Indian Boiler Regulations, 2026 · Chapter 7 · Pipes and Fittings

Regulation 270. Socket weld joints

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 659Formula / symbols

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

270. Socket weld joints.─ (1) Socket weld joints may be used with carbon and low alloy steel pipes not exceeding 60.3 mm. outside diameter.

(2)Such welds shall not be used where fatigue, severe erosion or severe corrosion is expected to occur.

(3)The maximum allowable working pressure of the socket weld fittings shall be determined in accordance with equation (7/1) (regulation 256).

(4)The thickness of the socket weld fittings shall not be less than 1¼ times the nominal thickness of pipe and the material shall be compatible with the associated piping.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Referenced provisions

Reg. 256

Independent explanation — not the law · draft · engineer review in progress

In short

Socket weld joints are allowed on small carbon and low alloy steel pipes, with limits on service and fitting thickness.

Key points

  • (1) Only for carbon and low alloy steel pipes not exceeding 60.3 mm outside diameter.
  • (3) Maximum allowable working pressure of socket weld fittings is found with Equation (7/1) of regulation 256.
  • (4) Fitting thickness must be at least 1¼ times the nominal pipe thickness, and the material must be compatible with the piping.

Watch out

  • (2) Socket welds must not be used where fatigue, severe erosion or severe corrosion is expected.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
659
PDF page index
659 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash d2efe483bc979c55
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 270, Regulation 270, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.659. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.