| Reg. 41 MATERIALS OF CONSTRUCTION COLD DRAWN SEAMLESS CAR BON STEEL BOILER, SUPERHEATER AND HEAT EXCHANGER TUBES FOR DESIGN METAL TEMPERATURES NOT EXCEEDING 454°C (850°F). Additional test before rejection |
| (i) If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other tubes of the same batch. If any of these tests fails, the batch of the tubes represented may be given a further heat treatment and entire set of test shall be repeated. (ii) If the repeat tests are satisfactory the tubes shall be accepted. If any failure in the tests should occur, the entire batch of the tubes shall be rejected. |
Earlier text: the 2008 DIPP web edition
MATERIALS OF CONSTRUCTION
COLD DRAWN SEAMLESS STEEL BOILER AND SUPERHEATER TUBES FOR DESIGN METAL TEMPERATURES NOT EXCEEDING 454°C (850°F).
Additional test before rejection
(a)Should a tube selected for testing purposes show definite signs of failure in any one or more of the tests specified in Regulation 38, 39 and 40, two further tests of the same kind may be made at the option of the manufacturer from two additional tubes selected from the same batch.
(b)If the repeat tests are satisfactory the tubes shall be accepted provided that in all other respects they fulfil the conditions of this Standard. Should either of the tubes fail in any test, the batch of tubes represented may be reheat-treated in accordance with Regulation 36(b) and then re-tested in accordance with Regulation 38, 39 and 40 but employing twice the number of test pieces. If these repeat tests are satisfactory, the tubes shall be accepted provided that in all other respects they fulfill the conditions of this Standard, but if definite defects are again shown, the batch of tubes which the test pieces represent shall be rejected.
Amendments found
Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.
| Date | Notification | Part | Action | What changed (summary) | Web edition |
|---|---|---|---|---|---|
| 2001-04-10 | G.S.R. 219 | Substituted | Replaced as part of the block substitution of regulations 36 to 56 (tube specifications). | listed before the capture |