Indian Boiler Regulations, 2026 · Chapter 1 · General Requirements, Registration, Recognition and Competent Persons
Regulation 27. Procuring of materials
Not yet checked against the official Gazette; verify before relying on it.
27. Procuring of materials. ─ (1) Where procuring materials directly from mills is not feasible due to small quantity, the following method shall be adopted, namely:-
(a)materials fully identifiable, supported by a materials test report by material manufacturer but not covered by a form under these regulations,─
(i)when a material is received with complete identification marks applied by the mill and supported by a materials test report, the manufacturer of boiler, boiler component, and spares shall demonstrate to the satisfaction of the Inspecting Authority that all requirements of the material specification specified under these regulations have been met;
(ii)the materials test report issued by materials manufacturer shall be presented to the Inspecting Authority for verification;
(iii)any additional tests as determined by the Inspecting Authority shall be conducted in a test house and results documented;
(iv)Form-IV(Part-B) shall be prepared with specification, size, quantity, reported test results and jointly signed by manufacturer of boiler, boiler component or spares and the Inspecting Authority;
(b)materials fully identifiable with mill markings for a production lot but not supported by materials test reports and forms under these regulations,─
(i)the manufacturer of boiler, boiler components or spares shall present such materials to the Inspecting Authority for as marked by the mill. Shipping document or purchase order or as the case may be, drawing are also to be presented to establish required specification of materials;
(ii)testing of materials shall be conducted as per materials specification and additional requirements of these regulations, if any;
(iii)number of samples for tests shall be determined by the Inspecting Authority but not less than 10% of the quantity under consideration;
(iv)test results are to be recorded in Form-IV(Part-B), signed by manufacturer and the Inspecting Authority;
(v)plates or sheets qualified in the manner as provided above shall not be permitted for use in boiler shell or drum construction;
In short
Regulation 27 sets the method to follow when materials cannot be procured directly from mills because the quantity is small.
Key points
- (1)(a) Fully identifiable material with a mill test report, but no form under these regulations. The boiler, component or spares manufacturer must show the Inspecting Authority that all specification requirements are met. The test report is presented for verification, any additional tests the Inspecting Authority requires are done in a test house, and Form-IV (Part-B) is prepared and jointly signed.
- (1)(b) Material with mill markings for a production lot but no test reports or forms. The material is presented as marked, with shipping documents, purchase order or drawings to establish the specification. It is tested to the material specification and these regulations. The Inspecting Authority decides the number of samples, but not less than 10% of the quantity. Results go in Form-IV (Part-B), signed by the manufacturer and the Inspecting Authority.
Watch out
- Plates or sheets qualified under (1)(b) may not be used in boiler shell or drum construction.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 626 | Materials | 100% | Chapter XV (DPIIT scan), image 1 |
Amendment history of the candidate IBR 1950 regulation: Reg. 626 (1 amendment)
IBR 1950 regulation 626 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 626 page for its amendments.
| Reg. 626 FEED WATER FOR BOILER | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tests shall be carried out as prescribed in the appropriate clauses of IS : 3025-1964* and IS : 3550-1965! as indicated against the characteristics in Table 1.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 27, Regulation 27, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.510–511. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.