from the date of visit of the plant by the Evaluation Committee or meeting of the Appraisal Committee, as the case may be and in case of renewal of the recognition, if an application is received for renewal along with the required fee, firm’s certificate of recognition may be renewed after following the procedure specified under these regulations and the certificate shall be issued for a further period of five years.

Referenced provisions

Reg. 23

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 17 covers how a firm applies to the Secretary, Central Boilers Board for recognition as a Competent Authority, Inspecting Authority, Well-known Material Testing Laboratory, Well-known Steel Maker, Well-known Foundry or Forge, Well-known Tube or Pipe Maker or Well-known Remnant Life Assessment Organisation. It sets the forms, experience, fees, evaluation time limits and validity.

Key points

  • (1)–(2) Apply in the area of activity the firm is engaged in, with the specified fee, using the applicable Forms VI (Part-A) to VI (Part-G). Electronic submission is allowed.
  • (3) A minimum of two years' experience in the area of activity is required for every category.
  • (4) Foreign firms seeking recognition as Competent Authority, Well-Known Steel Maker, Pipe or Tube Maker, or Foundry or Forge deposit ten thousand US dollars to meet the expenses of the Evaluation Committee visit, plus two thousand US dollars for each additional manufacturing unit in the same country.
  • (5) Foreign firms seeking recognition as Inspecting Authority deposit one thousand US dollars.
  • (6) Firms in India deposit rupees fifteen thousand, and rupees ten thousand for renewal.
  • (7) The Evaluation Committee evaluates the manufacturing works within ninety days of receiving the fees for works abroad, and within sixty days for works in India.
  • (8) For Competent Authority or Inspecting Authority applicants, the Appraisal Committee or Evaluation Committee evaluates performance within sixty days of receipt of fee.
  • (9) Recognition is valid for five years from the Evaluation Committee's plant visit or the Appraisal Committee meeting. On renewal, with application and fee, it may be renewed for a further five years.

See regulation 23 and regulation 24 for the committees.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
623Application100%Chapter XV (DPIIT scan), image 1

Amendment history of the candidate IBR 1950 regulation: Reg. 623 (2 amendments)

IBR 1950 regulation 623 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 623 page for its amendments.

Reg. 623, Reg. 624, Reg. 625
FEED WATER FOR BOILER

Scope

a)

This chapter lays down specifications for feed water and boiler water for low and medium pressure boilers (boilers operating up to 60 kg/cm2).
b) For boilers operating at pressures higher than 60 kg/cm2, better quality of water to IS:10496-1983 may be adopted.


Reg. 624

Requirements

The water shall comply with the requirements given in Table 1 when tested by the methods prescribed in col. 6 and 7 of the table.


Reg. 625

Sampling

Sampling shall be done following general directions given in 2 of IS:3025-1964*. In particular, the following points shall be observed :

a) It is necessary that a stainless steel or monel metal coil is fitted on the sampling cock so that the temperature of the water sample will be well below the boiling point at atmospheric pressure and there is no risk of aeration and concentration due to flashing into steam; and
b) Samples of feed water shall be collected from the delivery of the boiler feed pump, samples of boiler water from the top drum, and samples of condensate from the delivery of the condensate extraction pump.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
499–500
PDF page index
499–500 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 0e70f21701abf9f1
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 17, Regulation 17, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.499–500. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.