Indian Boiler Regulations, 2026 · Chapter 1 · General Requirements, Registration, Recognition and Competent Persons

Regulation 8. Certificates, drawings and specifications

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 496–498

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

8. Certificates, drawings and specifications. ─ An application for registration of a boiler under sub-section (1) of section 12 and clause (c) of sub-section (1) of section 19 of the Act, the following certificates and drawings or specifications shall be furnished to the Chief Inspector, the certificates and drawings or specifications may also be submitted through electronic means along with digital signatures, namely:-

(a)(i) A certificate in Form-I(Part-B) or Form-I(Part-C), as the case may be, from an Inspecting Authority, certifying that the material was tested and the boiler was built under their supervision in respect of the inspection of the boiler during construction and the hydraulic test applied on completion.

(ii)In case of a boiler which is to be assembled only at site, requirement of the hydraulic test on a completely assembled boiler by the Inspecting Authority shall not apply provided that the individual parts of such boiler have been hydraulically tested and certified by the Inspecting Authority separately as required under these regulations.

(iii)In case of waste heat boilers, a certificate in Form-I(Part-B) or Form-I(Part-C) as applicable may be issued by the Inspecting Authority of the State, where the boiler is installed, after completion of construction at site on the strength of the certificates supplied to him in prescribed forms by the owners for the individual components which are required to be furnished for registration of a boiler under this regulation, shall be submitted to the Inspecting Authority of the State, where the boiler is installed, before the commencement of construction of such boiler at the site.

(iv)The Inspecting Authority may grant a certificate in Form-I(Part-D) in lieu of Form-I(Part-B) or Form-I(Part-C), for boilers for which variations from the standard conditions in respect of material, design and construction features permitted by the Board or the Inspecting Authority.

(v)The Inspecting Authority shall issue certificate in Form-I(Part-E) after completion of boiler erection and satisfactory hydrostatic test at the assembly site.

(b)A certificate in Form-IV(Part-A) of manufacture and test signed by the maker of the boiler or its representative, containing a description of the boiler, its principal dimensions, particulars of the kind of material used in its construction, the thickness of all plates, particulars of any departure from ordinary practice in making the shell, such as, solid rolling or welding, the hydraulic test to which the boiler was subjected, the intended working pressure, the area of heating surface, the maximum continuous evaporative capacity, the year and place of manufacture, and the works number of the boiler.

Note: The Inspecting Authority may approve a modified form of certificate omitting items which do not pertain to a particular boiler.

(c)(i) In case of shop assembled boilers, drawings to an appropriate scale showing the principal dimensions, sections, maker’s number, position of Inspecting Authority’s stamp, bill of material, welding details and design parameters.

(ii)In case of site assembled boilers, drawings showing general and pressure parts arrangement, drawings of coils, panels, headers and drums with details of principal dimensions, bill of materials and design parameters. Manufacturer may use appropriate scale for drawings and in case of identical or similar multiple sub-assemblies, drawings for only one sub-assembly may be submitted.

(d)(i) A certificate in Form-V(Part-A) from the steel maker and a certificate from the maker of the plates or bars, of the nature referred to in regulations 45 and 46 respectively and the certificate from the maker of the plates, or bars, shall show the charge numbers, the plate or bar numbers and the number and dimensions of the various plates tested, their chemical analysis, their ultimate tensile strength in kilograms per square millimetre of section, the percentage of elongation and the length on which measured, the number, kind and result of bend or other tests made and the date of tests .

(ii)In case any question arises in respect of the fitness of the boilers for the working pressure approved by the Inspecting Authority within a period of three years from the date of their registration, the owner shall if requested by the Chief Inspector obtain and furnish the original documents specified in the said clauses:

Provided that in respect of the steel made and tested by Well-known steel makers recognised by the Central Boilers Board in the manner laid down in regulations 17 to 23, a certificate of Well-known steel maker in Form-V(Part-A) shall be accepted in lieu of a certificate from an Inspection Authority.

(iii)In case where the original certificate from well-known steel makers in Form-V(Part-A) is not produceable, owing to such certificate containing details of plates used for other purposes also, an extract from the original certificate duly signed by the makers of the boiler and countersigned by the Inspecting Authority shall be accepted in lieu of the certificate in Form-V(Part-A), provided all information required in Form-V(Part-A) are furnished in the extract.

(iv)The extract of all test certificates of materials used in boiler and boiler components in Form-V(Part-B) along with Form-IV(Part-A).

(v)In the case of fusion welded drums, diagram of weld repairs and temperature charts of heat-treatment shall also be furnished.

