BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 14 · Small Industrial Boilers

Regulation 550. Inspection and Testing

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 856

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

550. Inspection and Testing.─ The small industrial boilers shall be subjected to inspection during construction by an Inspecting Authority and the inspection of the boilers shall be made at the stages as given in regulations 551 and 552:

Referenced provisions

Reg. 551 · Reg. 552

Independent explanation — not the law · draft · engineer review in progress

In short

Small industrial boilers must be inspected during construction by an Inspecting Authority. The inspection stages are set out in regulation 551 for shell type boilers and regulation 552 for coil type, once through and water tube boilers.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
856
PDF page index
856 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash bb7ab58b741289c9
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 550, Regulation 550, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.856. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.