Indian Boiler Regulations, 2026 · Chapter 7 · Pipes and Fittings
Regulation 268. Tests for Class II pipelines
Not yet checked against the official Gazette; verify before relying on it.
268. Tests for Class II pipelines.─(1)All pipelines under this classification shall be subjected to hydraulic test on completion of erection.
(2)(a) On completion of the first ten production welds made by each welder, one of the welds shall be cut out for test purposes or alternatively, the welder shall prepare a test specimen made up of two similar lengths of piping welded in a position as closely representative of a selected production weld as is practicable.
(b)The test specimen shall be subjected to visual examination and bend tests.
(3)Two percent of the remainder of the welds made by each welder shall be selected at random and cut out for test purpose, or, alternatively the welders shall prepare a test specimen made up of two similar lengths of piping welded in a position as closely representative of a selected production weld as far as practicable and the test specimen shall be subjected to visual examination and bend tests.
(4)Notwithstanding anything contained in sub-regulations (2) and (3), the bend tests shall be dispensed with, in case the welds have been non-destructively tested in the following manner:
(a)For piping of over 102 mm bore, five per cent of the welds made by each welder on a pipeline with a minimum of two welds per welder, selected at random shall be subjected to a non-destructive examination by radiographic or other approved methods.
(b)For piping of102 mm bore and under, one per cent of the welds made by each welder on a pipeline with a minimum of one weld per welder, selected at random shall be subjected to non-destructive examination by radiographic or other approved technique.
In short
This regulation sets the tests for Class II pipelines (see regulation 266).
Key points
- (1) All Class II pipelines must be hydraulically tested on completion of erection.
- (2) After each welder's first ten production welds, one weld is cut out for testing, or the welder makes a representative test specimen from two similar lengths of pipe. It gets visual examination and bend tests.
- (3) Two percent of each welder's remaining welds are chosen at random and cut out, or replaced by a representative test specimen, for visual examination and bend tests.
- (4) Bend tests under (2) and (3) are dispensed with if welds are examined by radiographic or other approved NDE as follows:
- over 102 mm bore: five per cent of each welder's welds, minimum two per welder, at random;
- 102 mm bore and under: one per cent, minimum one per welder, at random.
- Failed specimens are handled under regulation 269.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 268, Regulation 268, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.658–659. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.