Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 601 — SHELL TYPE BOILERS OF WELDED CONSTRUCTION
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 598, 599, 600. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 598, Reg. 599, Reg. 600, Reg. 601 | ||||||||||||||||||||||||||||||||||||||||||||||
Reg. 599 Cross Tubes
Reg. 600 Pads Welded to shell or the attachment of Flanged Mountings
Reg. 601
| ||||||||||||||||||||||||||||||||||||||||||||||
Earlier text: the 2008 DIPP web edition
Hydraulic and Hammer Tests:-
a)
(i)Class I Boilers – Each Class I Boiler shall, on completion of all welding and/or repairs and after heat-treatment, be subjected to a hydraulic test of 1.5 times the design pressure without any indication of weakness or defect.
(ii)Class II and Class III Boilers – Each Class II and Class III boilers shall be tested to a pressure twice the design pressure.
b)
(i)The test shall be witnessed by the Inspecting Authority or Inspecting Officer.
(ii)The test pressure shall be maintained for a period not less than 30 minutes.
It is important in the interest of safety that the boiler be properly vented, so as to prevent the formation of air pockets, before the test pressure as applied.
NOTE:-
1.It is recommended that the temperature of the water should not be less than 7°C during the hydraulic test.
2.It is further recommended that before the boiler is approached for close examination, the pressure shall be reduced to not less than 1.1 times the design pressure and not more than 0.9 times the hydraulic test pressure.
3.On completion of hydraulic test, release of pressure shall be gradual.
4.Deflection of different pressure parts shall be examined carefully and there shall not be any permanent set after release of pressure
c)If any repairs are found to be necessary during or subsequent to the hydraulic pressure test, the boiler shall again be subjected to the pressure test specified above after completion of the repairs and after any heat treatment.
NOTE:-
Observations and remarks of Inspecting Officer/Inspecting Authority should be recorded for filming with makers’ papers.
Amendments found
Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.
| Date | Notification | Part | Action | What changed (summary) | Web edition |
|---|---|---|---|---|---|
| 1997-03-19 | G.S.R. 172 OCR of scan | Substituted | Replaces regulation 601 on hydraulic and hammer tests: 1.5x design pressure for Class I, 2x for Class II/III, 30-minute hold, notes. | listed before the capture | |
| 2010-10-07 | G.S.R. 821(E) | Amended | Replaces 'Inspecting officer(s)' with 'Competent Person' wherever it occurs. | listed before the capture |