255. Steam pipes and fittings.─ The pressure and temperature limits within which pipes, tees, branches, etc., are to be used, shall be in accordance with Table 7/4as given below:
Table 7/4: Maximum allowable working pressure and temperature
| Serial Number | Material group as per Regulation 8 | Method of manufacture | Maximum allowable working pressure | Maximum permissible temperature | Product Form |
|---|---|---|---|---|---|
| °C | |||||
| (1) | (2) | (3) | (4) | (5) | (6) |
| 1. | M1/Gr1, M1/Gr2 | Cold drawn seamless | No restriction | As per Table 2/1 of Regulation 30 | Straight, bends or fittings |
| 2. | Hot finished seamless | No restriction | As per Table 2/1 of Regulation 30 | -do- | |
| 3. | Butt welded [Max. nominal bore allowable 102mm] | 21 kg/cm2 (g) | 260 | -do- | |
| 4. | Electric Resistance welded | No restriction | As per Table 2/1 of Regulation 30 | -do- | |
| 5. | Cast Steel | Castings | No restriction | 454 | -do- |
| 6. | M3/Gr1, M3/Gr2, M4/Gr1 | Cold drawn seamless and Castings | No restriction | As per Table 2/1 of Regulation 30 | -do- |
| 7. | M5A/Gr1 | Cold drawn seamless and hot finished seamless | No restriction | As per Table 2/1 of Regulation 30 | -do- |
Table structure read from the Gazette PDF, page 652. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
Serial Material group Method of manufacture Maximum Maximum Product
Number as per allowable permissible Form
Regulation 8 (3) working temperature
(1) Cold drawn seamless pressure (6)
1. (2) °C Straight,
M1/Gr1, (4) (5) bends or
2. M1/Gr2 No restriction As per Table 2/1 of fittings
Regulation 30 -do-
3. Hot finished seamless No restriction
4. As per Table 2/1 of
Regulation 30
5.
6. Butt welded [Max. nominal bore 21 kg/cm2 (g) 260 -do-
allowable 102mm]
7. Electric Resistance welded No restriction As per Table 2/1 of -do-
Regulation 30
Cast Steel Castings No restriction 454 -do-
M3/Gr1, Cold drawn seamless and No restriction
M3/Gr2, Castings As per Table 2/1 of -do-
M4/Gr1
M5A/Gr1 Cold drawn seamless and hot Regulation 30
finished seamless
No restriction As per Table 2/1 of -do-
Regulation 30Parts of this extracted text look garbled; read the Gazette page before using any value.
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
The pressure and temperature limits for pipes, tees, branches and similar parts are set by Table 7/4. It is arranged by material group (the table heading says "as per Regulation 8", but the material groups are those of Table 2/1 in regulation 30), method of manufacture and product form.
Key points
- Most combinations of material and manufacturing method have no pressure restriction in this table (the pressure still has to be justified by the design calculations), with temperature limited as per Table 2/1 of regulation 30.
- Butt welded pipe is limited to 21 kg/cm2 (g) and 260 °C, with a maximum nominal bore of 102mm.
- Cast steel castings have no pressure restriction but a temperature limit of 454 °C.
Watch out
- The table layout is broken in the extracted text. Check the Gazette page for which material groups and methods sit on each row.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 255, Regulation 255, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.651–652. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.