Indian Boiler Regulations, 2026 · Chapter 7 · Pipes and Fittings
Regulation 271. Butt welded joints
Not yet checked against the official Gazette; verify before relying on it.
271. Butt welded joints.─ (1) Butt welded joints as applicable shall be subjected to non-destructive examination by radiographic, radioscopy or other approved methods such as ultrasonic testing including phased array ultrasonic testing, magnetic particle inspection or liquid dye penetrant inspection.
(2)When radioscopic examination is to be performed in lieu of radiography on welded components, the following requirements shall be met:-
(a)A written procedure shall be submitted for approval to the Inspecting Authority which shall contain the following:-
(i)material and the thickness range;
(ii)equipment qualifications;
(iii)test object scan plan;
(iv)radioscopic parameters;
(v)image processing parameters;
(vi)image display parameters;
(vii)image archiving requirements;
(viii)accept-reject criteria (code reference);
(ix)performance evaluation;
(x)Operator identification.
(b)The system shall be aided with an image processor to enhance the quality of the radioscopic images and system performance quality shall exhibit-
(i)a thin section contrast sensitivity of 3%;
(ii)a thick section contrast sensitivity of 2%;
(iii)a spatial resolution of 3 line pairs per mm;.
(iv)IQI sensitivity - 2% of the joint thickness when wire IQI's are to be used, the wire diameter axis shall be oriented along the axis of the least sensitivity of the system.
(c)Radioscopes are to be properly marked to co-relate with particular part of joint represented.
(d)The radioscopic examination data shall be recorded and stored on videotape, magnetic disk or optical disk or any other electronic storage device at the maker's plant for a sufficient period after the date of radioscopic examination as specified by the Inspecting Authority, Efficient radioscopic examination record recall shall be made available at any time over the record retention period and shall be traceable to the test objects.
(e)When repair has been performed as a result of radioscopic examination, the repaired areas shall be re-examined using the same radioscopic technique to evaluate the effectiveness of the repair.
(f)To aid in proper interpretation of the radioscopic examination data, the details of the technique used shall accompany the data. As a minimum, the information shall include the approved procedure requirements and system performance test data
In short
Butt welded joints must be non-destructively examined, as applicable. The regulation also sets the conditions for using radioscopy instead of radiography.
Key points
- (1) Permitted methods: radiographic, radioscopy, or other approved methods such as ultrasonic testing (including phased array), magnetic particle inspection or liquid dye penetrant inspection.
- (2)(a) For radioscopy in lieu of radiography, a written procedure must be submitted to the Inspecting Authority for approval. It must cover material and thickness range, equipment qualifications, scan plan, radioscopic, image processing and display parameters, archiving, accept-reject criteria (code reference), performance evaluation and operator identification.
- (2)(b) The system must use an image processor and show thin section contrast sensitivity of 3%, thick section contrast sensitivity of 2%, spatial resolution of 3 line pairs per mm, and IQI sensitivity of 2% of joint thickness.
- (2)(c) Radioscopes must be marked to correlate with the part of the joint they represent.
- (2)(d) Data must be stored electronically at the maker's plant for the period the Inspecting Authority specifies, with records retrievable and traceable to the test objects.
- (2)(e) Repaired areas must be re-examined with the same radioscopic technique.
- (2)(f) Technique details, at least the approved procedure requirements and system performance test data, must accompany the data.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 271, Regulation 271, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.659–660. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).