Regulation 551. Shell type boilers

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 856–857

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

551. Shell type boilers.─(1) The inspection of shell type boilers shall be made at the following stages, namely:-

(i)material identification and inspection;

(ii)inspection of each component after completing welding and drilling;

(iii)assembly of boiler;

(iv)hydraulic test.

(2)In case of a boiler wholly or partly welded construction, the hydraulic test pressure shall be equal to two times the design pressure of the boiler.

(3)A test coupon shall be provided by the maker for conducting root and face bend tests.

Independent explanation — not the law · draft · engineer review in progress

In short

This regulation lists the construction inspection stages for shell type small industrial boilers and sets the hydraulic test pressure for welded ones.

Key points

  • (1) Inspection is made at these stages:
  • (i) material identification and inspection;
  • (ii) inspection of each component after welding and drilling are complete;
  • (iii) assembly of the boiler;
  • (iv) hydraulic test.
  • (2) For a boiler of wholly or partly welded construction, the hydraulic test pressure equals two times the design pressure of the boiler.
  • (3) The maker must provide a test coupon for root and face bend tests.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
856–857
PDF page index
856–857 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash ca2ffbd0fdb46092
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 551, Regulation 551, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.856–857. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.