Boilers Act, 1923 → Boilers Act, 2025
Draft section-by-section comparison
Draft comparison of the Boilers Act, 2025 with the Boilers Act, 1923 (as published by India Code). AI-assisted, not yet reviewed by a lawyer. Each 2025 section page shows the full list of differences under "1923 vs 2025 Act".
| 2025 section | 1923 predecessor | Draft classification | Summary |
|---|---|---|---|
| s.1 Short title, commencement and application | s.1, s.3, s.33 | merged | Combines the 1923 short title and commencement clause (s.1), the exclusions (s.3) and applicability to Government boilers (s.33) into one section. |
| s.2 Definitions | s.2 | substantive change | Most definitions are carried over from old s.2; several are reworded, a few are added, and 'prescribed' now refers to rules only. |
| s.3 Central Boilers Board | s.27A | substantive change | Board membership is carried over from old s.27A; the Board's functions are now stated and its procedure clause is reworded. |
| s.4 Technical Adviser | s.4A | wording changed | Technical Adviser provision is essentially the same as old s.4A, with minor additions. |
| s.5 Chief Inspector, Deputy Chief Inspector and Inspector | s.5 | wording changed | Appointment and powers of the Chief Inspector, Deputy Chief Inspectors and Inspectors follow old s.5, renumbered, with one added sub-section. |
| s.6 Competent authority to grant welders certificate | s.4B | wording changed | Welders certificate procedure follows old s.4B; the description of the competent authority moves into this section. |
| s.7 Conditions precedent for manufacture of boiler and boiler components | s.4C | wording changed | Conditions before manufacturing boilers or components follow old s.4C. |
| s.8 Inspection during manufacture | s.4D | wording changed | Inspection during manufacture follows old s.4D, split into more sub-sections. |
| s.9 Inspection during erection | s.4E | substantive change | Inspection during erection follows old s.4E, with a refusal now communicated to the owner as well. |
| s.10 Conditions precedent for repairing boiler and boiler components | s.4F | substantive change | Conditions for repairs follow old s.4F, with a safety condition and a boiler repairer certificate provision added. |
| s.11 Prohibition of use of unregistered or uncertified boiler | s.6 | substantive change | Prohibition on using unregistered or uncertified boilers follows old s.6, with a new sub-section on proficiency and competency certificates. |
| s.12 Registration | s.7 | substantive change | Registration follows old s.7, split into nine sub-sections, with fee, form and marking assigned to rules or regulations. |
| s.13 Renewal of certificate | s.8 | substantive change | Renewal of certificate follows old s.8; the application and renewal terms are now tied to regulations. |
| s.14 Provisional order | s.9 | wording changed | Provisional order provision is essentially the same as old s.9, split into two sub-sections. |
| s.15 Use of boiler pending grant of certificate | s.10 | substantive change | Use of a boiler pending renewal follows old s.10(1); old s.10(2) is not carried forward. |
| s.16 Revocation of certificate or provisional order | s.11 | substantive change | Revocation grounds follow old s.11, with one ground narrowed. |
| s.17 Alteration and renewal of boiler | s.12 | wording changed | Alterations to a registered boiler follow old s.12. |
| s.18 Alteration and renewal of steam-pipe or boiler components | s.13 | wording changed | Alteration of steam-pipes or other boiler components follows old s.13. |
| s.19 Duty of owner at examination | s.14 | substantive change | Owner's duties at examination follow old s.14, now covering boiler components, with refusal by the competent person made discretionary. |
| s.20 Production of certificate and provisional order | s.15 | unchanged | Duty to produce a certificate or provisional order is the same as old s.15. |
| s.21 Transfer of certificate and provisional order | s.16 | substantive change | Hand-over of the certificate to a new owner follows old s.16, extended to legal heirs. |
| s.22 Powers of entry of Inspector | s.17 | wording changed | Inspector's power of entry is essentially the same as old s.17. |
| s.23 Report of accident | s.18 | wording changed | Accident reporting follows old s.18, with the inquiry provisions gathered into sub-section (4). |
| s.24 Appeal to Chief Inspector | s.19 | wording changed | Appeal to the Chief Inspector follows old s.19. |
| s.25 Appeal to Central Government | s.20 | substantive change | Appeal to the Central Government follows old s.20; the machine crosswalk's top match (old s.26B) is not the predecessor. |
| s.26 Application for revision of order | s.20A | substantive change | Revision by the Central Government replaces old s.20A with a general revision of its own appeal orders. |
| s.27 Minor penalties | s.22 | wording changed | Minor penalties are the same as old s.22. |
| s.28 Penalties for illegal use of boiler | s.23 | substantive change | Penalties for illegal use follow old s.23, with the daily additional penalty counted after the first day. |
