Indian Boiler Regulations, 2026 · Chapter 8 · Inspection and Testing of Boilers and Pipes during Construction and Boiler Registration
Regulation 323. Submission of plans of steam-pipes
Not yet checked against the official Gazette; verify before relying on it.
323. Submission of plans of steam-pipes.─ (1) Plans of steam pipes including mountings and fittings shall be submitted with the prescribed fee to the Inspecting Authority before construction and to the Chief Inspector at the time of registration of the boiler for his decision whether the pipes and their arrangement comply with the regulations.
(2)(a) The fees for examination of plans and the particulars of materials, design and construction of steam pipes before the commencement of manufacture of the steam pipes shall be at the rate specified in Table – 8/11.
(b)The fees for examination of plans and the particulars of materials, design and construction of any fitting, mountings and for fittings like de-superheaters, steam receivers, separators, fee shall be as specified in
Table 8/11.
Table – 8/11
Original extracted text of the table above, continued (diagnostic)
Fees for scrutiny of plans of steam pipes and fittings (regulation 323)
| Category No. | Product | Regulation No. | Calculation Criteria | Fee in Rs. | Remarks |
|---|---|---|---|---|---|
| (1) | (2) | (3) | (4) | (5) | (6) |
| 1 | Plans of Steam Pipes | 323(2)(a) | For 30 meters of piping or part thereof | 200 (Min Rs 500) | Scrutiny |
| 2 | Plans of Steam Pipes | 323(2)(a) | Based on Scrutiny Fee | 10% of Scrutiny Fee | Alteration |
| 3 | Fittings, Mountings and components (without heat transfer) like valves, dished ends, hand hole covers, man hole covers, flanges etc. | 323(2)(b) | Each Category of identical fittings | 300 for each category | Scrutiny and alteration |
| 4 | Fittings like De- superheaters, steam receivers, separators | 323(2)(b) | Each Category of identical fittings | 500 for each category | Scrutiny and alteration |
Table structure read from the Gazette PDF, pages 723, 724. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
Category Product Regulation Calculation Fee in Rs. Remarks
No. No. Criteria
(1) (2) (4) (5) (6)
1 Plans of Steam Pipes (3) 200 Scrutiny
323(2)(a) For 30 meters (Min Rs 500)
of piping or
part thereof
2
3 Plans of Steam Pipes 323(2)(a) Based on 10% of Alteration
Scrutiny Fee Scrutiny Fee
4
Fittings, Mountings and 323(2)(b) Each Category 300 for each Scrutiny and
components (without of identical category alteration
heat transfer) like valves, fittings
dished ends, hand hole
covers, man hole covers,
flanges etc.
Fittings like De- 323(2)(b) Each Category 500 for each Scrutiny and
superheaters, steam of identical category alteration
receivers, separators fittingsNote: Scrutiny: Scrutiny of manufacturing drawings
Alteration: Alteration of manufacturing drawings
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Plans of steam pipes, including mountings and fittings, must be submitted with the fee to the Inspecting Authority before construction, and to the Chief Inspector at registration of the boiler, for a decision on whether the pipes and their arrangement comply with the regulations.
Key points
- (1) Two submissions: Inspecting Authority before construction, Chief Inspector at registration.
- (2)(a) Fees for examining steam pipe plans before manufacture are in Table 8/11. Scrutiny of pipe plans is charged per 30 meters of piping or part thereof, with a minimum. Alterations are charged at 10% of the scrutiny fee.
- (2)(b) Fittings, mountings and components without heat transfer (valves, dished ends, hand hole and manhole covers, flanges) are charged per category of identical fittings. De-superheaters, steam receivers and separators have a separate, higher per-category fee.
- See the Official text tab for the fee amounts.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 323, Regulation 323, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.723–724. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.