The Boilers Act, 2025 · Chapter III
Section 18. Alteration and renewal of steam-pipe or boiler components
Not yet checked against the official India Code text; verify before relying on it.
18. Alteration and renewal of steam-pipe or boiler components.—(1) Where the owner of any boiler registered under this Act intends to make any structural alteration, addition or renewal in or to any steam-pipe or other boiler components attached to the boiler, he shall submit to the Chief Inspector a report in writing of his intention and send therewith such particulars of proposed alteration, addition or renewal, as may be specified by regulations.
(2)Any structural alteration, addition or renewal shall be made by a person possessing a boiler repairer certificate under the supervision of the competent person.
Numbers in the form 21[ are India Code footnote markers that record amendments. Source: India Code, Act 12 of 2025, PDF p.13.
Commentary
Section 18 covers structural alteration, addition or renewal of a steam-pipe or other boiler components attached to a registered boiler.
- Report first (18(1)): the owner who intends such work must submit a written report of the intention to the Chief Inspector, with the particulars specified by regulations (section 40(2)(zc)).
- Who does the work (18(2)): a person holding a boiler repairer certificate, under the supervision of a competent person.
Unlike section 17, this section asks for a report of intention rather than written authorisation. Making such work to a steam-pipe without first informing the Chief Inspector is an offence under section 29(a). The Chief Inspector may also direct, under section 13(1)(e), that the boiler's certificate ceases when such work is made to an attached steam-pipe.
Predecessor in the Boilers Act, 1923: s.13. Alteration of steam-pipes or other boiler components follows old s.13.
- Sub-section (1) now names 'any steam-pipe or other boiler components'; the old text said 'any boiler component'.
- Owner 'submits' a written report of intention with particulars specified by regulations (old: 'transmit', before making the change).
- Work still to be done by a boiler repairer certificate holder under competent person supervision.
Compare the two official texts before relying on this summary.
Candidate 1923 match found automatically (89% similar), not yet confirmed by a reviewer.
| 1923 candidate | Heading | Heading sim. | Text sim. |
|---|---|---|---|
| s.13 | Alteration and renewal to steam- pipes | 86% | 92% |
| s.12 | Alterations and renewals to boilers | 70% | 79% |
| s.8 | Renewal of certificate | 62% | 75% |
Word-level comparison with 1923 s.13 (candidate)
struck = only in 1923 text · highlighted = only in 2025 text. India Code footnote markers are removed before comparing.