BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 16 · Heat Exchangers and Pressure Vessels

Regulation 564. Tubes and pipes

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 861

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

564. Tubes and pipes.─ The tubes and pipes shall comply with the relevant provisions of Chapter-2.

Independent explanation — not the law · draft · engineer review in progress

In short

Tubes and pipes for the vessels covered by this Chapter must comply with the relevant provisions of Chapter-2.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
631Tubes100%Chapter XV (DPIIT scan), image 3
145Steel and Wrought Iron Tubes75%Chapter III (DPIIT scan), image 7
218Steel and Wrought Iron Tubes75%Chapter IV (DPIIT scan), image 14
IBR 1950 regulation 145 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 145 page for its amendments.

Reg. 145, Reg. 146
BOILER TUBES SUBJECT TO EXTERNAL PRESSURE
Steel and Wrought Iron Tubes

Both plain and stay smoke tubes may be made either of wrought iron or steel and may be electric-resistance-welded lap-welded or weldless.


Reg. 146
BOILER TUBES SUBJECT TO EXTERNAL PRESSURE Fitting of Plain Tubes

a) Plain tubes shall be expanded at both ends. The expanding shall be parallel throughout the full thickness of the tube plate. Plain tubes may also be bell-mouthed, beaded, or welded at the gas inlet end.
b) Where stay tubes are not fitted, the ends of the tubes shall be beaded over at the fire box end and beaded or bell-mouthed at the other end. If bell-mouthed the tubes shall protrude not less than ¼ inch beyond the tube plate.
IBR 1950 regulation 218 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 218 page for its amendments.

Reg. 216, Reg. 217, Reg. 218, Reg. 219

BOILER AND SUPERHEATER TUBES SUBJECT TO INTERNAL PRESSURE

The maximum working pressure for the tube shall be determined by equation No.87 (see Regulation 338).

The maximum thickness of the tubes shall comply with the table given in Regulation 338 (b).

Reg. 217

HEADERS AND SECTION BOXES OF WATER TUBE BOILERS

See Eqn.(88), Reg. (340).

Reg. 218

BOILER TUBES (SMOKE ) SUBJECT TO EXTERNAL PRESSURE

Steel and Wrought Iron Tubes - (a) The maximum working pressure for the tubes shall be : -

W.P. = 100 (t - 6) Eqn.(56)
D

Where
t = the thickness of the tubes in 100ths of an inch,

D = the external diameter of the tubes in inches.

(b) No tube shall be less than 12 S.W.G.(.104") thick.

Reg. 219
HEADERS AND SECTION BOXES OF WATER TUBE BOILERS

Brass and Copper Tubes

The thickness of tapered brass and copper smoke tubes for locomotive boilers shall, in the case of tubes of an external diameter of 1-1/2 to 1-7/8 inches inclusive, be not less than 12 S.W.G. (.104inch) at the smoke-box end and10 S.W.G.(.128 inch) at the other end in the case of tubes of an external diameter of 2 to 2-3/8 inches inclusive, the thickness, at the smoke-box end shall not be less than 11 S.W.G. (.116 inch) and at the other end not less than 9 S.W.G. (.144 inch).

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
861
PDF page index
861 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 0a3d0c5504123216
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 564, Regulation 564, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.861. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.