Site hydraulic test sequence — regulations 297 and 298

Diagram, not to scaleEducational — not an approved or fabrication-ready designTechnical review pending — not independently verified
Pressure–time graph rising to test pressure, holding, dropping to maximum allowable working pressure and released, with a shaded 6 percent overshoot band and a checklist panel.

Shows the order of the site hydraulic test: preparation, gradual rise to 1.25 × design pressure (the +6 % line is the maximum permitted overshoot, not a target), 30-minute hold, reduction to MAWP for close visual inspection, release and examination inside and outside. The 10-consecutive-minute acceptance condition of 298(2) is shown separately from the 30-minute hold, with a checklist of the conditions in regs. 297–298.

Download

SVG — vector, for screens · PNG — image · PDF — print

Related provisions

Regulation 297 · Regulation 298 · Regulation 167

Basis
Schematic arrangement; no dimensions implied.
Units
—
Limitations
Schematic only; positions and sizes are illustrative.
Tool
Python SVG (svgkit) + headless Edge for PNG/PDF
Licence
CC BY 4.0 for this original drawing/model. Does not license the regulation text or Gazette figures.
Revision
v1.0 · 2026-11-20 · technical review: pending
File checksums
SHA-256 per file
  • SVG: 15ccce23f0a242533afe3aa3da910e706f1f56dd6b473b7a76f4929dd9122b18
  • PNG: feba12687a528398afcfbaa994c11131ab2e3710329d82fc5d0634a68f507265
  • PDF: b45942c6187653b70ebb0f5cc00ef65fd0bb5b99dd3ab08d7ee50e68b6744c79

The small IBRsource.com mark sits on its own layer (DXF) or group (SVG) and can be deleted. The CC BY 4.0 attribution requirement still applies if you remove it.

Educational drawing, not an approved or fabrication-ready design; verify against the Gazette (report a problem).