Regulation 1. Short title, application and commencement
Not yet checked against the official Gazette; verify before relying on it.
1. Short title, application and commencement. ─ (1) These regulations may be called the Indian Boiler Regulations, 2026.
(2)These regulations shall apply to all boilers including those working on the principles of natural circulations, forced circulation and forced flow with no fixed steam and water line.
(3)They shall come into force on the date of their publication in the Official Gazette.
In short
Regulation 1 names the regulations, says which boilers they cover and when they start.
- Name: the Indian Boiler Regulations, 2026.
- Coverage: all boilers, explicitly including natural-circulation, forced-circulation and forced-flow (once-through) boilers that have no fixed steam and water line. Once-through and supercritical designs are therefore inside the scope from the outset.
- Start date: the date of publication in the Official Gazette. The Gazette issue is dated 1 October 2026 (Gazette of India, Extraordinary, Part III Sec. 4, No. 596).
Things to keep in mind
- The notification says the 2026 regulations are made "in supersession of the Indian Boiler Regulations, 1950, except as respects things done or omitted to be done before such supersession". Things done or omitted under the 1950 regulations before the supersession are saved; whether a particular approval, registration or certificate continues, and on what terms, depends on the applicable savings and transitional provisions. How a particular existing approval is treated is a question for the Inspectorate, and for legal advice if needed.
- The parent law is the Boilers Act, 2025 (in force 1 May 2025). See section 40 for the Board's power to make regulations.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 623 | Application | 100% | Chapter XV (DPIIT scan), image 1 |
Amendment history of the candidate IBR 1950 regulation: Reg. 623 (2 amendments)
IBR 1950 regulation 623 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 623 page for its amendments.
| Reg. 623, Reg. 624, Reg. 625 | |||||||||||
Reg. 624 Requirements
Reg. 625 Sampling Sampling shall be done following general directions given in 2 of IS:3025-1964*. In particular, the following points shall be observed :
| |||||||||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 1, Regulation 1, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.489. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.