261. Screwed on flanges.─ (1) Where flanges are secured by screwing, the screw thread on the pipes and in the flanges shall be arranged to end at a point just inside the back of boss of the flange and after the flange has been screwed on, the pipe shall be expanded into the flange by a roller expander.

(2)Such screwed and expanded flanges may be used for steam for a maximum allowable working pressure of

31.5 kg/cm2 (g) and maximum temperature of 399 0C and for feed for a maximum allowable working pressure of 42 kg/cm2 (g).

Independent explanation — not the law · draft · engineer review in progress

In short

Screwed-on flanges are allowed only with a specific thread arrangement and expansion, and within set pressure and temperature limits.

Key points

  • (1) The thread on the pipe and flange must end just inside the back of the flange boss. After screwing on, the pipe must be expanded into the flange with a roller expander.
  • (2) Such flanges may be used for steam up to a maximum allowable working pressure of 31.5 kg/cm2 (g) and 399°C, and for feed up to 42 kg/cm2 (g).

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
410Flanges100%Chapter X (DPIIT scan), image 4
135Screwed Stays70%Chapter III (DPIIT scan), image 6

Amendment history of the candidate IBR 1950 regulations: Reg. 135 (1 amendment)

IBR 1950 regulation 410 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 410 page for its amendments.

Reg. 410, Reg. 411, Reg. 412
RIVETED STEEL BOILERS

Flange-Thickness and Drilling

The thickness and drilling of flanges of standpipes shall be in accordance with the Appendix (E).



Reg. 411
RIVETED STEEL BOILERS

Pads

These shall comply with Regulation 155.



Reg. 412
RIVETED STEEL BOILERS

Unstayed Flat-End Plates

The working pressure of unstayed flat-end plates shall be determined by the following formula:

W.P. = 2S(t-2)² Eqn. (98)
D²

Where,

t = thickness of plate in thirty-seconds of an inch.
W.P. = Working pressure in pounds per square inch.
D = Diameter in inches of the pitch circle of the bolts or rivets when the plate is attached to an outside flange or the internal diameter of the shell when the plate is attached to an inside flange.
S = Minimum tensile stress of the plate in tons per square inch.

In no case shell the thickness of an unstayed flat-end plate be less than 3/8 inch.

Where an unstayed flat-end plate is pierced for electrodes or other fittings by openings having a diameter not greater than 2 ½ inches and the pitch of the openings in inches is not less than four times the diameter of the openings in inches, compensation is not required.

Where the diameter of the openings in an unstayed flat-end plate is greater than 2 ½ inches or the pitch in inches is less than four times the diameter of the openings, adequate compensation shall be provided in the manner described in Regulations 170, 171 and 186.

IBR 1950 regulation 135 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 135 page for its amendments.

Reg. 135
SCREWED STAYS
Screwed Stays

a) Screwed stays and the holes for these shall be screwed with a continuous thread.
b) The screwed threads of the stay shall be clean free from checks or imperfections, of full depth, correct Whitworth form and a good fit in the holes. The middle portion shall preferably be turned down to the bottom of the thread.
c) The stays shall be screwed with fine threads of not less than 11 threads per inch.
d) The diameter of the stay over the threads shall not be less than ¾ inch or twice

the thickness of the firebox plate whichever is the greater.
e) The pitch of the stays at the furnace of vertical boilers shall not exceed 14 times the thickness of the furnace plate.
f) Where the stays are not fitted with nuts, the ends shall be riveted over to form substantial heads.

Alternatively stays may be screwed through the shell and firebox plates and the projecting ends shall be substantially fillet welded in an approved manner. The projection of the end of the stay from the surface of the plate shall be not less than one quarter of the diameter of the stay but in no case less than ¼ inch. The full end of the stay shall be visible on completion of the welding.
g) Crown stays of Loco type boilers shall either be fitted with nuts or riveted over on the fire side.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
655
PDF page index
655 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 2bf7dded929679f1
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 261, Regulation 261, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.655. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.