Original IBRsource drawing · diagram
Site hydraulic test sequence — regulations 297 and 298

Shows the order of the site hydraulic test: preparation, gradual rise to 1.25 × design pressure (the +6 % line is the maximum permitted overshoot, not a target), 30-minute hold, reduction to MAWP for close visual inspection, release and examination inside and outside. The 10-consecutive-minute acceptance condition of 298(2) is shown separately from the 30-minute hold, with a checklist of the conditions in regs. 297–298.