BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 14 · Small Industrial Boilers

Regulation 549. Design, construction, workmanship and method of computing the Maximum Allowable Working Pressure

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 856Figure referenced

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

549. Design, construction, workmanship and method of computing the Maximum Allowable Working Pressure.─ (1) (a) The construction except where otherwise specified shall be the same as those provided in the relevant provisions of the preceding chapters of these regulations.

(b)In case of fusion welded boiler, neither stress-relieving nor radiography of welded joints shall be required.

(2)(a) In small industrial boilers, unflanged steel tube plate may be inserted into the shell and welded for the entire thickness as shown in Figure 14/1 of this regulation with a fillet weld having a throat not less than 1¼ times the thickness of the shell or tube sheet whichever is smaller.

Figure14/1

(b)The minimum thickness of flanged welded tube sheets shall be 10 mm.

(c)The temperature of the heating element of electrically heated steam boilers shall be so controlled that it shall not exceed 650°C.

(3)(a) The tubes shall be made of steel.

(b)(i) The tubes holes shall be drilled full size with shells butt straps and ends bolted up in position or may be punched at least 13 mm smaller in diameter than full size and then drilled, reamed or finished full size with a rotating cutter.

(ii)The sharp edges and chips shall be removed, the plates and butt straps re-assembled metal to metal with pins fittings the holes and with tack bolts.

Parts of this extracted text look garbled; read the Gazette page before using any value.

Independent explanation — not the law · draft · engineer review in progress

In short

Small industrial boilers are built to the preceding chapters, except where this regulation relaxes or adds requirements for welding, tube plates, electric heating elements and tube holes.

Key points

  • (1)(a) Construction follows the relevant provisions of the preceding chapters unless otherwise specified.
  • (1)(b) For fusion welded boilers, neither stress-relieving nor radiography of welded joints is required.
  • (2)(a) An unflanged steel tube plate may be inserted into the shell and welded through its entire thickness, as shown in Figure 14/1. The fillet weld throat must be not less than 1¼ times the thickness of the shell or tube sheet, whichever is smaller.
  • (2)(b) Flanged welded tube sheets must be at least 10 mm thick.
  • (2)(c) In electrically heated steam boilers, the heating element temperature must be controlled so that it does not exceed 650°C.
  • (3)(a) Tubes must be made of steel.
  • (3)(b)(i) Tube holes are either drilled full size with the shells, butt straps and ends bolted up in position, or punched at least 13 mm smaller in diameter than full size and then drilled, reamed or finished full size with a rotating cutter.
  • (3)(b)(ii) Sharp edges and chips must be removed. The plates and butt straps are then re-assembled metal to metal, with pins fitting the holes and with tack bolts.

Watch out

  • Figure 14/1 does not come through in the extracted text. Check the Gazette page for the joint detail.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
416Construction and Workmanship100%Chapter X (DPIIT scan), image 5
624Construction and Workmanship100%Chapter XV (DPIIT scan), image 1

Amendment history of the candidate IBR 1950 regulations: Reg. 624 (1 amendment)

IBR 1950 regulation 416 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 416 page for its amendments.

Reg. 413, Reg. 414, Reg. 415, Reg. 416
RIVETED STEEL BOILERS

Thickness of Angle Rings

Where flange or angle rings are used for pressure purposes in no case shall the thickness after machining be less than 5/16 inch. The thickness shall be as given in Regulation 106.



Reg. 414
RIVETED STEEL BOILERS

Bolts, Nuts and Studs

These shall conform to Regulation 208.



Reg. 415
RIVETED STEEL BOILERS

Hydraulic Test

Each completed boiler shall pass the hydraulic adopted see Fig 44, 45, 46, 47, 48 & 49.



Reg. 416
FUSION WELDED BOILERS

Construction and Workmanship

Construction and workmanship shall comply with the provisions made in Chapter V for fusion welded drums subject to the following conditions, namely:-

Class I boilers shall comply with the requirements of Chapter V.
For end plate connection by welding, the type of steam shown in Figure 44 may be adopted.
Class II boilers shall comply with the following requirements.

The longitudinal seams shall comply with Regulation 253. For end plate connections by welding any of the following types of seams, may be adopted (see Figure 44,45,46,47,48 & 49 ).

Forms of welded joints for circumferential seams acceptable for  for all class of boilers

acceptable For Class II welded boilers

Forms of welded joints for circumferential seams acceptable for seamless shell boilers and for Class II boilers.

For plates over 3/4 inch thick, width of gap between the edges of the plates to be agreed upon by inspecting authority & manufacturer.

Forms of welded joints for circumferential seams acceptable for seamless shell boilers and for Class II boilers.

FORMS OF WELDED JOINTS FOR FLAT END PLATES FOR CLASS II BOILERS NOT EXCEEDING 20 INCH DIAMETER.

Class I Boilers, the working pressure of which exceeds 165 lbs./ sq. in. or the product of the working pressure in pounds per square inch and the internal diameter in inches exceeds 8250.

Class II Boilers, the working pressure of which is 165 lbs./sq. in. and below or the product of the working pressure in pounds per square inch and the internal diameter in inches is below 8250.

IBR 1950 regulation 624 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 624 page for its amendments.

Reg. 623, Reg. 624, Reg. 625
FEED WATER FOR BOILER

Scope

a)

This chapter lays down specifications for feed water and boiler water for low and medium pressure boilers (boilers operating up to 60 kg/cm2).
b) For boilers operating at pressures higher than 60 kg/cm2, better quality of water to IS:10496-1983 may be adopted.


Reg. 624

Requirements

The water shall comply with the requirements given in Table 1 when tested by the methods prescribed in col. 6 and 7 of the table.


Reg. 625

Sampling

Sampling shall be done following general directions given in 2 of IS:3025-1964*. In particular, the following points shall be observed :

a) It is necessary that a stainless steel or monel metal coil is fitted on the sampling cock so that the temperature of the water sample will be well below the boiling point at atmospheric pressure and there is no risk of aeration and concentration due to flashing into steam; and
b) Samples of feed water shall be collected from the delivery of the boiler feed pump, samples of boiler water from the top drum, and samples of condensate from the delivery of the condensate extraction pump.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
856
PDF page index
856 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash a09cadd803586085
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 549, Regulation 549, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.856. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.