BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026

Chapter 11 — Standard Conditions for the Design and Construction of Economisers, Feed Pipes, Feed Heaters and Other Similar Vessels

38 regulations (357–394)Gazette starts p.742

Regulation headings are not yet verified against the official Gazette. Entries in [square brackets] are editorial navigation labels, not Gazette wording.

← Chapter 10: Electrode Boilers · Chapter 12: Shell Type Boilers of Welded Construction → · Figures in Chapter 11

  1. 357. Application of standard condition and exceptions thereto
  2. 358. General requirements
  3. 359. Modification of formula
  4. 360. Maker’s certificate for steel economisers
  5. 361. Hydraulic test for new economisers
  6. 362. Workmanship and manufacture
  7. 363. Process of manufacture
  8. 364. Test bars
  9. 365. Number of tensile tests
  10. 366. Standard test piece
  11. 367. Design requirements
  12. 368. Joint bolts and studs for cast iron economisers
  13. 369. Economiser water outlet temperature
  14. 370. Construction of Tubes
  15. 371. Maximum allowable working pressure of tubes
  16. 372. Construction of headers
  17. 373. Maximum allowable working pressure of headers
  18. 374. Attachment of tubes to headers
  19. 375. Bolts, studs joints and Flanges
  20. 376. Valves and mountings
  21. 377. Maximum allowable working pressure for feed piping
  22. 378. Steel feed pipes
  23. 379. Feed Heaters and similar vessels fitted to feed pipes
  24. 380. Preparation for inspection
  25. 381. Procedure for registration
  26. 382. Procedure at subsequent Inspection
  27. 383. Procedure for Hydraulic Test
  28. 384. Memorandum of Inspection Book
  29. 385. Registration book
  30. 386. Transfer of memorandum of inspection book and registration book
  31. 387. Grant of certificate
  32. 388. Casual visits
  33. 389. Economiser rating
  34. 390. Registration fee
  35. 391. Fee for renewal of certificate
  36. 392. Engraving of registry number
  37. 393. Inspection of feed pipes
  38. 394. Submission of plans of feed pipes