Indian Boiler Regulations, 2026 · Chapter 11 · Standard Conditions for the Design and Construction of Economisers, Feed Pipes, Feed Heaters and Other Similar Vessels

Regulation 382. Procedure at subsequent Inspection

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 753

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

382. Procedure at subsequent Inspection.─ (1) (a)After economiser has been cleaned, the Competent Person shall make a thorough examination so far as its construction permits.

(b)The external condition of the tubes shall be carefully noted for wasting especially at the feed inlet end and all accessible tubes shall be calibered.

(c)The internal surfaces of cast iron tubes shall be closely observed for graphitic wasting as far as it is possible and in the event of any tube failure, these shall be broken up for scrutiny so that the general internal condition of the other tubes may be estimated.

(2)Where tubes or other parts are wasted, the strength shall be re-calculated.

(3)The scraper gear shall be examined to note if any parts are missing, if the length of travel is adequate and if the scrapers are correctly adjusted.

(4)All cap bolts shall be inspected and also the condition and position of the dampers and baffles.

(5)The record of each inspection and calculations shall be entered in the Memorandum of Inspection Book.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 382 sets what the Competent Person checks at each subsequent inspection of an economiser.

Key points

  • (1)(a) After cleaning, make a thorough examination as far as the construction permits.
  • (1)(b) Note external wasting of tubes, especially at the feed inlet end, and caliper all accessible tubes.
  • (1)(c) Watch the inside of cast iron tubes for graphitic wasting. If a tube fails, break it up to judge the internal condition of the other tubes.
  • (2) Where tubes or other parts are wasted, re-calculate the strength.
  • (3) Check the scraper gear for missing parts, adequate travel and correct adjustment.
  • (4) Inspect all cap bolts and the condition and position of dampers and baffles.
  • (5) Enter the record and calculations in the Memorandum of Inspection Book.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
526Procedure at subsequent inspection100%Chapter XI (DPIIT scan), image 8

Amendment history of the candidate IBR 1950 regulation: Reg. 526 (1 amendment)

IBR 1950 regulation 526 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 526 page for its amendments.


Reg. 526
, Reg. 527, Reg. 528
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure at subsequent inspection
a)

After the economiser has been cleaned the Inspector shall make a thorough examination so far as its construction permits. The external condition of the tubes should be carefully noted for wasting especially at the feed inlet end and all accessible tubes should be calibered. The internal surfaces of cast iron tubes should be closely observed for graphitic wasting as far as it is possible and in the event of any tube failure these should be broken up for scrutiny so that the general internal condition of the other tubes may be estimated.

b) Where tubes or other parts are wasted, the strength should be recalculated.
c) The scraper gear should be examined to note if any parts are missing if the length of travel is adequate and if the scrapers are correctly adjusted.
d) All cap bolts are to be inspected, also the condition and position of the dampers and baffles.
e) The record of each inspection and calculations will be entered in the Memorandum of Inspection Book.


Reg. 527

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Procedure for Hydraulic test

Every economiser for registration shall be hydraulically tested in the presence of an Inspector to 1 ½ times the working pressure. Hydraulic tests of economisers at subsequent examinations shall when required by the Inspector, be made after the inspection. The test pressure to be applied to economisers at subsequent examinations shall be from 1-1/4  to 1-1/2 times the working pressure of the economisers. During the test, all parts externally and in the flues shall be noted for leakage.


Reg. 528

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES

Memorandum of Inspection Book

In this book the Inspector shall enter all particulars and dimensions of the economiser with the required calculations for the various parts together with details of hydraulic test. At subsequent inspection the Inspector shall enter all notes pertaining to the condition of the various parts.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
753
PDF page index
753 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 764ab37f256502a9
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 382, Regulation 382, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.753. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).