12. Registration.—(1) The owner of a boiler which is not registered under the provisions of this Act shall make an application to the Inspector in such form, along with such drawings, specification, certificate and other documents as may be specified by regulations, to have the boiler registered.
(2)Every application for registration under sub-section (1) shall be accompanied by such fee as may be prescribed by the State Government.
(3)On receipt of an application under sub-section (1), the Inspector shall fix a date, within thirty days or such shorter period as may be prescribed by the State Government, from the date of the receipt of the application, for examination of the boiler and shall give the owner thereof not less than ten days’ notice of the date so fixed.
(4)On the date so fixed under sub-section (3), the Inspector shall inspect the boiler with a view to satisfying himself that the boiler has not suffered any damage during its transit from the place of manufacture to the site of erection and forward a report of the inspection along with the documents to the Chief Inspector within seven days.
(5)The Chief Inspector, on receipt of the report under sub-section (4), may—
(a)register the boiler and assign a register number thereto either forthwith or after satisfying himself that any structural alteration, addition or renewal which he may deem necessary has been made in or to the boiler or any steam-pipe attached thereto; or
(b)refuse to register the boiler:
Provided that where the Chief Inspector refuses to register a boiler, he shall forthwith communicate his refusal to the owner of the boiler together with the reasons therefor.
(6)The Chief Inspector shall, on registration of the boiler, order the grant of a certificate to the owner in such form as may be specified by regulations, authorising the use of the boiler for a period not exceeding twelve months, at a pressure not exceeding such maximum pressure as he thinks fit:
Provided that where an economiser or an unfired boiler forms an integral part of such processing plant in which steam is generated solely by the use of oil, asphalt or bitumen as a heating medium, the Chief Inspector may authorise the use of such boiler for a period not exceeding twenty-four months.
(7)The Inspector shall forthwith convey to the owner of the boiler the order of the Chief Inspector and shall in accordance therewith, grant a certificate to the owner of which such grant has been ordered.
(8)On receipt of the boiler registration certificate, the owner shall cause the register number to be permanently marked on the boiler in such manner and within such time as may be specified by regulations.
(9)The transfer of boilers from one place to another within a State shall be reported in such manner as may be prescribed by the State Government.
Numbers in the form 21[ are India Code footnote markers that record amendments. Source: India Code, Act 12 of 2025, PDF p.10.
Commentary
Section 12 sets out how an unregistered boiler is registered.
- Application (12(1)–(2)): the owner applies to the Inspector with the drawings, specification, certificate and documents specified by regulations, and the fee prescribed by the State Government.
- Date of examination (12(3)): the Inspector fixes a date within thirty days of receipt (or a shorter period prescribed by the State Government), giving the owner not less than ten days' notice.
- Inspection (12(4)): the Inspector checks that the boiler has not been damaged in transit from the place of manufacture to the site of erection, and reports to the Chief Inspector with the documents within seven days.
- Decision (12(5)): the Chief Inspector registers the boiler and assigns a register number (immediately, or after any structural alteration, addition or renewal he considers necessary), or refuses, communicating the refusal and reasons forthwith.
- Certificate (12(6)–(7)): use is authorised for not more than twelve months at a maximum pressure the Chief Inspector thinks fit. Under the proviso, an economiser or unfired boiler forming an integral part of a processing plant heated solely by oil, asphalt or bitumen may be authorised for up to twenty-four months.
- Marking (12(8)): the owner must permanently mark the register number on the boiler as specified by regulations.
- Intra-State moves (12(9)): reported as prescribed by the State Government.
While the Chief Inspector's order is awaited, the Inspector may grant a provisional order under section 14.
Compared with the 1923 Act
The 1923 Act's s.7 (candidate predecessor) followed the same steps but had no provision like 12(9) on transfers within a State.
Predecessor in the Boilers Act, 1923: s.7. Registration follows old s.7, split into nine sub-sections, with fee, form and marking assigned to rules or regulations.
- Application form, drawings, specifications and documents are specified by regulations; the fee and any shorter examination period are prescribed by the State Government.
- Time limits unchanged: examination within thirty days, not less than ten days' notice, report to Chief Inspector within seven days; certificate up to twelve months.
- The old phrase that maximum pressure must be 'in accordance with the regulations' is not repeated in s.12(6).
- The twenty-four-month proviso now reads 'where an economiser or an unfired boiler forms an integral part of such processing plant'; the old proviso listed an economiser separately.
- Register number marking moves to s.12(8), with manner and time specified by regulations.
- New s.12(9): transfers within a State reported as prescribed by the State Government.
Compare the two official texts before relying on this summary.
Candidate 1923 match found automatically (99% similar), not yet confirmed by a reviewer.
| 1923 candidate | Heading | Heading sim. | Text sim. |
|---|---|---|---|
| s.7 | Registration | 100% | 97% |
| s.9 | Provisional orders | 47% | 76% |
| s.2 | Definitions | 52% | 61% |
Word-level comparison with 1923 s.7 (candidate)
struck = only in 1923 text · highlighted = only in 2025 text. India Code footnote markers are removed before comparing.