Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration

Regulation 321. Submission of manufacturing drawings and the particulars of boilers in advance

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 721–722Table

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

321.Submission of manufacturing drawings and the particulars of boilers in advance.─ (1) In the case of land boilers and boiler components including spares made in India for use in the States, the manufacturing drawings and the particulars of materials, design and construction of boilers shall be submitted by the makers of the boilers or boiler components or spares, as the case may be to the Inspecting Authority of the State, where the principal parts of the boilers will be manufactured, for examination and approval before commencement of the manufacture of boilers.

(2)In the case of boilers and boiler components including spares made outside India for use in the State, the manufacturing drawings and particulars of the material, design and construction, of boilers shall be submitted initially to the Inspecting Authority in the country of manufacture for examination and approval.

(3)The manufacturing drawings and the particulars of materials, design and construction in the case of fired boilers of steam generating capacity 100 Tons/hour and above and that of Waste heat boiler of 20 Tons/hour and above including boiler components and spares thereof shall then be submitted to the Technical Adviser (Boilers) for selection of latest materials with high strengths and use in high temperature and pressure, for the safety. Thereafter, the manufacturing drawings and the particulars of materials, design and construction approved by the Inspecting Authority shall be sent to the Chief Inspector of Boilers of the State where the boiler will be installed and used, for final examination and approval before commencement of manufacture so as to avoid questions arising at the time of erection and registration of the boiler.

(4)The manufacturing drawings and the particulars of materials, design and construction in the case of fired boilers of steam generating capacity less than 100 Tons/hour and that of Waste heat boiler of less than 20 Tons/hour including boiler components and spares thereof approved by the Inspecting Authority shall be submitted to the Chief Inspector of Boilers of the State where the boiler will be installed and used, for final examination and approval before commencement of manufacture so as to avoid question arising at the time of erection and registration of the boiler.

(5)The Inspecting Authority or the Chief Inspector or both, as the case may be, shall, after examination of the manufacturing drawings and the particulars intimate to the proposer whether they are satisfied with materials, design, construction and fitness of the parts for the intended pressure and, if not, what modification is necessary therein. When the manufacturing drawings and the particulars of boilers have been approved, the Inspector or Competent Person, as the case may be, in making his examination shall see that the design and the particulars of construction as approved have been carefully followed and that the material corresponds with the approved particulars.

(6)The fees for the scrutiny of the manufacturing drawings and the particulars of the materials, design and construction of boilers and boiler components including spares under sub-regulations (1) or (2) shall be on the scale prescribed in Table8/3 subject to a maximum of Rs. 50,000. When the manufacturing drawings have been scrutinised and in respect of them alterations have been suggested and the same are resubmitted for scrutiny, separate fee at the rate of ten percent of the fee for the first scrutiny of the drawing shall be payable, if the manufacturing drawings contain alterations other than those previously suggested.

(7)The arrangement drawings showings the broad details of modifications or conversions of the existing boiler shall be subject to the approval of the Chief Inspector of Boilers of the State where the boiler is intended for modification or conversion is registered.

(8)If the detailed manufacturing drawings are got approved by the Inspecting Authority of the State where parts will be manufactured and inspected, no separate compliance of sub-regulation (7) is required.

Table – 8/10
Fees for scrutiny of manufacturing drawings (regulation 321)

Category No.ProductRegulation No.Calculation criteriaFee in Rs.Remarks
(1)(2)(3)(4)(5)(6)
1Boilers, and boiler
components
including spares
321(6)Heating
Surface Area
Corresponding Fee
specified in regulation
305
(Maximum Rs. 50,000)
Scrutiny
2Boilers, and boiler
components
including spares
321(6)Heating
Surface Area
10% of Scrutiny FeeAlteration

Table structure read from the Gazette PDF, page 722. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Category Product          Regulation  Calculation   Fee in Rs.               Remarks
   No.                    No.           criteria

(1)  (2)                        (3)   (4)               (5)                  (6)
                          321(6)
1    Boilers, and boiler              Heating       Corresponding Fee        Scrutiny
                          321(6)      Surface Area  specified in regulation
     components                                     305

     including spares

                                                    (Maximum Rs. 50,000)

2    Boilers, and boiler              Heating       10% of Scrutiny Fee      Alteration

     components                       Surface Area

     including spares

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 321 requires manufacturing drawings and particulars of materials, design and construction to be approved before manufacture starts, and sets who approves them depending on where the boiler is made and how large it is.

Key points

  • (1) Boilers, components and spares made in India: drawings go to the Inspecting Authority of the State where the principal parts will be manufactured.
  • (2) Made outside India: drawings go first to the Inspecting Authority in the country of manufacture.
  • (3) Fired boilers of 100 Tons/hour and above, and waste heat boilers of 20 Tons/hour and above (with their components and spares): drawings also go to the Technical Adviser (Boilers). The drawings approved by the Inspecting Authority are then sent to the Chief Inspector of the State where the boiler will be installed, for final approval before manufacture.
  • (4) Smaller boilers (below those capacities): drawings approved by the Inspecting Authority go to the Chief Inspector of the State of installation for final approval before manufacture.
  • (5) The approving authority tells the proposer whether it is satisfied or what modifications are needed. During examination, the Inspector or Competent Person checks that the approved design was followed and the material matches.
  • (6) Scrutiny fees follow the scale in Table 8/3 of regulation 305, up to a maximum of Rs. 50,000. A resubmission with alterations other than those suggested costs ten percent of the first scrutiny fee. Table 8/10 summarises this.
  • (7) Arrangement drawings for modifying or converting an existing boiler need approval of the Chief Inspector of the State where it is registered.

Watch out

  • (8) Sub-regulation (7) need not be complied with separately if the detailed manufacturing drawings were approved by the Inspecting Authority of the State where the parts are made and inspected.
  • The aim of final approval by the Chief Inspector is to avoid questions at erection and registration, so it must happen before manufacture begins.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
721–722
PDF page index
721–722 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 0d82506efcba0da4
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 321, Regulation 321, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.721–722. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.