The Boilers Act, 2025 · Chapter III
Section 8. Inspection during manufacture
Not yet checked against the official India Code text; verify before relying on it.
8. Inspection during manufacture.—(1) Every manufacturer, before commencing manufacture of a boiler or boiler components, shall engage an inspecting authority for carrying out inspection at such stages of manufacture as may be specified by regulations.
(2)The inspecting authority engaged under sub-section (1) shall follow such procedure for inspection and certification of boiler or boiler components as may be specified by regulations.
(3)Where, after inspection, the inspecting authority—
(a)is satisfied that the design and drawings of the boiler or the boiler components conforms to the standards as may be specified by regulations, it shall grant a certificate of inspection and stamp the boiler or boiler components, or both; or
(b)is of the opinion that the boiler or boiler components, or both, does not conform to such standards as may be specified by regulations, it may for reasons to be recorded in writing, refuse to grant such certificate:
Provided that no certificate shall be refused unless the inspecting authority has directed the manufacturer of the boiler or boiler components, or both, in writing to carry out such modifications or rectifications as it deems necessary and the inspecting authority is of the opinion that inspite of such direction, the manufacturer of the boiler or boiler components, or both, has not carried out the modifications or rectifications.
(4)The inspecting authority may, for the purposes of inspection under this section, charge such fee as may be specified by regulations.
Numbers in the form 21[ are India Code footnote markers that record amendments. Source: India Code, Act 12 of 2025, PDF p.9.
Commentary
Section 8 governs third-party inspection while a boiler or boiler components are being manufactured.
- Engage first (8(1)): every manufacturer must engage an inspecting authority before commencing manufacture, for inspection at the stages specified by regulations.
- Procedure (8(2)): the inspecting authority follows the inspection and certification procedure in the regulations.
- Outcome (8(3)): if satisfied that the design and drawings conform to the specified standards, it shall grant a certificate of inspection and stamp the boiler or components. If not, it may refuse, recording its reasons in writing.
- Proviso: refusal is allowed only after the inspecting authority has directed the manufacturer in writing to make modifications or rectifications and is of the opinion that they have not been carried out.
- Fee (8(4)): the inspecting authority may charge the fee specified by regulations.
The design certificate under 8(3)(a) is one of the conditions in section 7. A person aggrieved by a refusal can appeal to the Central Government within thirty days under section 25(2).
Predecessor in the Boilers Act, 1923: s.4D. Inspection during manufacture follows old s.4D, split into more sub-sections.
- The grant test in s.8(3)(a) refers to 'the design and drawings' conforming to standards; old s.4D(2)(a) referred to the boiler or component conforming.
- Refusal still requires a prior written direction to modify or rectify; fee still set by regulations.
- 'Issue a certificate' becomes 'grant a certificate'.
Compare the two official texts before relying on this summary.
Candidate 1923 match found automatically (98% similar), not yet confirmed by a reviewer.
| 1923 candidate | Heading | Heading sim. | Text sim. |
|---|---|---|---|
| s.4D | Inspection during manufacture | 100% | 96% |
| s.4E | Inspection during erection | 79% | 86% |
| s.4C | Conditions precedent for manufacture of boiler and boiler component | 55% | 70% |
Word-level comparison with 1923 s.4D (candidate)
struck = only in 1923 text · highlighted = only in 2025 text. India Code footnote markers are removed before comparing.