Regulation 334. Application

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 731

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

334. Application.─ This Chapter applies to electrode steam boilers for all voltages for any working pressure and for temperatures not exceeding 343°C and electrode boilers shall only be of the following construction:

(a)Fusion welded steel boilers;

(b)Seamless shell steel boilers.

Independent explanation — not the law · draft · engineer review in progress

In short

The chapter on electrode boilers applies to electrode steam boilers of all voltages and any working pressure, for temperatures not exceeding 343°C. Electrode boilers may only be of (a) fusion welded steel construction or (b) seamless shell steel construction.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
623Application100%Chapter XV (DPIIT scan), image 1

Amendment history of the candidate IBR 1950 regulation: Reg. 623 (2 amendments)

IBR 1950 regulation 623 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 623 page for its amendments.

Reg. 623, Reg. 624, Reg. 625
FEED WATER FOR BOILER

Scope

a)

This chapter lays down specifications for feed water and boiler water for low and medium pressure boilers (boilers operating up to 60 kg/cm2).
b) For boilers operating at pressures higher than 60 kg/cm2, better quality of water to IS:10496-1983 may be adopted.


Reg. 624

Requirements

The water shall comply with the requirements given in Table 1 when tested by the methods prescribed in col. 6 and 7 of the table.


Reg. 625

Sampling

Sampling shall be done following general directions given in 2 of IS:3025-1964*. In particular, the following points shall be observed :

a) It is necessary that a stainless steel or monel metal coil is fitted on the sampling cock so that the temperature of the water sample will be well below the boiling point at atmospheric pressure and there is no risk of aeration and concentration due to flashing into steam; and
b) Samples of feed water shall be collected from the delivery of the boiler feed pump, samples of boiler water from the top drum, and samples of condensate from the delivery of the condensate extraction pump.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
731
PDF page index
731 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 061c5f2895a5e284
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 334, Regulation 334, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.731. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.