351. Seating and Mounting.─ (1) Where the working pressure is not greater than 18 Kg/Cm², mountings having screwed ends not exceeding 19 mm, standard pipe thread may be used.

(2)The mountings may be screwed.─

(a)directly into the boiler shell plates, nuts being fitted on the waterside; or

(b)into steel distance piece (see Fig. 10/14) the length of thread engaged being is no case less than the bore of the mounting plus 6 mm.

Fig. 10/14: Typical mild steel Distance piece for mountings

(3)(a) The distance piece shall be made solid from mild steel and shall be screwed into the boiler pieces and fitted with nuts on the water side.

(b)The walls of the distance plates shall be not less than 6 mm in thickness at the bottom of the thread.

(4)Where castings are fabricated by fusion welding, they shall be stress-relieved heat treatment before attachment to the boiler.

(5)Method of attachment by welding of connectors to shells are shown in Figs 10/15 to 10/19 of this regulation.

(6)(a) Water gauges and pressure gauge syphons may be attached direct to the boiler shell or ends without the intervention of a pad or standpipe, provided they are flanged and secured by studs.

(b)Nuts of full thickness shall be fitted on inside of the boiler, if the studs are screwed through the plate.

(7)Where the design pressure exceeds 18 Kg/cm² or the nominal bore of the mounting exceeds 19 mm, mountings shall be attached by short standpipes or pads.

(8)Flanges and pads in contact with the boiler shall be formed to bed closely to the plate to which they are attached.

(9)(a) (i) Where short standpipes are used, the flanges shall be machined on the jointing and bolting surfaces and shall be close to the plate.

(ii)The caulking edge of the flange shall be machined or flame cut by machine.

(iii)Where separate flanges are fitted they shall be attached as shown in Figs. 7/10,7/26, 7/27 and 7//32 of chapter 7.

(b)Standpipes fabricated by fusion welding shall be stress-relieved by heat treatment before attachment to the boiler. Where the outside diameter of a standpipe is not greater than 127 mm plus twice the thickness of the shell plate in mm, the standpipe may be secured by fusion welding in the manner shown in Figures 10/20 and 10/21 of chapter 10 without subsequent stress-relieving by heat treatment.

(c)Where minimum weld attachment for standpipes bore is 127 mm and under, with plate thickness(Ts) equal to 1.5 Tn or greater as shown in Fig. 10/20 and 10/21, minimum weld attachments for standpipes shall not require compensating plates.

(d)Where the outside diameter of the standpipe exceeds 127 mm plus twice the thickness of the shell plate, the standpipe may be secured by fusion welding as shown in Figs. 10/22, 10/23, 10/24 and 10/25 of chapter 10 and the standpipe and the entire plate to which it is attached shall be stress-relieved by heat treatment.

(e)Standpipes shall be designed to withstand the internal pressure, but additional thickness may be required for:

(i)Compensation (see regulation 179).

(ii)Stresses imposed on the standpipe by expansion and contraction of externally attached pipe work.

(f)The thickness of the standpipe shall be not less than 6 mm or that given by the following formulae, whichever is the greater:

(i)for working pressure upto and including 250 lb./sq. in.,
t = D+4

(ii)for working pressure above 250 lb./sq. in., t = 1.4 D + 6 where, t = thickness of standpipe in thirty-seconds of an inch,

D= outside diameter of the standpipe in inches.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Referenced provisions

Reg. 179

Figures cited in this regulation (5, exact crops of the Gazette)

Gazette Fig. 7/7: Typical Branch Pieces
Fig. 7/7Typical Branch Pieces
View Gazette page 669 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Gazette Fig. 7/10: Welding Neck Flange
Fig. 7/10Welding Neck Flange
View Gazette page 669 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Gazette Fig. 7/26
Fig. 7/26(no caption printed with this figure)
View Gazette page 672 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Gazette Fig. 7/27
Fig. 7/27(no caption printed with this figure)
View Gazette page 672 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Gazette Fig. 10/14: Typical mild steel Distance piece for mountings
Fig. 10/14Typical mild steel Distance piece for mountings
View Gazette page 737 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 351 sets how mountings are attached to electrode boilers: when screwed mountings are allowed, how distance pieces, pads and standpipes are used, when stress relieving is needed, and the minimum standpipe thickness.