| s.29 Punishment for certain offences | s.24 | wording changed | Offences punishable with imprisonment follow the three surviving clauses of old s.24 ('Other penalties'); the crosswalk wrongly listed old s.24 as unmatched. |
| s.30 Penalty for tampering with register mark | s.25 | wording changed | Tampering with the register mark follows old s.25. |
| s.31 Penalty for breach of rules or regulations | s.30 | substantive change | Penalty for breach of rules or regulations follows old s.30, now covering any rule or regulation and using 'penalty' for repeat breaches. |
| s.32 Recovery of penalties | s.32, s.29 | substantive change | Recovery provision follows old s.32 and adds use of the amounts collected (from old s.29(1)(i)). |
| s.33 Limitation and previous sanction for prosecution | s.26 | unchanged | Limitation and sanction for prosecution are the same as old s.26. |
| s.34 Trial of offences | s.27 | unchanged | Trial of offences is the same as old s.27. |
| s.35 Adjudication of penalties | s.26A | wording changed | Adjudication of penalties is essentially the same as old s.26A. |
| s.36 Appeal against orders of adjudicating officer | s.26B | wording changed | Appeal against adjudication orders is essentially the same as old s.26B. |
| s.37 Power of Central Government to give directions | s.31A | unchanged | Central Government directions to States are the same as old s.31A. |
| s.38 Exemptions | s.34, s.4 | merged | Combines the State power to exclude areas (old s.4) with the exemptions in old s.34. |
| s.39 Power of Central Government to make rules | s.28A | substantive change | Central Government rule-making follows old s.28A(1) and (1A), with the list matched to the new sections; the laying clause moves to s.41. |
| s.40 Power of Board to make regulations | s.28, s.31 | substantive change | Board regulation-making follows old s.28(1), re-listed by section of the new Act; the laying clause moves to s.41. |
| s.41 Rules and regulations to be laid before Parliament | s.28, s.28A | merged | Combines the Parliament laying clauses for regulations (old s.28(2)) and Central rules (old s.28A(2)). |
| s.42 Power of State Government to make rules | s.29, s.31 | substantive change | State rule-making follows old s.29, with the list matched to the new sections. |
| s.43 Finality of orders | s.21 | unchanged | Finality of orders is the same as old s.21, with updated cross-references. |
| s.44 Power to remove difficulties | — | new | Power to remove difficulties has no counterpart in the 1923 Act. |
| s.45 Repeal and savings | — | new | Repeals the 1923 Act and sets out savings; old s.35 (itself repealed in 1927) is not a predecessor. |
1923 provisions not carried forward (draft): s.1(2) (Extent clause 'It extends to the whole of India' has no counterpart in the 2025 Act.); s.2A (Rule that references to steam-pipes include feed-pipes is not repeated; the 2025 'steam-pipe' definition only adds connected fittings of a feed-pipe, and 'boiler components' includes feed piping.); s.2B (Rule that references to a boiler include an economiser is not repeated; economisers are listed within 'boiler components' in s.2(d).); s.8(5A) (Separate power for the competent person to charge an inspection fee is not repeated; the renewal fee is part of the application under s.13(3).); s.10(2) (Bar on pending-renewal use where an accident, move or alteration occurs after expiry is not repeated in s.15.); s.20A(2) (Revision procedure (records, technical advice, terms for variations from regulations) is not repeated in s.26.); s.31(2) (Publication of regulations and rules in the Gazettes with effect 'as if enacted in this Act' is not repeated; previous publication (31(1)) moved to ss.40 and 42.); s.35 (Already repealed by the Repealing Act, 1927; nothing to carry forward.)
Machine candidates (orientation only)
Each row is a machine candidate, uncertain until a reviewer confirms the pair and classifies the change.
| 2025 section | Top 1923 candidate | Text sim. | Machine hint | Outcome |
|---|---|---|---|---|
| s.1 Short title, commencement and application | s.1 Short title, extent and commencement | 92% | Similar wording (machine) | uncertain |
| s.2 Definitions | s.2 Definitions | 93% | Similar wording (machine) | uncertain |
| s.3 Central Boilers Board | s.27A Central Boilers Board | 83% | Modified (machine) | uncertain |
| s.4 Technical Adviser | s.4A Technical Adviser | 99% | Similar wording (machine) | uncertain |
| s.5 Chief Inspector, Deputy Chief Inspector and Inspector | s.5 Chief Inspector, Deputy Chief Inspectors and Inspectors | 96% | Similar wording (machine) | uncertain |
| s.6 Competent authority to grant welders certificate | s.4B Welders certificate | 94% | Similar wording (machine) | uncertain |
| s.7 Conditions precedent for manufacture of boiler and boiler components | s.4C Conditions precedent for manufacture of boiler and boiler component | 94% | Similar wording (machine) | uncertain |
| s.8 Inspection during manufacture | s.4D Inspection during manufacture | 96% | Similar wording (machine) | uncertain |
