Indian Boiler Regulations, 2026 · Chapter 17 · Small Solar Boilers
Regulation 592. Design, construction, workmanship and the method of computing the maximum allowable working pressure
Not yet checked against the official Gazette; verify before relying on it.
592. Design, construction, workmanship and the method of computing the maximum allowable working pressure.─ (1) The construction except where otherwise specified shall be the same as those provided in the relevant provisions of the preceding chapters of these regulations.
(2)In the case of Fusion welded small solar boilers, radiography or stress relieving of the weld joints shall not be mandatory.
In short
Small solar boilers are built to the relevant provisions of the preceding chapters unless otherwise specified. For fusion welded small solar boilers, radiography and stress relieving of the weld joints are not mandatory.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 416 | Construction and Workmanship | 100% | Chapter X (DPIIT scan), image 5 |
| 624 | Construction and Workmanship | 100% | Chapter XV (DPIIT scan), image 1 |
Amendment history of the candidate IBR 1950 regulations: Reg. 624 (1 amendment)
IBR 1950 regulation 416 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 416 page for its amendments.
| Reg. 413, Reg. 414, Reg. 415, Reg. 416
Reg. 414
Reg. 415
Reg. 416
|
IBR 1950 regulation 624 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 624 page for its amendments.
| Reg. 623, Reg. 624, Reg. 625 | |||||||||||
Reg. 624 Requirements
Reg. 625 Sampling Sampling shall be done following general directions given in 2 of IS:3025-1964*. In particular, the following points shall be observed :
| |||||||||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 592, Regulation 592, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.866. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.