Indian Boiler Regulations, 2026
Chapter 10 — Electrode Boilers
23 regulations (334–356)Gazette starts p.731
Regulation headings are not yet verified against the official Gazette. Entries in [square brackets] are editorial navigation labels, not Gazette wording.
← Chapter 9: Safety of Persons inside Boilers · Chapter 11: Standard Conditions for the Design and Construction of Economisers, Feed Pipes, Feed Heaters and Other Similar Vessels → · Figures in Chapter 10
- 334. Application
- 335. General requirements
- 336. Materials
- 337. Construction and workmanship of fusion welded boilers
- 338. Selection of test pieces
- 339. Tensile Test
- 340. Bend Test
- 341. Nick Break Test
- 342. Retests
- 343. Specimens after Tests
- 344. Heat Treatment
- 345. Hydraulic Test
- 346. Determination for maximum allowable working pressure
- 347. Welds and compensation for manholes and branches
- 348. Manholes and other opening in shells
- 349. Dished end plates with pressure on concave side
- 350. Unstayed flat end plates
- 351. Seating and Mounting
- 352. Hydraulic Test
- 353. Determination of maximum allowable working pressure
- 354. End Plates
- 355. Manholes and others opening in the shells
- 356. Mounting, fittings and connections