Indian Boiler Regulations, 2026 · Chapter 16 · Heat Exchangers and Pressure Vessels
Regulation 560. Application
Not yet checked against the official Gazette; verify before relying on it.
560. Application.─(1) This chapters hall apply to steam accumulators, steam coil air preheaters, high pressure(HP) heaters, deaerators and blow down tanks operating above 3.5 kg/cm2(g).
(2)Any steam consuming equipment where steam is condensed or open to atmosphere shall not be covered under this chapter.
In short
This Chapter applies to steam accumulators, steam coil air preheaters, high pressure (HP) heaters, deaerators and blow down tanks operating above 3.5 kg/cm2(g).
Watch out
- (2) Steam consuming equipment where steam is condensed or open to atmosphere is not covered by this Chapter.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 623 | Application | 100% | Chapter XV (DPIIT scan), image 1 |
Amendment history of the candidate IBR 1950 regulation: Reg. 623 (2 amendments)
IBR 1950 regulation 623 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 623 page for its amendments.
| Reg. 623, Reg. 624, Reg. 625 | |||||||||||
Reg. 624 Requirements
Reg. 625 Sampling Sampling shall be done following general directions given in 2 of IS:3025-1964*. In particular, the following points shall be observed :
| |||||||||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 560, Regulation 560, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.861. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.