Section 14. Provisional order
Not yet checked against the official India Code text; verify before relying on it.
14. Provisional order.—(1) Where the Inspector reports the case of any boiler to the Chief Inspector under sub-section (4) of section 12, he may, if the use of such boiler or its components is not prohibited under clause (f) of sub-section (1) of section 13 as being in a dangerous condition, grant to the owner thereof a provisional order in writing, permitting the boiler to be used at a pressure not exceeding such maximum pressure as he thinks fit and in accordance with the regulations made under this Act, pending the receipt of the order of the Chief Inspector.
(2)Such provisional order shall cease to be in force—
(i)on the expiry of six months from the date on which it is granted; or
(ii)on receipt of the orders of the Chief Inspector; or
(iii)in any of the cases referred to in clauses (b), (c), (d), (e) and (f) of sub-section (1) of section 13, and on so ceasing to be in force, shall be surrendered to the Inspector.
Numbers in the form 21[ are India Code footnote markers that record amendments. Source: India Code, Act 12 of 2025, PDF p.12.
Commentary
Section 14 allows interim use of a boiler while registration is being decided.
- Grant (14(1)): once the Inspector has reported a boiler to the Chief Inspector under section 12(4), he may grant the owner a written provisional order permitting use, at a maximum pressure he thinks fit and in accordance with the regulations, pending the Chief Inspector's order. This is not available if use has been prohibited under section 13(1)(f) on the ground of dangerous condition.
- End (14(2)): the order ceases on the expiry of six months from grant, on receipt of the Chief Inspector's orders, or on any of the events in section 13(1)(b) to (f), such as an accident, a move or a structural alteration.
- Surrender: once it ceases, the provisional order must be surrendered to the Inspector.
Failing to surrender it is a minor penalty under section 27(i). The Chief Inspector may also revoke a provisional order under section 16.
Predecessor in the Boilers Act, 1923: s.9. Provisional order provision is essentially the same as old s.9, split into two sub-sections.
- Six-month validity, ceasing events and surrender to the Inspector are unchanged.
- Bar on grant now refers to use of 'such boiler or its components' prohibited as dangerous under s.13(1)(f).
- Cross-references updated to ss.12(4) and 13.
Compare the two official texts before relying on this summary.
Candidate 1923 match found automatically (98% similar), not yet confirmed by a reviewer.
| 1923 candidate | Heading | Heading sim. | Text sim. |
|---|---|---|---|
| s.9 | Provisional orders | 97% | 98% |
| s.11 | Revocation of certificate or provisional order | 100% | 63% |
| s.7 | Registration | 48% | 70% |
Word-level comparison with 1923 s.9 (candidate)
struck = only in 1923 text · highlighted = only in 2025 text. India Code footnote markers are removed before comparing.