(vi)Alloy steel materials used in creep range in furnace or super-heater zone─ (A) two numbers of 1000 hour stress rupture tests shall be carried out at 50°C above the maximum service temperature for each grade of alloy steel and Nickel alloys; when used in furnace or in super heater zone;

(B) the stress to cause rupture in 1000 hours at the above temperatures may be taken from the master curve corresponding to - 20 percent line at this stress, a minimum rupture life of 1000 hours is expected and both the samples shall pass 1000 hour tests at the above stress and temperature;

(C) the short-term stress rupture tests for 1000 hours as mentioned above are carried out by National Metallurgical Laboratory or well known steel makers or any other Material Testing Laboratory recognised by the Central Boilers Board for creep testing and collecting elevated temperature data of alloy steel produced indigenously or from a nationally recognised or accredited testing laboratory for creep testing in that country of manufacture for alloy steel produced outside India, for the purpose of checking whether the steel is up to the specification and also to ensure that the steel is capable of meeting the long-term rupture stress values or maximum allowable stress values given in American Society of Mechanical Engineers (ASME) or British Standards (BS) or European Standards (EN) Code, as the case may be, and a certificate is given to this effect; alternately the testing can also be done in any other laboratory if the tests are witnessed by a Competent Person working with a recognised Inspecting Authority;

(D) these samples may be selected at random by the Competent Person and may be in the form of semi-finished products, say, forged bars of about 25 mm2, which shall undergo heat treatment as prescribed by the relevant specifications.

(vii)For such boilers having a capacity of 20 tons per hour and above which are required to be assembled at site, the mountings may be supplied separately and all boilers of capacity less than 20 tons per hour shall carry all the mountings or fittings certificates in respective forms with details mentioned in Form-IV(Part-A), issued at the time of manufacture of boilers.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 8 lists the certificates, drawings and specifications that must be furnished to the Chief Inspector with an application to register a boiler under section 12(1) and section 19(1)(c) of the Act. They may also be submitted electronically with digital signatures.

Key points

  • (a) Inspecting Authority certificates. Form-I (Part-B) or (Part-C) certifying that material was tested and the boiler built under its supervision, including the hydraulic test on completion.
  • For a boiler assembled only at site, the Inspecting Authority's hydraulic test on the completely assembled boiler does not apply if the individual parts were hydraulically tested and certified separately. This exception concerns the maker's certificate only; it does not remove the hydraulic tests required elsewhere in the regulations after erection.
  • For waste heat boilers, the Inspecting Authority of the State where the boiler is installed may issue the certificate after construction at site, based on component certificates supplied by the owner. Those certificates are submitted before construction at site starts.
  • Form-I (Part-D) may be granted instead where variations from the standard conditions were permitted by the Board or the Inspecting Authority.
  • Form-I (Part-E) is issued after erection and a satisfactory hydrostatic test at the assembly site.
  • (b) Maker's certificate in Form-IV (Part-A): description, principal dimensions, materials, plate thicknesses, departures from ordinary practice, hydraulic test, intended working pressure, heating surface, maximum continuous evaporative capacity, year and place of make and works number. The Inspecting Authority may approve a modified form omitting items that do not apply.
  • (c) Drawings. Shop assembled boilers: drawings to an appropriate scale with principal dimensions, sections, maker's number, stamp position, bill of material, welding details and design parameters. Site assembled boilers: general and pressure parts arrangement, plus coils, panels, headers and drums. For identical or similar multiple sub-assemblies, drawings of only one may be submitted.
  • (d) Material certificates. Form-V (Part-A) from the steel maker and a certificate from the plate or bar maker (see regulation 45 and regulation 46), showing charge and plate numbers, chemical analysis, tensile strength, elongation and bend test results. Also the Form-V (Part-B) extract of all material test certificates and, for fusion welded drums, weld repair diagrams and heat-treatment temperature charts.

Watch out

  • If the fitness of a boiler for its approved working pressure is questioned within three years of registration, the owner must, if the Chief Inspector asks, obtain and furnish the original documents.
  • A Form-V (Part-A) certificate from a Well-known steel maker recognised in the manner of regulations 17 to 23 is accepted in lieu of an Inspection Authority certificate. If the original cannot be produced because it covers other plates too, a signed and countersigned extract with all the Form-V (Part-A) information is accepted.
  • Alloy steel in the creep range in the furnace or super-heater zone: two 1000 hour stress rupture tests at 50°C above the maximum service temperature for each grade of alloy steel and Nickel alloys, done by a recognised laboratory or witnessed by a Competent Person. Check the Official text for how the test stress is taken and how samples are selected.
  • Boilers of 20 tons per hour and above assembled at site may have mountings supplied separately. Boilers below 20 tons per hour must carry all mountings or fittings certificates.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
496–498
PDF page index
496–498 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash f7347da200365a05
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 8, Regulation 8, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.496–498. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.