| s.9 Inspection during erection | s.4E Inspection during erection | 95% | Similar wording (machine) | uncertain |
| s.10 Conditions precedent for repairing boiler and boiler components | s.4F Conditions precedent for repairing boiler and boiler component | 89% | Modified (machine) | uncertain |
| s.11 Prohibition of use of unregistered or uncertified boiler | s.6 Prohibition of use of unregistered or uncertified boiler | 97% | Similar wording (machine) | uncertain |
| s.12 Registration | s.7 Registration | 97% | Similar wording (machine) | uncertain |
| s.13 Renewal of certificate | s.8 Renewal of certificate | 97% | Similar wording (machine) | uncertain |
| s.14 Provisional order | s.9 Provisional orders | 98% | Similar wording (machine) | uncertain |
| s.15 Use of boiler pending grant of certificate | s.10 Use of boiler pending grant of certificate | 90% | Modified (machine) | uncertain |
| s.16 Revocation of certificate or provisional order | s.11 Revocation of certificate or provisional order | 95% | Similar wording (machine) | uncertain |
| s.17 Alteration and renewal of boiler | s.12 Alterations and renewals to boilers | 94% | Similar wording (machine) | uncertain |
| s.18 Alteration and renewal of steam-pipe or boiler components | s.13 Alteration and renewal to steam- pipes | 92% | Similar wording (machine) | uncertain |
| s.19 Duty of owner at examination | s.14 Duty of owner at examination | 94% | Similar wording (machine) | uncertain |
| s.20 Production of certificate and provisional order | s.15 Production of certificates, etc | 98% | Similar wording (machine) | uncertain |
| s.21 Transfer of certificate and provisional order | s.16 Transfer of certificates, etc | 94% | Similar wording (machine) | uncertain |
| s.22 Powers of entry of Inspector | s.17 Powers of entry | 93% | Similar wording (machine) | uncertain |
| s.23 Report of accident | s.18 Report of accidents | 92% | Similar wording (machine) | uncertain |
| s.24 Appeal to Chief Inspector | s.19 Appeals to Chief Inspector | 97% | Similar wording (machine) | uncertain |
| s.25 Appeal to Central Government | s.26B Appeal | 63% | Weak match | uncertain |
| s.26 Application for revision of order | s.20A Power of Central Government to revise order of appellate authority | 84% | Modified (machine) | uncertain |
| s.27 Minor penalties | s.22 Minor penalties | 95% | Similar wording (machine) | uncertain |
| s.28 Penalties for illegal use of boiler | s.23 Penalties for illegal use of boiler | 97% | Similar wording (machine) | uncertain |
| s.29 Punishment for certain offences | s.27 Trial of offences | 70% | Modified (machine) | uncertain |
| s.30 Penalty for tampering with register mark | s.25 Penalty for tampering with register mark | 98% | Similar wording (machine) | uncertain |
| s.31 Penalty for breach of rules or regulations | s.30 Penalty for breach of rules | 95% | Similar wording (machine) | uncertain |
| s.32 Recovery of penalties | s.32 Recovery of fees etc | 96% | Similar wording (machine) | uncertain |
| s.33 Limitation and previous sanction for prosecution | s.26 Limitation and previous sanction for prosecutions | 99% | Similar wording (machine) | uncertain |
| s.34 Trial of offences | s.27 Trial of offences | 99% | Similar wording (machine) | uncertain |
| s.35 Adjudication of penalties | s.26A 77[“26A. Adjudication | 96% | Similar wording (machine) | uncertain |
| s.36 Appeal against orders of adjudicating officer | s.26B Appeal | 97% | Similar wording (machine) | uncertain |
| s.37 Power of Central Government to give directions | s.31A Power of Central Government to give directions | 94% | Similar wording (machine) | uncertain |
| s.38 Exemptions | s.34 Exemptions | 96% | Similar wording (machine) | uncertain |
| s.39 Power of Central Government to make rules | s.28A Power of Central Government to make rules | 85% | Modified (machine) | uncertain |
| s.40 Power of Board to make regulations | s.28 Power to make regulations | 70% | Modified (machine) | uncertain |
| s.41 Rules and regulations to be laid before Parliament | s.28A Power of Central Government to make rules | 97% | Similar wording (machine) | uncertain |
| s.42 Power of State Government to make rules | s.29 Power to make rules | 84% | Modified (machine) | uncertain |
| s.43 Finality of orders | s.21 Finality of orders | 97% | Similar wording (machine) | uncertain |
| s.44 Power to remove difficulties | s.4 Power to limit extent | 71% | Modified (machine) | uncertain |
| s.45 Repeal and savings | s.35 Repeal of enactments | 53% | Weak match | uncertain |
1923 sections with no top-ranked 2025 counterpart
s.2A Application of Act to feed pipes; s.2B Application of Act to economisers; s.3 Limitation of application; s.20 Appeals to appellate authority; s.24 Other penalties; s.31 Publication of regulations and rules; s.33 Applicability to the Government
Method: rapidfuzz token_set_ratio; 0.45*heading + 0.55*text(first 2500 chars). Matching on these scores alone produces false pairs: for example, s.25 "Appeal to Central Government" is matched to 1923 s.26B, but a reviewer would more likely consider 1923 s.20/20A.