Key points

  • (1)–(2) Where the working pressure is not greater than 18 Kg/cm², mountings with screwed ends not exceeding 19 mm standard pipe thread may be used. They may be screwed directly into the shell plate with nuts on the water side, or into a steel distance piece (Fig. 10/14) with thread engagement not less than the mounting bore plus 6 mm.
  • (3) Distance pieces are solid mild steel, screwed in and fitted with nuts on the water side, with walls not less than 6 mm thick at the bottom of the thread.
  • (4) Castings fabricated by fusion welding are stress-relieved before attachment. Welded connector attachments are shown in Figs 10/15 to 10/19.
  • (6) Water gauges and pressure gauge syphons may be attached directly to the shell or ends if flanged and secured by studs, with full-thickness nuts inside where studs pass through the plate.
  • (7) Above 18 Kg/cm² design pressure, or above 19 mm nominal bore, mountings are attached by short standpipes or pads.
  • (8)–(9)(a) Flanges and pads must bed closely on the plate. Standpipe flanges are machined on jointing and bolting surfaces.
  • (9)(b)–(d) Welded standpipes are stress-relieved before attachment. A standpipe with outside diameter not greater than 127 mm plus twice the shell thickness may be welded as in Figures 10/20 and 10/21 without later stress relieving. Larger ones are welded as in Figs. 10/22 to 10/25, and the standpipe and the entire plate are stress-relieved.
  • (9)(e)–(f) Standpipes are designed for internal pressure, with extra thickness possibly needed for compensation or pipe-work expansion stresses. Thickness is not less than 6 mm or the formula value for the working pressure range, whichever is greater.

Watch out

  • (9)(c) Minimum weld attachments for standpipes of 127 mm bore and under, with shell thickness (Ts) equal to 1.5 Tn or greater, do not need compensating plates.
  • The standpipe thickness formulae use imperial units (thirty-seconds of an inch, inches, lb./sq. in.). Check the Official text tab before using them.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
409Seatings for Mounting83%Chapter X (DPIIT scan), image 2
635Stand pipes, nozzles, pads and seatings for mounting and their attachments75%Chapter XV (DPIIT scan), image 3
IBR 1950 regulation 409 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 409 page for its amendments.

Reg. 409

RIVETED STEEL BOILERS

Seating for Mounting

Where the working pressure is not greater than 250 lb./sq.in. mountings have screwed ends not exceeding ¾ inch, standard Pipe Thread may be used.

The mountings may be screwed:

i) Directly into the boiler shell plates, nuts being fitted on the waterside or
(ii)  

Into steel distance pieces (see Fig.35), the length of thread engaged being is no case less than the bore of the mountings plus one quarter inch.

That distance piece shall be made solid from mild steel and shall be screwed into the boiler pieces and fitted with nuts on the water side. The walls of the distance plates shall be not less in thickness than one-quarters inch at the bottom of the thread.
Method of attachment by welding of connector to sells are shown in Figures 36 to 40.

Water gauges and pressure gauge siphons may be attached direct to the boiler shell or ends without the intervention of a pad or standpipe, provided they are flanged and secured by studs. If the studs are screwed through the plate, nuts of full thickness shall be fitted on the inside of the boiler.

Where the design pressure exceeds 250 lb./sq. in or the nominal bore of the mounting exceeds ¾ inch mountings shall be attached by short standpipes or pads.

Flanges and pads in contact with the boiler shall be formed to bed closely to the plate to which they are attached.

Standpipes:- Where short standpipes are used the flanges shall be machined on the jointing and bolting surfaces and shall bed closely to the plate. The caulking edge of the flange shall be machined or flame cut by machine. Where separate flanges are fitted they shall be attached as shown in Fig 28, 29, 30 and 33.

Standpipes fabricated by fusion welding shall be stress relieved by heat treatment before attachment to the boiler.

Where the outside diameter of a standpipe is not greater than 5 inches plus twice the thickness of the shell plate in inches, the standpipe may be secured by fusion welding in the manner shown in Figures 41-A and 41-B without subsequent stress relieving by heat treatment.

MINIMUM WELD ATTACHMENT FOR STANDPIPES 5 INCH BORE AND UNDER WITH PLATE THICKNESS Ts EQUAL TO 1.5 Tn OR GREATER FIG. 41-A AND 41-B MINIMUM WELD ATTACHMENT FOR STAND PIPES UP TO AND INCLUDING 4 INCH BORE NOT REQUIRING COMPENSATING PLATES 

NOTE: 
TWO TYPES SHOWN A & B ARE REQUIRED ONLY WHERE THE ELECTRODES AND TECHNIQUES TO BE USED HAVE BEEN SHOWN AS SEPARATELY PREPARED TEST SPECIMENS TO GIVE FULL PENETRATION WITH SOUND WELDING AT THE ROOT AND THE GROOVES. 

Where the outside diameter of the standpipe exceeds 5 inches plus twice the thickness of the shell plate in inches, the standpipe may be secured by fusion welding as shown in Figure 42 and 43. The standpipe and the entire plate to which it is attached shall be stress relieved by heat treatment.

Standpipes shall be designed to withstand the internal pressure, but additional thickness may be required for:

(1) Compensation (see Regulation 407).
(2) Stress imposed on the standpipe by expansion and contraction of externally attached pipework.
The thickness of the standpipe shall be not less than ¼ inch or that give by the following formulae, whichever is the greater:
(a) for working pressure up to and including 250 lbs./ sq. in…t = D+4
(b) for working pressure above 250 lbs. / sq. in …t =1.4 D+6
where t = thickness of standpipe in thirty-seconds of an inch.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
737–740
PDF page index
737–740 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 12e01ee0b26f2b4c
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 351, Regulation 351, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.737–740. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.