The Boilers Act, 2025 · Chapter IV
Section 25. Appeal to Central Government
Not yet checked against the official India Code text; verify before relying on it.
25. Appeal to Central Government.—(1) Any person aggrieved by an order made under section 24 by the Chief Inspector—
(a)refusing to register a boiler or to grant or renew a certificate in respect of a boiler;
(b)refusing to grant a certificate having validity for the full period applied for;
(c)refusing to grant a certificate authorising the use of a boiler at the maximum desired pressure;
(d)withdrawing or revoking a certificate or provisional order;
(e)reducing the amount of pressure indicated in any certificate or the period for which such certificate has been granted;
(f)ordering any structural alteration, addition or renewal to be made in or to a boiler or steam-pipe; or
(g)refusing sanction to the making of any structural alteration, addition or renewal to be made in or to a boiler or steam-pipe, may, within thirty days of the communication to him of such order, prefer an appeal to the Central Government in such form and manner, within such time and on payment of such fee as may be prescribed by the Central Government.
(2)Any person aggrieved by the refusal of an inspecting authority to grant a certificate of inspection of manufacture or erection may, within thirty days from the date of communication of such refusal, prefer an appeal to the Central Government.
(3)The procedure for disposing of an appeal shall be such as may be prescribed by the Central Government.
Numbers in the form 21[ are India Code footnote markers that record amendments. Source: India Code, Act 12 of 2025, PDF p.14.
Commentary
Section 25 provides appeals to the Central Government.
From the Chief Inspector (25(1)): a person aggrieved by an order of the Chief Inspector made under section 24 that:
- (a) refuses to register a boiler or to grant or renew a certificate;
- (b) refuses a certificate for the full period applied for;
- (c) refuses a certificate at the maximum desired pressure;
- (d) withdraws or revokes a certificate or provisional order;
- (e) reduces the pressure or period in a certificate;
- (f) orders a structural alteration, addition or renewal to a boiler or steam-pipe; or
- (g) refuses sanction for such work,
may appeal within thirty days of communication, in the form and manner, within the time and on payment of the fee prescribed by the Central Government (section 39(2)(h)).
From an inspecting authority (25(2)): a person aggrieved by refusal of a certificate of inspection of manufacture or erection (see section 8 and section 9) may appeal within thirty days of communication.
Procedure (25(3)): prescribed by the Central Government. A revision of the Central Government's order may be sought under section 26.
Predecessor in the Boilers Act, 1923: s.20. Appeal to the Central Government follows old s.20; the machine crosswalk's top match (old s.26B) is not the predecessor.
- Appeal lies against 'an order made under section 24 by the Chief Inspector'; the old text covered 'an original or appellate order' of the Chief Inspector.
- Form, manner, time and fee are prescribed by the Central Government; old s.20(3) covered manner only.
- Refusing sanction for alterations is a separate ground (g) and now covers a boiler 'or steam-pipe'; the old text said boiler.
- Thirty-day limits for Chief Inspector orders and inspecting authority refusals unchanged.
Compare the two official texts before relying on this summary.
Candidate 1923 match found automatically (80% similar), not yet confirmed by a reviewer.
| 1923 candidate | Heading | Heading sim. | Text sim. |
|---|---|---|---|
| s.26B | Appeal | 100% | 63% |
| s.20 | Appeals to appellate authority | 55% | 96% |
| s.20A | Power of Central Government to revise order of appellate authority | 86% | 67% |
Word-level comparison with 1923 s.26B (candidate)
struck = only in 1923 text · highlighted = only in 2025 text. India Code footnote markers are removed before comparing.